{"id":23742,"date":"2024-10-16T18:16:56","date_gmt":"2024-10-16T14:16:56","guid":{"rendered":"https:\/\/wyndhamgrandbatumigonio.com\/?post_type=news&#038;p=23742"},"modified":"2024-10-23T17:33:52","modified_gmt":"2024-10-23T13:33:52","slug":"wyndham-grand-batumi-gonio-aqua-1-installation-of-stained-glass-structures-4-5-floors-preparation-of-openings-installation-of-durable-and-environmentally-resistant-frames-2-installati","status":"publish","type":"news","link":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-installation-of-stained-glass-structures-4-5-floors-preparation-of-openings-installation-of-durable-and-environmentally-resistant-frames-2-installati\/","title":{"rendered":"Wyndham Grand Batumi Gonio. Aqua \u2014 1. Installation of stained glass structures, 4-5 floors Preparation of openings, installation of durable and environmentally resistant frames.  2. Installation of decorative boxes on balconies, 6-9 floors Design and construction of frame structure, secure fastening to ensure durability and safety.   3. Arrangement of mocap, 12th floor Creation of a sample finish, which allows to evaluate the appearance of the future hotel room.  4. Plastering of openings and preparation for hydro\/vapor insulation of stained glass windows, floors 2-8.   5. Diamond drilling of engineering holes, 7th and 20th floors Marking and drilling is carried out, which is necessary for installation of communications of the future hotel.   Anticorrosive works on the 1st floor, works on elevator shaft coverings, works on installation of gypsum plasterboard framework of internal partitions on the 3-5 floors and preparation of ceilings for installation of gypsum plasterboard framework on the 5th floor."},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"template":"","class_list":["post-23742","news","type-news","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Wyndham Grand Batumi Gonio. Aqua \u2014 1. Installation of stained glass structures, 4-5 floors Preparation of openings, installation of durable and environmentally resistant frames. 2. Installation of decorative boxes on balconies, 6-9 floors Design and construction of frame structure, secure fastening to ensure durability and safety.  3. Arrangement of mocap, 12th floor Creation of a sample finish, which allows to evaluate the appearance of the future hotel room. 4. Plastering of openings and preparation for hydro\/vapor insulation of stained glass windows, floors 2-8.  5. Diamond drilling of engineering holes, 7th and 20th floors Marking and drilling is carried out, which is necessary for installation of communications of the future hotel.  Anticorrosive works on the 1st floor, works on elevator shaft coverings, works on installation of gypsum plasterboard framework of internal partitions on the 3-5 floors and preparation of ceilings for installation of gypsum plasterboard framework on the 5th floor. &#8211; Wyndham Grand Batumi Gonio<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-installation-of-stained-glass-structures-4-5-floors-preparation-of-openings-installation-of-durable-and-environmentally-resistant-frames-2-installati\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Wyndham Grand Batumi Gonio. Aqua \u2014 1. Installation of stained glass structures, 4-5 floors Preparation of openings, installation of durable and environmentally resistant frames. 2. Installation of decorative boxes on balconies, 6-9 floors Design and construction of frame structure, secure fastening to ensure durability and safety.  3. Arrangement of mocap, 12th floor Creation of a sample finish, which allows to evaluate the appearance of the future hotel room. 4. Plastering of openings and preparation for hydro\/vapor insulation of stained glass windows, floors 2-8.  5. Diamond drilling of engineering holes, 7th and 20th floors Marking and drilling is carried out, which is necessary for installation of communications of the future hotel.  Anticorrosive works on the 1st floor, works on elevator shaft coverings, works on installation of gypsum plasterboard framework of internal partitions on the 3-5 floors and preparation of ceilings for installation of gypsum plasterboard framework on the 5th floor. &#8211; Wyndham Grand Batumi Gonio\" \/>\n<meta property=\"og:url\" content=\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-installation-of-stained-glass-structures-4-5-floors-preparation-of-openings-installation-of-durable-and-environmentally-resistant-frames-2-installati\/\" \/>\n<meta property=\"og:site_name\" content=\"Wyndham Grand Batumi Gonio\" \/>\n<meta property=\"article:modified_time\" content=\"2024-10-23T13:33:52+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-installation-of-stained-glass-structures-4-5-floors-preparation-of-openings-installation-of-durable-and-environmentally-resistant-frames-2-installati\/\",\"url\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-installation-of-stained-glass-structures-4-5-floors-preparation-of-openings-installation-of-durable-and-environmentally-resistant-frames-2-installati\/\",\"name\":\"Wyndham Grand Batumi Gonio. Aqua \u2014 1. Installation of stained glass structures, 4-5 floors Preparation of openings, installation of durable and environmentally resistant frames. 2. Installation of decorative boxes on balconies, 6-9 floors Design and construction of frame structure, secure fastening to ensure durability and safety. 3. Arrangement of mocap, 12th floor Creation of a sample finish, which allows to evaluate the appearance of the future hotel room. 4. Plastering of openings and preparation for hydro\/vapor insulation of stained glass windows, floors 2-8. 5. Diamond drilling of engineering holes, 7th and 20th floors Marking and drilling is carried out, which is necessary for installation of communications of the future hotel. Anticorrosive works on the 1st floor, works on elevator shaft coverings, works on installation of gypsum plasterboard framework of internal partitions on the 3-5 floors and preparation of ceilings for installation of gypsum plasterboard framework on the 5th floor. &#8211; Wyndham Grand Batumi Gonio\",\"isPartOf\":{\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/#website\"},\"datePublished\":\"2024-10-16T14:16:56+00:00\",\"dateModified\":\"2024-10-23T13:33:52+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-installation-of-stained-glass-structures-4-5-floors-preparation-of-openings-installation-of-durable-and-environmentally-resistant-frames-2-installati\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-installation-of-stained-glass-structures-4-5-floors-preparation-of-openings-installation-of-durable-and-environmentally-resistant-frames-2-installati\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-installation-of-stained-glass-structures-4-5-floors-preparation-of-openings-installation-of-durable-and-environmentally-resistant-frames-2-installati\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430\",\"item\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Wyndham Grand Batumi Gonio. Aqua \u2014 1. Installation of stained glass structures, 4-5 floors Preparation of openings, installation of durable and environmentally resistant frames. 2. Installation of decorative boxes on balconies, 6-9 floors Design and construction of frame structure, secure fastening to ensure durability and safety. 3. Arrangement of mocap, 12th floor Creation of a sample finish, which allows to evaluate the appearance of the future hotel room. 4. Plastering of openings and preparation for hydro\/vapor insulation of stained glass windows, floors 2-8. 5. Diamond drilling of engineering holes, 7th and 20th floors Marking and drilling is carried out, which is necessary for installation of communications of the future hotel. Anticorrosive works on the 1st floor, works on elevator shaft coverings, works on installation of gypsum plasterboard framework of internal partitions on the 3-5 floors and preparation of ceilings for installation of gypsum plasterboard framework on the 5th floor.\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/#website\",\"url\":\"https:\/\/wyndhamgrandbatumigonio.com\/\",\"name\":\"Wyndham Grand Batumi Gonio\",\"description\":\"The benefits of investing in a brand from the world&#039;s leading hotel chain Wyndham Grand\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/wyndhamgrandbatumigonio.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Wyndham Grand Batumi Gonio. Aqua \u2014 1. Installation of stained glass structures, 4-5 floors Preparation of openings, installation of durable and environmentally resistant frames. 2. Installation of decorative boxes on balconies, 6-9 floors Design and construction of frame structure, secure fastening to ensure durability and safety.  3. Arrangement of mocap, 12th floor Creation of a sample finish, which allows to evaluate the appearance of the future hotel room. 4. Plastering of openings and preparation for hydro\/vapor insulation of stained glass windows, floors 2-8.  5. Diamond drilling of engineering holes, 7th and 20th floors Marking and drilling is carried out, which is necessary for installation of communications of the future hotel.  Anticorrosive works on the 1st floor, works on elevator shaft coverings, works on installation of gypsum plasterboard framework of internal partitions on the 3-5 floors and preparation of ceilings for installation of gypsum plasterboard framework on the 5th floor. &#8211; Wyndham Grand Batumi Gonio","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-installation-of-stained-glass-structures-4-5-floors-preparation-of-openings-installation-of-durable-and-environmentally-resistant-frames-2-installati\/","og_locale":"en_US","og_type":"article","og_title":"Wyndham Grand Batumi Gonio. Aqua \u2014 1. Installation of stained glass structures, 4-5 floors Preparation of openings, installation of durable and environmentally resistant frames. 2. Installation of decorative boxes on balconies, 6-9 floors Design and construction of frame structure, secure fastening to ensure durability and safety.  3. Arrangement of mocap, 12th floor Creation of a sample finish, which allows to evaluate the appearance of the future hotel room. 4. Plastering of openings and preparation for hydro\/vapor insulation of stained glass windows, floors 2-8.  5. Diamond drilling of engineering holes, 7th and 20th floors Marking and drilling is carried out, which is necessary for installation of communications of the future hotel.  Anticorrosive works on the 1st floor, works on elevator shaft coverings, works on installation of gypsum plasterboard framework of internal partitions on the 3-5 floors and preparation of ceilings for installation of gypsum plasterboard framework on the 5th floor. &#8211; Wyndham Grand Batumi Gonio","og_url":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-installation-of-stained-glass-structures-4-5-floors-preparation-of-openings-installation-of-durable-and-environmentally-resistant-frames-2-installati\/","og_site_name":"Wyndham Grand Batumi Gonio","article_modified_time":"2024-10-23T13:33:52+00:00","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-installation-of-stained-glass-structures-4-5-floors-preparation-of-openings-installation-of-durable-and-environmentally-resistant-frames-2-installati\/","url":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-installation-of-stained-glass-structures-4-5-floors-preparation-of-openings-installation-of-durable-and-environmentally-resistant-frames-2-installati\/","name":"Wyndham Grand Batumi Gonio. Aqua \u2014 1. Installation of stained glass structures, 4-5 floors Preparation of openings, installation of durable and environmentally resistant frames. 2. Installation of decorative boxes on balconies, 6-9 floors Design and construction of frame structure, secure fastening to ensure durability and safety. 3. Arrangement of mocap, 12th floor Creation of a sample finish, which allows to evaluate the appearance of the future hotel room. 4. Plastering of openings and preparation for hydro\/vapor insulation of stained glass windows, floors 2-8. 5. Diamond drilling of engineering holes, 7th and 20th floors Marking and drilling is carried out, which is necessary for installation of communications of the future hotel. Anticorrosive works on the 1st floor, works on elevator shaft coverings, works on installation of gypsum plasterboard framework of internal partitions on the 3-5 floors and preparation of ceilings for installation of gypsum plasterboard framework on the 5th floor. &#8211; Wyndham Grand Batumi Gonio","isPartOf":{"@id":"https:\/\/wyndhamgrandbatumigonio.com\/#website"},"datePublished":"2024-10-16T14:16:56+00:00","dateModified":"2024-10-23T13:33:52+00:00","breadcrumb":{"@id":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-installation-of-stained-glass-structures-4-5-floors-preparation-of-openings-installation-of-durable-and-environmentally-resistant-frames-2-installati\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-installation-of-stained-glass-structures-4-5-floors-preparation-of-openings-installation-of-durable-and-environmentally-resistant-frames-2-installati\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-installation-of-stained-glass-structures-4-5-floors-preparation-of-openings-installation-of-durable-and-environmentally-resistant-frames-2-installati\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430","item":"https:\/\/wyndhamgrandbatumigonio.com\/en\/"},{"@type":"ListItem","position":2,"name":"Wyndham Grand Batumi Gonio. Aqua \u2014 1. Installation of stained glass structures, 4-5 floors Preparation of openings, installation of durable and environmentally resistant frames. 2. Installation of decorative boxes on balconies, 6-9 floors Design and construction of frame structure, secure fastening to ensure durability and safety. 3. Arrangement of mocap, 12th floor Creation of a sample finish, which allows to evaluate the appearance of the future hotel room. 4. Plastering of openings and preparation for hydro\/vapor insulation of stained glass windows, floors 2-8. 5. Diamond drilling of engineering holes, 7th and 20th floors Marking and drilling is carried out, which is necessary for installation of communications of the future hotel. Anticorrosive works on the 1st floor, works on elevator shaft coverings, works on installation of gypsum plasterboard framework of internal partitions on the 3-5 floors and preparation of ceilings for installation of gypsum plasterboard framework on the 5th floor."}]},{"@type":"WebSite","@id":"https:\/\/wyndhamgrandbatumigonio.com\/#website","url":"https:\/\/wyndhamgrandbatumigonio.com\/","name":"Wyndham Grand Batumi Gonio","description":"The benefits of investing in a brand from the world&#039;s leading hotel chain Wyndham Grand","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/wyndhamgrandbatumigonio.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/news\/23742","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/types\/news"}],"wp:attachment":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/media?parent=23742"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}