{"id":27541,"date":"2024-12-18T21:54:14","date_gmt":"2024-12-18T17:54:14","guid":{"rendered":"https:\/\/wyndhamgrandbatumigonio.com\/?post_type=news&#038;p=27541"},"modified":"2024-12-30T21:56:22","modified_gmt":"2024-12-30T17:56:22","slug":"wyndham-grand-batumi-gonio-aqua-1-facade-works-the-3rd-13th-19th-floors-this-includes-the-installation-of-facade-elements-on-balconies-2-installation-of-drywall-frames-installati","status":"publish","type":"news","link":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-facade-works-the-3rd-13th-19th-floors-this-includes-the-installation-of-facade-elements-on-balconies-2-installation-of-drywall-frames-installati\/","title":{"rendered":"Wyndham Grand Batumi Gonio. Aqua \u2014 1. Facade works, the 3rd, 13th, 19th floors. This includes the installation of facade elements on balconies.  2. Installation of drywall frames. &#8211; Installation of internal partitions, the 6th \u2013 9th floors. &#8211; Cladding of ledges, the  6th\u20139th floors.   3. Mockup construction on the 3rd, 13th floors. &#8211; Painting is in progress on the 3rd floor. &#8211; Tiling on the  3rd  floor.  4. Diamond core drilling for engineering openings on the 13th , 15th floors. Marking and drilling of precise openings for the installation of utilities in the future hotel.  5. Installation of utilities systems. &#8211; Assembling and installation of water supply manifolds on the 16th -17th floors. &#8211; Hot and cold water supply risers are being installed, the 15th \u2013 16th floors.  6. Waterproofing of the balconies. On the 7th \u2013 8th floors.  7. Marking Fabrication and installation of steel arches Balconies on the 9th -19th floors.  8. Construction of concrete ledges, 8th \u20139th floors Formwork and reinforcement for ledges designed to support stained-glass installations.  9. Floor screeding, the 12th floor. The floor screeding is being installed.  10. Elevator shafts are being installed.  11. Masonry works, the 20th floor. The ceramic block installation."},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"template":"","class_list":["post-27541","news","type-news","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Wyndham Grand Batumi Gonio. Aqua \u2014 1. Facade works, the 3rd, 13th, 19th floors. This includes the installation of facade elements on balconies. 2. Installation of drywall frames. - Installation of internal partitions, the 6th \u2013 9th floors. - Cladding of ledges, the 6th\u20139th floors.  3. Mockup construction on the 3rd, 13th floors. - Painting is in progress on the 3rd floor. - Tiling on the 3rd floor. 4. Diamond core drilling for engineering openings on the 13th , 15th floors. Marking and drilling of precise openings for the installation of utilities in the future hotel. 5. Installation of utilities systems. - Assembling and installation of water supply manifolds on the 16th -17th floors. - Hot and cold water supply risers are being installed, the 15th \u2013 16th floors. 6. Waterproofing of the balconies. On the 7th \u2013 8th floors. 7. Marking Fabrication and installation of steel arches Balconies on the 9th -19th floors. 8. Construction of concrete ledges, 8th \u20139th floors Formwork and reinforcement for ledges designed to support stained-glass installations. 9. Floor screeding, the 12th floor. The floor screeding is being installed. 10. Elevator shafts are being installed. 11. Masonry works, the 20th floor. The ceramic block installation. &#8211; Wyndham Grand Batumi Gonio<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-facade-works-the-3rd-13th-19th-floors-this-includes-the-installation-of-facade-elements-on-balconies-2-installation-of-drywall-frames-installati\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Wyndham Grand Batumi Gonio. Aqua \u2014 1. Facade works, the 3rd, 13th, 19th floors. This includes the installation of facade elements on balconies. 2. Installation of drywall frames. - Installation of internal partitions, the 6th \u2013 9th floors. - Cladding of ledges, the 6th\u20139th floors.  3. Mockup construction on the 3rd, 13th floors. - Painting is in progress on the 3rd floor. - Tiling on the 3rd floor. 4. Diamond core drilling for engineering openings on the 13th , 15th floors. Marking and drilling of precise openings for the installation of utilities in the future hotel. 5. Installation of utilities systems. - Assembling and installation of water supply manifolds on the 16th -17th floors. - Hot and cold water supply risers are being installed, the 15th \u2013 16th floors. 6. Waterproofing of the balconies. On the 7th \u2013 8th floors. 7. Marking Fabrication and installation of steel arches Balconies on the 9th -19th floors. 8. Construction of concrete ledges, 8th \u20139th floors Formwork and reinforcement for ledges designed to support stained-glass installations. 9. Floor screeding, the 12th floor. The floor screeding is being installed. 10. Elevator shafts are being installed. 11. Masonry works, the 20th floor. The ceramic block installation. &#8211; Wyndham Grand Batumi Gonio\" \/>\n<meta property=\"og:url\" content=\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-facade-works-the-3rd-13th-19th-floors-this-includes-the-installation-of-facade-elements-on-balconies-2-installation-of-drywall-frames-installati\/\" \/>\n<meta property=\"og:site_name\" content=\"Wyndham Grand Batumi Gonio\" \/>\n<meta property=\"article:modified_time\" content=\"2024-12-30T17:56:22+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-facade-works-the-3rd-13th-19th-floors-this-includes-the-installation-of-facade-elements-on-balconies-2-installation-of-drywall-frames-installati\/\",\"url\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-facade-works-the-3rd-13th-19th-floors-this-includes-the-installation-of-facade-elements-on-balconies-2-installation-of-drywall-frames-installati\/\",\"name\":\"Wyndham Grand Batumi Gonio. Aqua \u2014 1. Facade works, the 3rd, 13th, 19th floors. This includes the installation of facade elements on balconies. 2. Installation of drywall frames. - Installation of internal partitions, the 6th \u2013 9th floors. - Cladding of ledges, the 6th\u20139th floors. 3. Mockup construction on the 3rd, 13th floors. - Painting is in progress on the 3rd floor. - Tiling on the 3rd floor. 4. Diamond core drilling for engineering openings on the 13th , 15th floors. Marking and drilling of precise openings for the installation of utilities in the future hotel. 5. Installation of utilities systems. - Assembling and installation of water supply manifolds on the 16th -17th floors. - Hot and cold water supply risers are being installed, the 15th \u2013 16th floors. 6. Waterproofing of the balconies. On the 7th \u2013 8th floors. 7. Marking Fabrication and installation of steel arches Balconies on the 9th -19th floors. 8. Construction of concrete ledges, 8th \u20139th floors Formwork and reinforcement for ledges designed to support stained-glass installations. 9. Floor screeding, the 12th floor. The floor screeding is being installed. 10. Elevator shafts are being installed. 11. Masonry works, the 20th floor. The ceramic block installation. &#8211; Wyndham Grand Batumi Gonio\",\"isPartOf\":{\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/#website\"},\"datePublished\":\"2024-12-18T17:54:14+00:00\",\"dateModified\":\"2024-12-30T17:56:22+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-facade-works-the-3rd-13th-19th-floors-this-includes-the-installation-of-facade-elements-on-balconies-2-installation-of-drywall-frames-installati\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-facade-works-the-3rd-13th-19th-floors-this-includes-the-installation-of-facade-elements-on-balconies-2-installation-of-drywall-frames-installati\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-facade-works-the-3rd-13th-19th-floors-this-includes-the-installation-of-facade-elements-on-balconies-2-installation-of-drywall-frames-installati\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430\",\"item\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Wyndham Grand Batumi Gonio. Aqua \u2014 1. Facade works, the 3rd, 13th, 19th floors. This includes the installation of facade elements on balconies. 2. Installation of drywall frames. &#8212; Installation of internal partitions, the 6th \u2013 9th floors. &#8212; Cladding of ledges, the 6th\u20139th floors. 3. Mockup construction on the 3rd, 13th floors. &#8212; Painting is in progress on the 3rd floor. &#8212; Tiling on the 3rd floor. 4. Diamond core drilling for engineering openings on the 13th , 15th floors. Marking and drilling of precise openings for the installation of utilities in the future hotel. 5. Installation of utilities systems. &#8212; Assembling and installation of water supply manifolds on the 16th -17th floors. &#8212; Hot and cold water supply risers are being installed, the 15th \u2013 16th floors. 6. Waterproofing of the balconies. On the 7th \u2013 8th floors. 7. Marking Fabrication and installation of steel arches Balconies on the 9th -19th floors. 8. Construction of concrete ledges, 8th \u20139th floors Formwork and reinforcement for ledges designed to support stained-glass installations. 9. Floor screeding, the 12th floor. The floor screeding is being installed. 10. Elevator shafts are being installed. 11. Masonry works, the 20th floor. The ceramic block installation.\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/#website\",\"url\":\"https:\/\/wyndhamgrandbatumigonio.com\/\",\"name\":\"Wyndham Grand Batumi Gonio\",\"description\":\"The benefits of investing in a brand from the world&#039;s leading hotel chain Wyndham Grand\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/wyndhamgrandbatumigonio.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Wyndham Grand Batumi Gonio. Aqua \u2014 1. Facade works, the 3rd, 13th, 19th floors. This includes the installation of facade elements on balconies. 2. Installation of drywall frames. - Installation of internal partitions, the 6th \u2013 9th floors. - Cladding of ledges, the 6th\u20139th floors.  3. Mockup construction on the 3rd, 13th floors. - Painting is in progress on the 3rd floor. - Tiling on the 3rd floor. 4. Diamond core drilling for engineering openings on the 13th , 15th floors. Marking and drilling of precise openings for the installation of utilities in the future hotel. 5. Installation of utilities systems. - Assembling and installation of water supply manifolds on the 16th -17th floors. - Hot and cold water supply risers are being installed, the 15th \u2013 16th floors. 6. Waterproofing of the balconies. On the 7th \u2013 8th floors. 7. Marking Fabrication and installation of steel arches Balconies on the 9th -19th floors. 8. Construction of concrete ledges, 8th \u20139th floors Formwork and reinforcement for ledges designed to support stained-glass installations. 9. Floor screeding, the 12th floor. The floor screeding is being installed. 10. Elevator shafts are being installed. 11. Masonry works, the 20th floor. The ceramic block installation. &#8211; Wyndham Grand Batumi Gonio","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-facade-works-the-3rd-13th-19th-floors-this-includes-the-installation-of-facade-elements-on-balconies-2-installation-of-drywall-frames-installati\/","og_locale":"en_US","og_type":"article","og_title":"Wyndham Grand Batumi Gonio. Aqua \u2014 1. Facade works, the 3rd, 13th, 19th floors. This includes the installation of facade elements on balconies. 2. Installation of drywall frames. - Installation of internal partitions, the 6th \u2013 9th floors. - Cladding of ledges, the 6th\u20139th floors.  3. Mockup construction on the 3rd, 13th floors. - Painting is in progress on the 3rd floor. - Tiling on the 3rd floor. 4. Diamond core drilling for engineering openings on the 13th , 15th floors. Marking and drilling of precise openings for the installation of utilities in the future hotel. 5. Installation of utilities systems. - Assembling and installation of water supply manifolds on the 16th -17th floors. - Hot and cold water supply risers are being installed, the 15th \u2013 16th floors. 6. Waterproofing of the balconies. On the 7th \u2013 8th floors. 7. Marking Fabrication and installation of steel arches Balconies on the 9th -19th floors. 8. Construction of concrete ledges, 8th \u20139th floors Formwork and reinforcement for ledges designed to support stained-glass installations. 9. Floor screeding, the 12th floor. The floor screeding is being installed. 10. Elevator shafts are being installed. 11. Masonry works, the 20th floor. The ceramic block installation. &#8211; Wyndham Grand Batumi Gonio","og_url":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-facade-works-the-3rd-13th-19th-floors-this-includes-the-installation-of-facade-elements-on-balconies-2-installation-of-drywall-frames-installati\/","og_site_name":"Wyndham Grand Batumi Gonio","article_modified_time":"2024-12-30T17:56:22+00:00","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-facade-works-the-3rd-13th-19th-floors-this-includes-the-installation-of-facade-elements-on-balconies-2-installation-of-drywall-frames-installati\/","url":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-facade-works-the-3rd-13th-19th-floors-this-includes-the-installation-of-facade-elements-on-balconies-2-installation-of-drywall-frames-installati\/","name":"Wyndham Grand Batumi Gonio. Aqua \u2014 1. Facade works, the 3rd, 13th, 19th floors. This includes the installation of facade elements on balconies. 2. Installation of drywall frames. - Installation of internal partitions, the 6th \u2013 9th floors. - Cladding of ledges, the 6th\u20139th floors. 3. Mockup construction on the 3rd, 13th floors. - Painting is in progress on the 3rd floor. - Tiling on the 3rd floor. 4. Diamond core drilling for engineering openings on the 13th , 15th floors. Marking and drilling of precise openings for the installation of utilities in the future hotel. 5. Installation of utilities systems. - Assembling and installation of water supply manifolds on the 16th -17th floors. - Hot and cold water supply risers are being installed, the 15th \u2013 16th floors. 6. Waterproofing of the balconies. On the 7th \u2013 8th floors. 7. Marking Fabrication and installation of steel arches Balconies on the 9th -19th floors. 8. Construction of concrete ledges, 8th \u20139th floors Formwork and reinforcement for ledges designed to support stained-glass installations. 9. Floor screeding, the 12th floor. The floor screeding is being installed. 10. Elevator shafts are being installed. 11. Masonry works, the 20th floor. The ceramic block installation. &#8211; Wyndham Grand Batumi Gonio","isPartOf":{"@id":"https:\/\/wyndhamgrandbatumigonio.com\/#website"},"datePublished":"2024-12-18T17:54:14+00:00","dateModified":"2024-12-30T17:56:22+00:00","breadcrumb":{"@id":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-facade-works-the-3rd-13th-19th-floors-this-includes-the-installation-of-facade-elements-on-balconies-2-installation-of-drywall-frames-installati\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-facade-works-the-3rd-13th-19th-floors-this-includes-the-installation-of-facade-elements-on-balconies-2-installation-of-drywall-frames-installati\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-facade-works-the-3rd-13th-19th-floors-this-includes-the-installation-of-facade-elements-on-balconies-2-installation-of-drywall-frames-installati\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430","item":"https:\/\/wyndhamgrandbatumigonio.com\/en\/"},{"@type":"ListItem","position":2,"name":"Wyndham Grand Batumi Gonio. Aqua \u2014 1. Facade works, the 3rd, 13th, 19th floors. This includes the installation of facade elements on balconies. 2. Installation of drywall frames. &#8212; Installation of internal partitions, the 6th \u2013 9th floors. &#8212; Cladding of ledges, the 6th\u20139th floors. 3. Mockup construction on the 3rd, 13th floors. &#8212; Painting is in progress on the 3rd floor. &#8212; Tiling on the 3rd floor. 4. Diamond core drilling for engineering openings on the 13th , 15th floors. Marking and drilling of precise openings for the installation of utilities in the future hotel. 5. Installation of utilities systems. &#8212; Assembling and installation of water supply manifolds on the 16th -17th floors. &#8212; Hot and cold water supply risers are being installed, the 15th \u2013 16th floors. 6. Waterproofing of the balconies. On the 7th \u2013 8th floors. 7. Marking Fabrication and installation of steel arches Balconies on the 9th -19th floors. 8. Construction of concrete ledges, 8th \u20139th floors Formwork and reinforcement for ledges designed to support stained-glass installations. 9. Floor screeding, the 12th floor. The floor screeding is being installed. 10. Elevator shafts are being installed. 11. Masonry works, the 20th floor. The ceramic block installation."}]},{"@type":"WebSite","@id":"https:\/\/wyndhamgrandbatumigonio.com\/#website","url":"https:\/\/wyndhamgrandbatumigonio.com\/","name":"Wyndham Grand Batumi Gonio","description":"The benefits of investing in a brand from the world&#039;s leading hotel chain Wyndham Grand","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/wyndhamgrandbatumigonio.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/news\/27541","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/types\/news"}],"wp:attachment":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/media?parent=27541"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}