{"id":27188,"date":"2024-12-12T22:12:16","date_gmt":"2024-12-12T18:12:16","guid":{"rendered":"https:\/\/wyndhamgrandbatumigonio.com\/?post_type=news&#038;p=27188"},"modified":"2024-12-26T01:16:27","modified_gmt":"2024-12-25T21:16:27","slug":"wyndham-grand-batumi-gonio-aqua-1-facade-works-the-12th-13th-floors-this-includes-the-installation-of-facade-elements-on-balconies-the-facade-is-being-winterized-2-install","status":"publish","type":"news","link":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-facade-works-the-12th-13th-floors-this-includes-the-installation-of-facade-elements-on-balconies-the-facade-is-being-winterized-2-install\/","title":{"rendered":"Wyndham Grand Batumi Gonio. Aqua \u2014 1. Facade works, the 12th \u2013 13th  floors. This includes the installation of facade elements on balconies. The facade is being winterized.  2. Installation of drywall frames, the 14th -15th, 18th &#8211; 19th floors.  3. Mockup construction on the 3rd, 13th floors. &#8211; Painting is ongoing on the 3rd floor. &#8211; Tiling on the balconies of the 13th floor.  4. Diamond core drilling for engineering openings on the 4th, 17th &#8211; 18th floors. Marking and drilling of precise openings for the installation of utilities in the future hotel.  5. Installation of utilities systems &#8211; Horizontal water supply piping across units, the 20th floor &#8211; Stormwater drainage, steel bracket installation, the 8th \u2013 5th floors. &#8211; Hot and cold water risers are being installed, the 19th \u2013 20th floors.  6. Waterproofing balconies on the 4th \u2013 5th floors.  7. Pouring for steel railing posts on balconies, the  6th \u2013 7th floors.   8. Fabrication and installation of steel arches On balconies of the 9th floor."},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"template":"","class_list":["post-27188","news","type-news","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Wyndham Grand Batumi Gonio. Aqua \u2014 1. Facade works, the 12th \u2013 13th floors. This includes the installation of facade elements on balconies. The facade is being winterized. 2. Installation of drywall frames, the 14th -15th, 18th - 19th floors. 3. Mockup construction on the 3rd, 13th floors. - Painting is ongoing on the 3rd floor. - Tiling on the balconies of the 13th floor. 4. Diamond core drilling for engineering openings on the 4th, 17th - 18th floors. Marking and drilling of precise openings for the installation of utilities in the future hotel. 5. Installation of utilities systems - Horizontal water supply piping across units, the 20th floor - Stormwater drainage, steel bracket installation, the 8th \u2013 5th floors. - Hot and cold water risers are being installed, the 19th \u2013 20th floors. 6. Waterproofing balconies on the 4th \u2013 5th floors. 7. Pouring for steel railing posts on balconies, the 6th \u2013 7th floors.  8. Fabrication and installation of steel arches On balconies of the 9th floor. &#8211; Wyndham Grand Batumi Gonio<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-facade-works-the-12th-13th-floors-this-includes-the-installation-of-facade-elements-on-balconies-the-facade-is-being-winterized-2-install\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Wyndham Grand Batumi Gonio. Aqua \u2014 1. Facade works, the 12th \u2013 13th floors. This includes the installation of facade elements on balconies. The facade is being winterized. 2. Installation of drywall frames, the 14th -15th, 18th - 19th floors. 3. Mockup construction on the 3rd, 13th floors. - Painting is ongoing on the 3rd floor. - Tiling on the balconies of the 13th floor. 4. Diamond core drilling for engineering openings on the 4th, 17th - 18th floors. Marking and drilling of precise openings for the installation of utilities in the future hotel. 5. Installation of utilities systems - Horizontal water supply piping across units, the 20th floor - Stormwater drainage, steel bracket installation, the 8th \u2013 5th floors. - Hot and cold water risers are being installed, the 19th \u2013 20th floors. 6. Waterproofing balconies on the 4th \u2013 5th floors. 7. Pouring for steel railing posts on balconies, the 6th \u2013 7th floors.  8. Fabrication and installation of steel arches On balconies of the 9th floor. &#8211; Wyndham Grand Batumi Gonio\" \/>\n<meta property=\"og:url\" content=\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-facade-works-the-12th-13th-floors-this-includes-the-installation-of-facade-elements-on-balconies-the-facade-is-being-winterized-2-install\/\" \/>\n<meta property=\"og:site_name\" content=\"Wyndham Grand Batumi Gonio\" \/>\n<meta property=\"article:modified_time\" content=\"2024-12-25T21:16:27+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-facade-works-the-12th-13th-floors-this-includes-the-installation-of-facade-elements-on-balconies-the-facade-is-being-winterized-2-install\/\",\"url\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-facade-works-the-12th-13th-floors-this-includes-the-installation-of-facade-elements-on-balconies-the-facade-is-being-winterized-2-install\/\",\"name\":\"Wyndham Grand Batumi Gonio. Aqua \u2014 1. Facade works, the 12th \u2013 13th floors. This includes the installation of facade elements on balconies. The facade is being winterized. 2. Installation of drywall frames, the 14th -15th, 18th - 19th floors. 3. Mockup construction on the 3rd, 13th floors. - Painting is ongoing on the 3rd floor. - Tiling on the balconies of the 13th floor. 4. Diamond core drilling for engineering openings on the 4th, 17th - 18th floors. Marking and drilling of precise openings for the installation of utilities in the future hotel. 5. Installation of utilities systems - Horizontal water supply piping across units, the 20th floor - Stormwater drainage, steel bracket installation, the 8th \u2013 5th floors. - Hot and cold water risers are being installed, the 19th \u2013 20th floors. 6. Waterproofing balconies on the 4th \u2013 5th floors. 7. Pouring for steel railing posts on balconies, the 6th \u2013 7th floors. 8. Fabrication and installation of steel arches On balconies of the 9th floor. &#8211; Wyndham Grand Batumi Gonio\",\"isPartOf\":{\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/#website\"},\"datePublished\":\"2024-12-12T18:12:16+00:00\",\"dateModified\":\"2024-12-25T21:16:27+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-facade-works-the-12th-13th-floors-this-includes-the-installation-of-facade-elements-on-balconies-the-facade-is-being-winterized-2-install\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-facade-works-the-12th-13th-floors-this-includes-the-installation-of-facade-elements-on-balconies-the-facade-is-being-winterized-2-install\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-facade-works-the-12th-13th-floors-this-includes-the-installation-of-facade-elements-on-balconies-the-facade-is-being-winterized-2-install\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430\",\"item\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Wyndham Grand Batumi Gonio. Aqua \u2014 1. Facade works, the 12th \u2013 13th floors. This includes the installation of facade elements on balconies. The facade is being winterized. 2. Installation of drywall frames, the 14th -15th, 18th &#8212; 19th floors. 3. Mockup construction on the 3rd, 13th floors. &#8212; Painting is ongoing on the 3rd floor. &#8212; Tiling on the balconies of the 13th floor. 4. Diamond core drilling for engineering openings on the 4th, 17th &#8212; 18th floors. Marking and drilling of precise openings for the installation of utilities in the future hotel. 5. Installation of utilities systems &#8212; Horizontal water supply piping across units, the 20th floor &#8212; Stormwater drainage, steel bracket installation, the 8th \u2013 5th floors. &#8212; Hot and cold water risers are being installed, the 19th \u2013 20th floors. 6. Waterproofing balconies on the 4th \u2013 5th floors. 7. Pouring for steel railing posts on balconies, the 6th \u2013 7th floors. 8. Fabrication and installation of steel arches On balconies of the 9th floor.\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/#website\",\"url\":\"https:\/\/wyndhamgrandbatumigonio.com\/\",\"name\":\"Wyndham Grand Batumi Gonio\",\"description\":\"The benefits of investing in a brand from the world&#039;s leading hotel chain Wyndham Grand\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/wyndhamgrandbatumigonio.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Wyndham Grand Batumi Gonio. Aqua \u2014 1. Facade works, the 12th \u2013 13th floors. This includes the installation of facade elements on balconies. The facade is being winterized. 2. Installation of drywall frames, the 14th -15th, 18th - 19th floors. 3. Mockup construction on the 3rd, 13th floors. - Painting is ongoing on the 3rd floor. - Tiling on the balconies of the 13th floor. 4. Diamond core drilling for engineering openings on the 4th, 17th - 18th floors. Marking and drilling of precise openings for the installation of utilities in the future hotel. 5. Installation of utilities systems - Horizontal water supply piping across units, the 20th floor - Stormwater drainage, steel bracket installation, the 8th \u2013 5th floors. - Hot and cold water risers are being installed, the 19th \u2013 20th floors. 6. Waterproofing balconies on the 4th \u2013 5th floors. 7. Pouring for steel railing posts on balconies, the 6th \u2013 7th floors.  8. Fabrication and installation of steel arches On balconies of the 9th floor. &#8211; Wyndham Grand Batumi Gonio","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-facade-works-the-12th-13th-floors-this-includes-the-installation-of-facade-elements-on-balconies-the-facade-is-being-winterized-2-install\/","og_locale":"en_US","og_type":"article","og_title":"Wyndham Grand Batumi Gonio. Aqua \u2014 1. Facade works, the 12th \u2013 13th floors. This includes the installation of facade elements on balconies. The facade is being winterized. 2. Installation of drywall frames, the 14th -15th, 18th - 19th floors. 3. Mockup construction on the 3rd, 13th floors. - Painting is ongoing on the 3rd floor. - Tiling on the balconies of the 13th floor. 4. Diamond core drilling for engineering openings on the 4th, 17th - 18th floors. Marking and drilling of precise openings for the installation of utilities in the future hotel. 5. Installation of utilities systems - Horizontal water supply piping across units, the 20th floor - Stormwater drainage, steel bracket installation, the 8th \u2013 5th floors. - Hot and cold water risers are being installed, the 19th \u2013 20th floors. 6. Waterproofing balconies on the 4th \u2013 5th floors. 7. Pouring for steel railing posts on balconies, the 6th \u2013 7th floors.  8. Fabrication and installation of steel arches On balconies of the 9th floor. &#8211; Wyndham Grand Batumi Gonio","og_url":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-facade-works-the-12th-13th-floors-this-includes-the-installation-of-facade-elements-on-balconies-the-facade-is-being-winterized-2-install\/","og_site_name":"Wyndham Grand Batumi Gonio","article_modified_time":"2024-12-25T21:16:27+00:00","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-facade-works-the-12th-13th-floors-this-includes-the-installation-of-facade-elements-on-balconies-the-facade-is-being-winterized-2-install\/","url":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-facade-works-the-12th-13th-floors-this-includes-the-installation-of-facade-elements-on-balconies-the-facade-is-being-winterized-2-install\/","name":"Wyndham Grand Batumi Gonio. Aqua \u2014 1. Facade works, the 12th \u2013 13th floors. This includes the installation of facade elements on balconies. The facade is being winterized. 2. Installation of drywall frames, the 14th -15th, 18th - 19th floors. 3. Mockup construction on the 3rd, 13th floors. - Painting is ongoing on the 3rd floor. - Tiling on the balconies of the 13th floor. 4. Diamond core drilling for engineering openings on the 4th, 17th - 18th floors. Marking and drilling of precise openings for the installation of utilities in the future hotel. 5. Installation of utilities systems - Horizontal water supply piping across units, the 20th floor - Stormwater drainage, steel bracket installation, the 8th \u2013 5th floors. - Hot and cold water risers are being installed, the 19th \u2013 20th floors. 6. Waterproofing balconies on the 4th \u2013 5th floors. 7. Pouring for steel railing posts on balconies, the 6th \u2013 7th floors. 8. Fabrication and installation of steel arches On balconies of the 9th floor. &#8211; Wyndham Grand Batumi Gonio","isPartOf":{"@id":"https:\/\/wyndhamgrandbatumigonio.com\/#website"},"datePublished":"2024-12-12T18:12:16+00:00","dateModified":"2024-12-25T21:16:27+00:00","breadcrumb":{"@id":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-facade-works-the-12th-13th-floors-this-includes-the-installation-of-facade-elements-on-balconies-the-facade-is-being-winterized-2-install\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-facade-works-the-12th-13th-floors-this-includes-the-installation-of-facade-elements-on-balconies-the-facade-is-being-winterized-2-install\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-facade-works-the-12th-13th-floors-this-includes-the-installation-of-facade-elements-on-balconies-the-facade-is-being-winterized-2-install\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430","item":"https:\/\/wyndhamgrandbatumigonio.com\/en\/"},{"@type":"ListItem","position":2,"name":"Wyndham Grand Batumi Gonio. Aqua \u2014 1. Facade works, the 12th \u2013 13th floors. This includes the installation of facade elements on balconies. The facade is being winterized. 2. Installation of drywall frames, the 14th -15th, 18th &#8212; 19th floors. 3. Mockup construction on the 3rd, 13th floors. &#8212; Painting is ongoing on the 3rd floor. &#8212; Tiling on the balconies of the 13th floor. 4. Diamond core drilling for engineering openings on the 4th, 17th &#8212; 18th floors. Marking and drilling of precise openings for the installation of utilities in the future hotel. 5. Installation of utilities systems &#8212; Horizontal water supply piping across units, the 20th floor &#8212; Stormwater drainage, steel bracket installation, the 8th \u2013 5th floors. &#8212; Hot and cold water risers are being installed, the 19th \u2013 20th floors. 6. Waterproofing balconies on the 4th \u2013 5th floors. 7. Pouring for steel railing posts on balconies, the 6th \u2013 7th floors. 8. Fabrication and installation of steel arches On balconies of the 9th floor."}]},{"@type":"WebSite","@id":"https:\/\/wyndhamgrandbatumigonio.com\/#website","url":"https:\/\/wyndhamgrandbatumigonio.com\/","name":"Wyndham Grand Batumi Gonio","description":"The benefits of investing in a brand from the world&#039;s leading hotel chain Wyndham Grand","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/wyndhamgrandbatumigonio.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/news\/27188","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/types\/news"}],"wp:attachment":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/media?parent=27188"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}