{"id":33229,"date":"2025-03-15T21:00:52","date_gmt":"2025-03-15T17:00:52","guid":{"rendered":"https:\/\/wyndhamgrandbatumigonio.com\/?post_type=news&#038;p=33229"},"modified":"2025-03-25T18:20:41","modified_gmt":"2025-03-25T14:20:41","slug":"wyndham-grand-batumi-gonio-aqua-1-installation-of-utilities-systems-wiring-the-15th-floor-installation-of-water-supply-system-piping-layout-for-hot-and-cold-w-3","status":"publish","type":"news","link":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-installation-of-utilities-systems-wiring-the-15th-floor-installation-of-water-supply-system-piping-layout-for-hot-and-cold-w-3\/","title":{"rendered":"<b>Wyndham Grand Batumi Gonio. Aqua<\/b> <p>1. Installation of&nbsp;utilities systems.<br \/> &mdash;&nbsp;Wiring, the 15th floor.<br \/> &mdash;&nbsp;Installation of&nbsp;water supply system, piping layout for hot and cold water supply, the <nobr>7th-9th<\/nobr> floors.<br \/> &mdash;&nbsp;Ventilation system installation, the 20th floor.<\/p> <p>2. Facade works.<br \/> The facade winterization on&nbsp;the balconies, the 5th, 14th, 16th, 20th floors.<\/p> <p>3. Installation of&nbsp;drywall framing.<br \/> &mdash;&nbsp;Installation of&nbsp;frame guides for drywall partitions, the 6th&nbsp;&mdash; 7th floors.<br \/> &mdash;&nbsp;Sheathing of&nbsp;the drywall frame, the 11th&nbsp;&mdash; 12th floors.<\/p> <p>4. Floor screeding.<br \/> On&nbsp;the balconies and in&nbsp;the units, the 17th floor.<\/p> <p>5. Installation of&nbsp;the suspended ceilings.<br \/> On&nbsp;the 5th&nbsp;&mdash; 6th floors.<\/p> <p>6. Waterproofing, on&nbsp;the 2nd- 7th floors.<br \/> On&nbsp;the balconies.<\/p> <p>7. Roofing.<br \/> Installation of&nbsp;embedded parts and suports.<\/p> <p>8. Diamond drilling of&nbsp;the engineering openings, the 3rd -12th floors.<br \/> Marking and drilling is&nbsp;carried out, which is&nbsp;necessary for the installation of&nbsp;engineering systems of&nbsp;the future hotel.<\/p> <p>9. Workshop.<br \/> Fabrication of&nbsp;the embedded parts.<\/p> <p>10. Infrastructure building.<br \/> &mdash;&nbsp;Ongoing pit excavation, namely: reinforcement of&nbsp;the slab.<\/p>"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/wyndhamgrandbatumigonio.com\/wp-admin\/edit.php?post_type=news\"><\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"template":"","class_list":["post-33229","news","type-news","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Wyndham Grand Batumi Gonio. Aqua 1. Installation of&nbsp;utilities systems. &mdash;&nbsp;Wiring, the 15th floor. &mdash;&nbsp;Installation of&nbsp;water supply system, piping layout for hot and cold water supply, the 7th-9th floors. &mdash;&nbsp;Ventilation system installation, the 20th floor. 2. Facade works. The facade winterization on&nbsp;the balconies, the 5th, 14th, 16th, 20th floors. 3. Installation of&nbsp;drywall framing. &mdash;&nbsp;Installation of&nbsp;frame guides for drywall partitions, the 6th&nbsp;&mdash; 7th floors. &mdash;&nbsp;Sheathing of&nbsp;the drywall frame, the 11th&nbsp;&mdash; 12th floors. 4. Floor screeding. On&nbsp;the balconies and in&nbsp;the units, the 17th floor. 5. Installation of&nbsp;the suspended ceilings. On&nbsp;the 5th&nbsp;&mdash; 6th floors. 6. Waterproofing, on&nbsp;the 2nd- 7th floors. On&nbsp;the balconies. 7. Roofing. Installation of&nbsp;embedded parts and suports. 8. Diamond drilling of&nbsp;the engineering openings, the 3rd -12th floors. Marking and drilling is&nbsp;carried out, which is&nbsp;necessary for the installation of&nbsp;engineering systems of&nbsp;the future hotel. 9. Workshop. Fabrication of&nbsp;the embedded parts. 10. Infrastructure building. &mdash;&nbsp;Ongoing pit excavation, namely: reinforcement of&nbsp;the slab. &#8211; Wyndham Grand Batumi Gonio<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-installation-of-utilities-systems-wiring-the-15th-floor-installation-of-water-supply-system-piping-layout-for-hot-and-cold-w-3\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Wyndham Grand Batumi Gonio. Aqua 1. Installation of&nbsp;utilities systems. &mdash;&nbsp;Wiring, the 15th floor. &mdash;&nbsp;Installation of&nbsp;water supply system, piping layout for hot and cold water supply, the 7th-9th floors. &mdash;&nbsp;Ventilation system installation, the 20th floor. 2. Facade works. The facade winterization on&nbsp;the balconies, the 5th, 14th, 16th, 20th floors. 3. Installation of&nbsp;drywall framing. &mdash;&nbsp;Installation of&nbsp;frame guides for drywall partitions, the 6th&nbsp;&mdash; 7th floors. &mdash;&nbsp;Sheathing of&nbsp;the drywall frame, the 11th&nbsp;&mdash; 12th floors. 4. Floor screeding. On&nbsp;the balconies and in&nbsp;the units, the 17th floor. 5. Installation of&nbsp;the suspended ceilings. On&nbsp;the 5th&nbsp;&mdash; 6th floors. 6. Waterproofing, on&nbsp;the 2nd- 7th floors. On&nbsp;the balconies. 7. Roofing. Installation of&nbsp;embedded parts and suports. 8. Diamond drilling of&nbsp;the engineering openings, the 3rd -12th floors. Marking and drilling is&nbsp;carried out, which is&nbsp;necessary for the installation of&nbsp;engineering systems of&nbsp;the future hotel. 9. Workshop. Fabrication of&nbsp;the embedded parts. 10. Infrastructure building. &mdash;&nbsp;Ongoing pit excavation, namely: reinforcement of&nbsp;the slab. &#8211; Wyndham Grand Batumi Gonio\" \/>\n<meta property=\"og:url\" content=\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-installation-of-utilities-systems-wiring-the-15th-floor-installation-of-water-supply-system-piping-layout-for-hot-and-cold-w-3\/\" \/>\n<meta property=\"og:site_name\" content=\"Wyndham Grand Batumi Gonio\" \/>\n<meta property=\"article:modified_time\" content=\"2025-03-25T14:20:41+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-installation-of-utilities-systems-wiring-the-15th-floor-installation-of-water-supply-system-piping-layout-for-hot-and-cold-w-3\/\",\"url\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-installation-of-utilities-systems-wiring-the-15th-floor-installation-of-water-supply-system-piping-layout-for-hot-and-cold-w-3\/\",\"name\":\"Wyndham Grand Batumi Gonio. Aqua 1. Installation of&nbsp;utilities systems. &mdash;&nbsp;Wiring, the 15th floor. &mdash;&nbsp;Installation of&nbsp;water supply system, piping layout for hot and cold water supply, the 7th-9th floors. &mdash;&nbsp;Ventilation system installation, the 20th floor. 2. Facade works. The facade winterization on&nbsp;the balconies, the 5th, 14th, 16th, 20th floors. 3. Installation of&nbsp;drywall framing. &mdash;&nbsp;Installation of&nbsp;frame guides for drywall partitions, the 6th&nbsp;&mdash; 7th floors. &mdash;&nbsp;Sheathing of&nbsp;the drywall frame, the 11th&nbsp;&mdash; 12th floors. 4. Floor screeding. On&nbsp;the balconies and in&nbsp;the units, the 17th floor. 5. Installation of&nbsp;the suspended ceilings. On&nbsp;the 5th&nbsp;&mdash; 6th floors. 6. Waterproofing, on&nbsp;the 2nd- 7th floors. On&nbsp;the balconies. 7. Roofing. Installation of&nbsp;embedded parts and suports. 8. Diamond drilling of&nbsp;the engineering openings, the 3rd -12th floors. Marking and drilling is&nbsp;carried out, which is&nbsp;necessary for the installation of&nbsp;engineering systems of&nbsp;the future hotel. 9. Workshop. Fabrication of&nbsp;the embedded parts. 10. Infrastructure building. &mdash;&nbsp;Ongoing pit excavation, namely: reinforcement of&nbsp;the slab. &#8211; Wyndham Grand Batumi Gonio\",\"isPartOf\":{\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/#website\"},\"datePublished\":\"2025-03-15T17:00:52+00:00\",\"dateModified\":\"2025-03-25T14:20:41+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-installation-of-utilities-systems-wiring-the-15th-floor-installation-of-water-supply-system-piping-layout-for-hot-and-cold-w-3\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-installation-of-utilities-systems-wiring-the-15th-floor-installation-of-water-supply-system-piping-layout-for-hot-and-cold-w-3\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-installation-of-utilities-systems-wiring-the-15th-floor-installation-of-water-supply-system-piping-layout-for-hot-and-cold-w-3\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430\",\"item\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Wyndham Grand Batumi Gonio. Aqua 1. Installation of&nbsp;utilities systems. &mdash;&nbsp;Wiring, the 15th floor. &mdash;&nbsp;Installation of&nbsp;water supply system, piping layout for hot and cold water supply, the 7th-9th floors. &mdash;&nbsp;Ventilation system installation, the 20th floor. 2. Facade works. The facade winterization on&nbsp;the balconies, the 5th, 14th, 16th, 20th floors. 3. Installation of&nbsp;drywall framing. &mdash;&nbsp;Installation of&nbsp;frame guides for drywall partitions, the 6th&nbsp;&mdash; 7th floors. &mdash;&nbsp;Sheathing of&nbsp;the drywall frame, the 11th&nbsp;&mdash; 12th floors. 4. Floor screeding. On&nbsp;the balconies and in&nbsp;the units, the 17th floor. 5. Installation of&nbsp;the suspended ceilings. On&nbsp;the 5th&nbsp;&mdash; 6th floors. 6. Waterproofing, on&nbsp;the 2nd- 7th floors. On&nbsp;the balconies. 7. Roofing. Installation of&nbsp;embedded parts and suports. 8. Diamond drilling of&nbsp;the engineering openings, the 3rd -12th floors. Marking and drilling is&nbsp;carried out, which is&nbsp;necessary for the installation of&nbsp;engineering systems of&nbsp;the future hotel. 9. Workshop. Fabrication of&nbsp;the embedded parts. 10. Infrastructure building. &mdash;&nbsp;Ongoing pit excavation, namely: reinforcement of&nbsp;the slab.\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/#website\",\"url\":\"https:\/\/wyndhamgrandbatumigonio.com\/\",\"name\":\"Wyndham Grand Batumi Gonio\",\"description\":\"The benefits of investing in a brand from the world&#039;s leading hotel chain Wyndham Grand\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/wyndhamgrandbatumigonio.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Wyndham Grand Batumi Gonio. Aqua 1. Installation of&nbsp;utilities systems. &mdash;&nbsp;Wiring, the 15th floor. &mdash;&nbsp;Installation of&nbsp;water supply system, piping layout for hot and cold water supply, the 7th-9th floors. &mdash;&nbsp;Ventilation system installation, the 20th floor. 2. Facade works. The facade winterization on&nbsp;the balconies, the 5th, 14th, 16th, 20th floors. 3. Installation of&nbsp;drywall framing. &mdash;&nbsp;Installation of&nbsp;frame guides for drywall partitions, the 6th&nbsp;&mdash; 7th floors. &mdash;&nbsp;Sheathing of&nbsp;the drywall frame, the 11th&nbsp;&mdash; 12th floors. 4. Floor screeding. On&nbsp;the balconies and in&nbsp;the units, the 17th floor. 5. Installation of&nbsp;the suspended ceilings. On&nbsp;the 5th&nbsp;&mdash; 6th floors. 6. Waterproofing, on&nbsp;the 2nd- 7th floors. On&nbsp;the balconies. 7. Roofing. Installation of&nbsp;embedded parts and suports. 8. Diamond drilling of&nbsp;the engineering openings, the 3rd -12th floors. Marking and drilling is&nbsp;carried out, which is&nbsp;necessary for the installation of&nbsp;engineering systems of&nbsp;the future hotel. 9. Workshop. Fabrication of&nbsp;the embedded parts. 10. Infrastructure building. &mdash;&nbsp;Ongoing pit excavation, namely: reinforcement of&nbsp;the slab. &#8211; Wyndham Grand Batumi Gonio","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-installation-of-utilities-systems-wiring-the-15th-floor-installation-of-water-supply-system-piping-layout-for-hot-and-cold-w-3\/","og_locale":"en_US","og_type":"article","og_title":"Wyndham Grand Batumi Gonio. Aqua 1. Installation of&nbsp;utilities systems. &mdash;&nbsp;Wiring, the 15th floor. &mdash;&nbsp;Installation of&nbsp;water supply system, piping layout for hot and cold water supply, the 7th-9th floors. &mdash;&nbsp;Ventilation system installation, the 20th floor. 2. Facade works. The facade winterization on&nbsp;the balconies, the 5th, 14th, 16th, 20th floors. 3. Installation of&nbsp;drywall framing. &mdash;&nbsp;Installation of&nbsp;frame guides for drywall partitions, the 6th&nbsp;&mdash; 7th floors. &mdash;&nbsp;Sheathing of&nbsp;the drywall frame, the 11th&nbsp;&mdash; 12th floors. 4. Floor screeding. On&nbsp;the balconies and in&nbsp;the units, the 17th floor. 5. Installation of&nbsp;the suspended ceilings. On&nbsp;the 5th&nbsp;&mdash; 6th floors. 6. Waterproofing, on&nbsp;the 2nd- 7th floors. On&nbsp;the balconies. 7. Roofing. Installation of&nbsp;embedded parts and suports. 8. Diamond drilling of&nbsp;the engineering openings, the 3rd -12th floors. Marking and drilling is&nbsp;carried out, which is&nbsp;necessary for the installation of&nbsp;engineering systems of&nbsp;the future hotel. 9. Workshop. Fabrication of&nbsp;the embedded parts. 10. Infrastructure building. &mdash;&nbsp;Ongoing pit excavation, namely: reinforcement of&nbsp;the slab. &#8211; Wyndham Grand Batumi Gonio","og_url":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-installation-of-utilities-systems-wiring-the-15th-floor-installation-of-water-supply-system-piping-layout-for-hot-and-cold-w-3\/","og_site_name":"Wyndham Grand Batumi Gonio","article_modified_time":"2025-03-25T14:20:41+00:00","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-installation-of-utilities-systems-wiring-the-15th-floor-installation-of-water-supply-system-piping-layout-for-hot-and-cold-w-3\/","url":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-installation-of-utilities-systems-wiring-the-15th-floor-installation-of-water-supply-system-piping-layout-for-hot-and-cold-w-3\/","name":"Wyndham Grand Batumi Gonio. Aqua 1. Installation of&nbsp;utilities systems. &mdash;&nbsp;Wiring, the 15th floor. &mdash;&nbsp;Installation of&nbsp;water supply system, piping layout for hot and cold water supply, the 7th-9th floors. &mdash;&nbsp;Ventilation system installation, the 20th floor. 2. Facade works. The facade winterization on&nbsp;the balconies, the 5th, 14th, 16th, 20th floors. 3. Installation of&nbsp;drywall framing. &mdash;&nbsp;Installation of&nbsp;frame guides for drywall partitions, the 6th&nbsp;&mdash; 7th floors. &mdash;&nbsp;Sheathing of&nbsp;the drywall frame, the 11th&nbsp;&mdash; 12th floors. 4. Floor screeding. On&nbsp;the balconies and in&nbsp;the units, the 17th floor. 5. Installation of&nbsp;the suspended ceilings. On&nbsp;the 5th&nbsp;&mdash; 6th floors. 6. Waterproofing, on&nbsp;the 2nd- 7th floors. On&nbsp;the balconies. 7. Roofing. Installation of&nbsp;embedded parts and suports. 8. Diamond drilling of&nbsp;the engineering openings, the 3rd -12th floors. Marking and drilling is&nbsp;carried out, which is&nbsp;necessary for the installation of&nbsp;engineering systems of&nbsp;the future hotel. 9. Workshop. Fabrication of&nbsp;the embedded parts. 10. Infrastructure building. &mdash;&nbsp;Ongoing pit excavation, namely: reinforcement of&nbsp;the slab. &#8211; Wyndham Grand Batumi Gonio","isPartOf":{"@id":"https:\/\/wyndhamgrandbatumigonio.com\/#website"},"datePublished":"2025-03-15T17:00:52+00:00","dateModified":"2025-03-25T14:20:41+00:00","breadcrumb":{"@id":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-installation-of-utilities-systems-wiring-the-15th-floor-installation-of-water-supply-system-piping-layout-for-hot-and-cold-w-3\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-installation-of-utilities-systems-wiring-the-15th-floor-installation-of-water-supply-system-piping-layout-for-hot-and-cold-w-3\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/wyndham-grand-batumi-gonio-aqua-1-installation-of-utilities-systems-wiring-the-15th-floor-installation-of-water-supply-system-piping-layout-for-hot-and-cold-w-3\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430","item":"https:\/\/wyndhamgrandbatumigonio.com\/en\/"},{"@type":"ListItem","position":2,"name":"Wyndham Grand Batumi Gonio. Aqua 1. Installation of&nbsp;utilities systems. &mdash;&nbsp;Wiring, the 15th floor. &mdash;&nbsp;Installation of&nbsp;water supply system, piping layout for hot and cold water supply, the 7th-9th floors. &mdash;&nbsp;Ventilation system installation, the 20th floor. 2. Facade works. The facade winterization on&nbsp;the balconies, the 5th, 14th, 16th, 20th floors. 3. Installation of&nbsp;drywall framing. &mdash;&nbsp;Installation of&nbsp;frame guides for drywall partitions, the 6th&nbsp;&mdash; 7th floors. &mdash;&nbsp;Sheathing of&nbsp;the drywall frame, the 11th&nbsp;&mdash; 12th floors. 4. Floor screeding. On&nbsp;the balconies and in&nbsp;the units, the 17th floor. 5. Installation of&nbsp;the suspended ceilings. On&nbsp;the 5th&nbsp;&mdash; 6th floors. 6. Waterproofing, on&nbsp;the 2nd- 7th floors. On&nbsp;the balconies. 7. Roofing. Installation of&nbsp;embedded parts and suports. 8. Diamond drilling of&nbsp;the engineering openings, the 3rd -12th floors. Marking and drilling is&nbsp;carried out, which is&nbsp;necessary for the installation of&nbsp;engineering systems of&nbsp;the future hotel. 9. Workshop. Fabrication of&nbsp;the embedded parts. 10. Infrastructure building. &mdash;&nbsp;Ongoing pit excavation, namely: reinforcement of&nbsp;the slab."}]},{"@type":"WebSite","@id":"https:\/\/wyndhamgrandbatumigonio.com\/#website","url":"https:\/\/wyndhamgrandbatumigonio.com\/","name":"Wyndham Grand Batumi Gonio","description":"The benefits of investing in a brand from the world&#039;s leading hotel chain Wyndham Grand","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/wyndhamgrandbatumigonio.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/news\/33229","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/types\/news"}],"wp:attachment":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/media?parent=33229"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}