{"id":43123,"date":"2025-10-22T17:45:22","date_gmt":"2025-10-22T13:45:22","guid":{"rendered":"https:\/\/wyndhamgrandbatumigonio.com\/?post_type=news&#038;p=43123"},"modified":"2025-10-22T17:45:22","modified_gmt":"2025-10-22T13:45:22","slug":"monthly-construction-report-wyndham-grand-batumi-gonio-riviera-september-2025-in-september-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction","status":"publish","type":"news","link":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-riviera-september-2025-in-september-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction\/","title":{"rendered":"<b>Monthly Construction Report<br \/> Wyndham Grand Batumi Gonio. Riviera<br \/> September 2025<\/b> <p>In&nbsp;September 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project.<\/p> <p>Block A<br \/> &mdash;&nbsp;Work has been completed on&nbsp;installing chimney flues above terrace level. The facade has been primed for the application of&nbsp;decorative plaster to&nbsp;the ends of&nbsp;the block.<br \/> &mdash;&nbsp;Work is&nbsp;underway on&nbsp;installing the plasterboard frame for internal partitions and covering them with plasterboard sheets.<br \/> &mdash;&nbsp;Work on&nbsp;the installation of&nbsp;hot and cold water supply, sewerage, and ventilation systems has been completed.<br \/> &mdash;&nbsp;Work is&nbsp;underway on&nbsp;electrical lighting, power supply, and the installation of&nbsp;a&nbsp;structured cabling system.<br \/> Blocks B&nbsp;and C<br \/> &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;welded waterproofing for the rear courtyards.<br \/> &mdash;&nbsp;Metal structures for chimney boxes are being manufactured for subsequent installation.<br \/> &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;hot and cold water supply, sewerage, and ventilation systems.<br \/> &mdash;&nbsp;Work is&nbsp;underway on&nbsp;electrical lighting, power supply, and installation of&nbsp;a&nbsp;structured cabling system.<br \/> Block E<br \/> &mdash;&nbsp;Work on&nbsp;the manufacture of&nbsp;engineering shaft covers has been completed.<br \/> &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;metal boxes for storm drainage and the covering of&nbsp;storm drainage boxes.<\/p> <p>Infrastructure building<br \/> &mdash;&nbsp;Work on&nbsp;the installation of&nbsp;membrane waterproofing on&nbsp;the roof has been completed.<br \/> &mdash;&nbsp;Stained glass frames and <nobr>double-glazed<\/nobr> windows have been delivered.<br \/> &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;mineral wool facade insulation.<\/p>"},"content":{"rendered":"\n<p><\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><a href=\"https:\/\/wyndhamgrandbatumigonio.com\/wp-admin\/edit.php?post_type=news\"><\/a><\/p>\n\n\n\n<p><\/p>\n","protected":false},"template":"","class_list":["post-43123","news","type-news","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Monthly Construction Report Wyndham Grand Batumi Gonio. Riviera September 2025 In&nbsp;September 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Block A &mdash;&nbsp;Work has been completed on&nbsp;installing chimney flues above terrace level. The facade has been primed for the application of&nbsp;decorative plaster to&nbsp;the ends of&nbsp;the block. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;installing the plasterboard frame for internal partitions and covering them with plasterboard sheets. &mdash;&nbsp;Work on&nbsp;the installation of&nbsp;hot and cold water supply, sewerage, and ventilation systems has been completed. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;electrical lighting, power supply, and the installation of&nbsp;a&nbsp;structured cabling system. Blocks B&nbsp;and C &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;welded waterproofing for the rear courtyards. &mdash;&nbsp;Metal structures for chimney boxes are being manufactured for subsequent installation. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;hot and cold water supply, sewerage, and ventilation systems. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;electrical lighting, power supply, and installation of&nbsp;a&nbsp;structured cabling system. Block E &mdash;&nbsp;Work on&nbsp;the manufacture of&nbsp;engineering shaft covers has been completed. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;metal boxes for storm drainage and the covering of&nbsp;storm drainage boxes. Infrastructure building &mdash;&nbsp;Work on&nbsp;the installation of&nbsp;membrane waterproofing on&nbsp;the roof has been completed. &mdash;&nbsp;Stained glass frames and double-glazed windows have been delivered. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;mineral wool facade insulation. &#8211; Wyndham Grand Batumi Gonio<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-riviera-september-2025-in-september-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Monthly Construction Report Wyndham Grand Batumi Gonio. Riviera September 2025 In&nbsp;September 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Block A &mdash;&nbsp;Work has been completed on&nbsp;installing chimney flues above terrace level. The facade has been primed for the application of&nbsp;decorative plaster to&nbsp;the ends of&nbsp;the block. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;installing the plasterboard frame for internal partitions and covering them with plasterboard sheets. &mdash;&nbsp;Work on&nbsp;the installation of&nbsp;hot and cold water supply, sewerage, and ventilation systems has been completed. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;electrical lighting, power supply, and the installation of&nbsp;a&nbsp;structured cabling system. Blocks B&nbsp;and C &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;welded waterproofing for the rear courtyards. &mdash;&nbsp;Metal structures for chimney boxes are being manufactured for subsequent installation. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;hot and cold water supply, sewerage, and ventilation systems. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;electrical lighting, power supply, and installation of&nbsp;a&nbsp;structured cabling system. Block E &mdash;&nbsp;Work on&nbsp;the manufacture of&nbsp;engineering shaft covers has been completed. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;metal boxes for storm drainage and the covering of&nbsp;storm drainage boxes. Infrastructure building &mdash;&nbsp;Work on&nbsp;the installation of&nbsp;membrane waterproofing on&nbsp;the roof has been completed. &mdash;&nbsp;Stained glass frames and double-glazed windows have been delivered. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;mineral wool facade insulation. &#8211; Wyndham Grand Batumi Gonio\" \/>\n<meta property=\"og:url\" content=\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-riviera-september-2025-in-september-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction\/\" \/>\n<meta property=\"og:site_name\" content=\"Wyndham Grand Batumi Gonio\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-riviera-september-2025-in-september-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction\/\",\"url\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-riviera-september-2025-in-september-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction\/\",\"name\":\"Monthly Construction Report Wyndham Grand Batumi Gonio. Riviera September 2025 In&nbsp;September 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Block A &mdash;&nbsp;Work has been completed on&nbsp;installing chimney flues above terrace level. The facade has been primed for the application of&nbsp;decorative plaster to&nbsp;the ends of&nbsp;the block. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;installing the plasterboard frame for internal partitions and covering them with plasterboard sheets. &mdash;&nbsp;Work on&nbsp;the installation of&nbsp;hot and cold water supply, sewerage, and ventilation systems has been completed. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;electrical lighting, power supply, and the installation of&nbsp;a&nbsp;structured cabling system. Blocks B&nbsp;and C &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;welded waterproofing for the rear courtyards. &mdash;&nbsp;Metal structures for chimney boxes are being manufactured for subsequent installation. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;hot and cold water supply, sewerage, and ventilation systems. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;electrical lighting, power supply, and installation of&nbsp;a&nbsp;structured cabling system. Block E &mdash;&nbsp;Work on&nbsp;the manufacture of&nbsp;engineering shaft covers has been completed. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;metal boxes for storm drainage and the covering of&nbsp;storm drainage boxes. Infrastructure building &mdash;&nbsp;Work on&nbsp;the installation of&nbsp;membrane waterproofing on&nbsp;the roof has been completed. &mdash;&nbsp;Stained glass frames and double-glazed windows have been delivered. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;mineral wool facade insulation. &#8211; Wyndham Grand Batumi Gonio\",\"isPartOf\":{\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/#website\"},\"datePublished\":\"2025-10-22T13:45:22+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-riviera-september-2025-in-september-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-riviera-september-2025-in-september-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-riviera-september-2025-in-september-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430\",\"item\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Monthly Construction Report Wyndham Grand Batumi Gonio. Riviera September 2025 In&nbsp;September 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Block A &mdash;&nbsp;Work has been completed on&nbsp;installing chimney flues above terrace level. The facade has been primed for the application of&nbsp;decorative plaster to&nbsp;the ends of&nbsp;the block. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;installing the plasterboard frame for internal partitions and covering them with plasterboard sheets. &mdash;&nbsp;Work on&nbsp;the installation of&nbsp;hot and cold water supply, sewerage, and ventilation systems has been completed. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;electrical lighting, power supply, and the installation of&nbsp;a&nbsp;structured cabling system. Blocks B&nbsp;and C &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;welded waterproofing for the rear courtyards. &mdash;&nbsp;Metal structures for chimney boxes are being manufactured for subsequent installation. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;hot and cold water supply, sewerage, and ventilation systems. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;electrical lighting, power supply, and installation of&nbsp;a&nbsp;structured cabling system. Block E &mdash;&nbsp;Work on&nbsp;the manufacture of&nbsp;engineering shaft covers has been completed. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;metal boxes for storm drainage and the covering of&nbsp;storm drainage boxes. Infrastructure building &mdash;&nbsp;Work on&nbsp;the installation of&nbsp;membrane waterproofing on&nbsp;the roof has been completed. &mdash;&nbsp;Stained glass frames and double-glazed windows have been delivered. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;mineral wool facade insulation.\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/#website\",\"url\":\"https:\/\/wyndhamgrandbatumigonio.com\/\",\"name\":\"Wyndham Grand Batumi Gonio\",\"description\":\"The benefits of investing in a brand from the world&#039;s leading hotel chain Wyndham Grand\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/wyndhamgrandbatumigonio.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Monthly Construction Report Wyndham Grand Batumi Gonio. Riviera September 2025 In&nbsp;September 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Block A &mdash;&nbsp;Work has been completed on&nbsp;installing chimney flues above terrace level. The facade has been primed for the application of&nbsp;decorative plaster to&nbsp;the ends of&nbsp;the block. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;installing the plasterboard frame for internal partitions and covering them with plasterboard sheets. &mdash;&nbsp;Work on&nbsp;the installation of&nbsp;hot and cold water supply, sewerage, and ventilation systems has been completed. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;electrical lighting, power supply, and the installation of&nbsp;a&nbsp;structured cabling system. Blocks B&nbsp;and C &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;welded waterproofing for the rear courtyards. &mdash;&nbsp;Metal structures for chimney boxes are being manufactured for subsequent installation. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;hot and cold water supply, sewerage, and ventilation systems. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;electrical lighting, power supply, and installation of&nbsp;a&nbsp;structured cabling system. Block E &mdash;&nbsp;Work on&nbsp;the manufacture of&nbsp;engineering shaft covers has been completed. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;metal boxes for storm drainage and the covering of&nbsp;storm drainage boxes. Infrastructure building &mdash;&nbsp;Work on&nbsp;the installation of&nbsp;membrane waterproofing on&nbsp;the roof has been completed. &mdash;&nbsp;Stained glass frames and double-glazed windows have been delivered. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;mineral wool facade insulation. &#8211; Wyndham Grand Batumi Gonio","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-riviera-september-2025-in-september-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction\/","og_locale":"en_US","og_type":"article","og_title":"Monthly Construction Report Wyndham Grand Batumi Gonio. Riviera September 2025 In&nbsp;September 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Block A &mdash;&nbsp;Work has been completed on&nbsp;installing chimney flues above terrace level. The facade has been primed for the application of&nbsp;decorative plaster to&nbsp;the ends of&nbsp;the block. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;installing the plasterboard frame for internal partitions and covering them with plasterboard sheets. &mdash;&nbsp;Work on&nbsp;the installation of&nbsp;hot and cold water supply, sewerage, and ventilation systems has been completed. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;electrical lighting, power supply, and the installation of&nbsp;a&nbsp;structured cabling system. Blocks B&nbsp;and C &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;welded waterproofing for the rear courtyards. &mdash;&nbsp;Metal structures for chimney boxes are being manufactured for subsequent installation. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;hot and cold water supply, sewerage, and ventilation systems. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;electrical lighting, power supply, and installation of&nbsp;a&nbsp;structured cabling system. Block E &mdash;&nbsp;Work on&nbsp;the manufacture of&nbsp;engineering shaft covers has been completed. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;metal boxes for storm drainage and the covering of&nbsp;storm drainage boxes. Infrastructure building &mdash;&nbsp;Work on&nbsp;the installation of&nbsp;membrane waterproofing on&nbsp;the roof has been completed. &mdash;&nbsp;Stained glass frames and double-glazed windows have been delivered. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;mineral wool facade insulation. &#8211; Wyndham Grand Batumi Gonio","og_url":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-riviera-september-2025-in-september-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction\/","og_site_name":"Wyndham Grand Batumi Gonio","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-riviera-september-2025-in-september-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction\/","url":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-riviera-september-2025-in-september-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction\/","name":"Monthly Construction Report Wyndham Grand Batumi Gonio. Riviera September 2025 In&nbsp;September 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Block A &mdash;&nbsp;Work has been completed on&nbsp;installing chimney flues above terrace level. The facade has been primed for the application of&nbsp;decorative plaster to&nbsp;the ends of&nbsp;the block. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;installing the plasterboard frame for internal partitions and covering them with plasterboard sheets. &mdash;&nbsp;Work on&nbsp;the installation of&nbsp;hot and cold water supply, sewerage, and ventilation systems has been completed. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;electrical lighting, power supply, and the installation of&nbsp;a&nbsp;structured cabling system. Blocks B&nbsp;and C &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;welded waterproofing for the rear courtyards. &mdash;&nbsp;Metal structures for chimney boxes are being manufactured for subsequent installation. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;hot and cold water supply, sewerage, and ventilation systems. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;electrical lighting, power supply, and installation of&nbsp;a&nbsp;structured cabling system. Block E &mdash;&nbsp;Work on&nbsp;the manufacture of&nbsp;engineering shaft covers has been completed. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;metal boxes for storm drainage and the covering of&nbsp;storm drainage boxes. Infrastructure building &mdash;&nbsp;Work on&nbsp;the installation of&nbsp;membrane waterproofing on&nbsp;the roof has been completed. &mdash;&nbsp;Stained glass frames and double-glazed windows have been delivered. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;mineral wool facade insulation. &#8211; Wyndham Grand Batumi Gonio","isPartOf":{"@id":"https:\/\/wyndhamgrandbatumigonio.com\/#website"},"datePublished":"2025-10-22T13:45:22+00:00","breadcrumb":{"@id":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-riviera-september-2025-in-september-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-riviera-september-2025-in-september-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-riviera-september-2025-in-september-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430","item":"https:\/\/wyndhamgrandbatumigonio.com\/en\/"},{"@type":"ListItem","position":2,"name":"Monthly Construction Report Wyndham Grand Batumi Gonio. Riviera September 2025 In&nbsp;September 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Block A &mdash;&nbsp;Work has been completed on&nbsp;installing chimney flues above terrace level. The facade has been primed for the application of&nbsp;decorative plaster to&nbsp;the ends of&nbsp;the block. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;installing the plasterboard frame for internal partitions and covering them with plasterboard sheets. &mdash;&nbsp;Work on&nbsp;the installation of&nbsp;hot and cold water supply, sewerage, and ventilation systems has been completed. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;electrical lighting, power supply, and the installation of&nbsp;a&nbsp;structured cabling system. Blocks B&nbsp;and C &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;welded waterproofing for the rear courtyards. &mdash;&nbsp;Metal structures for chimney boxes are being manufactured for subsequent installation. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;hot and cold water supply, sewerage, and ventilation systems. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;electrical lighting, power supply, and installation of&nbsp;a&nbsp;structured cabling system. Block E &mdash;&nbsp;Work on&nbsp;the manufacture of&nbsp;engineering shaft covers has been completed. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;metal boxes for storm drainage and the covering of&nbsp;storm drainage boxes. Infrastructure building &mdash;&nbsp;Work on&nbsp;the installation of&nbsp;membrane waterproofing on&nbsp;the roof has been completed. &mdash;&nbsp;Stained glass frames and double-glazed windows have been delivered. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;mineral wool facade insulation."}]},{"@type":"WebSite","@id":"https:\/\/wyndhamgrandbatumigonio.com\/#website","url":"https:\/\/wyndhamgrandbatumigonio.com\/","name":"Wyndham Grand Batumi Gonio","description":"The benefits of investing in a brand from the world&#039;s leading hotel chain Wyndham Grand","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/wyndhamgrandbatumigonio.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/news\/43123","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/types\/news"}],"wp:attachment":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/media?parent=43123"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}