{"id":44125,"date":"2025-11-17T18:57:48","date_gmt":"2025-11-17T14:57:48","guid":{"rendered":"https:\/\/wyndhamgrandbatumigonio.com\/?post_type=news&#038;p=44125"},"modified":"2025-11-17T18:57:49","modified_gmt":"2025-11-17T14:57:49","slug":"monthly-construction-report-wyndham-grand-batumi-gonio-aqua-october-2025-october-saw-dynamic-progress-on-all-fronts-of-the-project-from-the-erection-of-monolithic-structures-to-t","status":"publish","type":"news","link":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-aqua-october-2025-october-saw-dynamic-progress-on-all-fronts-of-the-project-from-the-erection-of-monolithic-structures-to-t\/","title":{"rendered":"<b>Monthly construction report<br \/> Wyndham Grand Batumi Gonio. Aqua<br \/> October 2025<b> <p>October saw dynamic progress on&nbsp;all fronts of&nbsp;the project: from the erection of&nbsp;monolithic structures to&nbsp;the detailed design of&nbsp;facades and engineering systems. Dozens of&nbsp;processes are being carried out simultaneously on&nbsp;the sites, which allows us&nbsp;to&nbsp;maintain a&nbsp;high pace.<br \/> &#8203;&#8203;- Installation of&nbsp;engineering systems<br \/> Work is&nbsp;underway on&nbsp;the installation of&nbsp;a&nbsp;structured cable system.<br \/> Installation of&nbsp;water fire extinguishing system pipelines is&nbsp;underway.<br \/> Work is&nbsp;underway on&nbsp;electrical lighting and power supply in&nbsp;the units.<br \/> &#8203;&#8203;- Masonry work<br \/> Ceramic block masonry is&nbsp;being laid on&nbsp;the 1st floor, and side panels are being installed for stained glass windows on&nbsp;the 1st floor.<br \/> &#8203;&#8203;- Work on&nbsp;balconies<br \/> Work is&nbsp;underway on&nbsp;the installation of&nbsp;upper waterproofing coating (4 floors), laying porcelain tiles on&nbsp;balconies (4 floors), cladding the ceiling with concrete panels (5 floors), and applying decorative plaster to&nbsp;the walls (6 floors).<br \/> &#8203;&#8203;- Facade work<br \/> Work continues on&nbsp;plastering the facade using beacons and insulating the facade, installing mineral wool.<\/p> <p>Facade lighting materials have been ordered and delivered for further installation.<\/p> <p>&mdash;&nbsp;Installation of&nbsp;a&nbsp;panoramic elevator<br \/> Work has been completed on&nbsp;extending the balconies of&nbsp;the panoramic elevator.<br \/> &#8203;&#8203;- Finishing work in&nbsp;common areas.<br \/> Plastering work is&nbsp;underway in&nbsp;the stairwell area.<br \/> &#8203;&#8203;- Work on&nbsp;the infrastructure building<br \/> Walls, columns, and floor slabs have been installed on&nbsp;all floors of&nbsp;the building.<br \/> Ceramic blocks have been laid on&nbsp;the exterior walls of&nbsp;the entire building.<\/p>"},"content":{"rendered":"\n<p><\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><a href=\"https:\/\/wyndhamgrandbatumigonio.com\/wp-admin\/edit.php?post_type=news\"><\/a><\/p>\n\n\n\n<p><\/p>\n","protected":false},"template":"","class_list":["post-44125","news","type-news","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Monthly construction report Wyndham Grand Batumi Gonio. Aqua October 2025 October saw dynamic progress on&nbsp;all fronts of&nbsp;the project: from the erection of&nbsp;monolithic structures to&nbsp;the detailed design of&nbsp;facades and engineering systems. Dozens of&nbsp;processes are being carried out simultaneously on&nbsp;the sites, which allows us&nbsp;to&nbsp;maintain a&nbsp;high pace. &#8203;&#8203;- Installation of&nbsp;engineering systems Work is&nbsp;underway on&nbsp;the installation of&nbsp;a&nbsp;structured cable system. Installation of&nbsp;water fire extinguishing system pipelines is&nbsp;underway. Work is&nbsp;underway on&nbsp;electrical lighting and power supply in&nbsp;the units. &#8203;&#8203;- Masonry work Ceramic block masonry is&nbsp;being laid on&nbsp;the 1st floor, and side panels are being installed for stained glass windows on&nbsp;the 1st floor. &#8203;&#8203;- Work on&nbsp;balconies Work is&nbsp;underway on&nbsp;the installation of&nbsp;upper waterproofing coating (4 floors), laying porcelain tiles on&nbsp;balconies (4 floors), cladding the ceiling with concrete panels (5 floors), and applying decorative plaster to&nbsp;the walls (6 floors). &#8203;&#8203;- Facade work Work continues on&nbsp;plastering the facade using beacons and insulating the facade, installing mineral wool. Facade lighting materials have been ordered and delivered for further installation. &mdash;&nbsp;Installation of&nbsp;a&nbsp;panoramic elevator Work has been completed on&nbsp;extending the balconies of&nbsp;the panoramic elevator. &#8203;&#8203;- Finishing work in&nbsp;common areas. Plastering work is&nbsp;underway in&nbsp;the stairwell area. &#8203;&#8203;- Work on&nbsp;the infrastructure building Walls, columns, and floor slabs have been installed on&nbsp;all floors of&nbsp;the building. Ceramic blocks have been laid on&nbsp;the exterior walls of&nbsp;the entire building. &#8211; Wyndham Grand Batumi Gonio<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-aqua-october-2025-october-saw-dynamic-progress-on-all-fronts-of-the-project-from-the-erection-of-monolithic-structures-to-t\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Monthly construction report Wyndham Grand Batumi Gonio. Aqua October 2025 October saw dynamic progress on&nbsp;all fronts of&nbsp;the project: from the erection of&nbsp;monolithic structures to&nbsp;the detailed design of&nbsp;facades and engineering systems. Dozens of&nbsp;processes are being carried out simultaneously on&nbsp;the sites, which allows us&nbsp;to&nbsp;maintain a&nbsp;high pace. &#8203;&#8203;- Installation of&nbsp;engineering systems Work is&nbsp;underway on&nbsp;the installation of&nbsp;a&nbsp;structured cable system. Installation of&nbsp;water fire extinguishing system pipelines is&nbsp;underway. Work is&nbsp;underway on&nbsp;electrical lighting and power supply in&nbsp;the units. &#8203;&#8203;- Masonry work Ceramic block masonry is&nbsp;being laid on&nbsp;the 1st floor, and side panels are being installed for stained glass windows on&nbsp;the 1st floor. &#8203;&#8203;- Work on&nbsp;balconies Work is&nbsp;underway on&nbsp;the installation of&nbsp;upper waterproofing coating (4 floors), laying porcelain tiles on&nbsp;balconies (4 floors), cladding the ceiling with concrete panels (5 floors), and applying decorative plaster to&nbsp;the walls (6 floors). &#8203;&#8203;- Facade work Work continues on&nbsp;plastering the facade using beacons and insulating the facade, installing mineral wool. Facade lighting materials have been ordered and delivered for further installation. &mdash;&nbsp;Installation of&nbsp;a&nbsp;panoramic elevator Work has been completed on&nbsp;extending the balconies of&nbsp;the panoramic elevator. &#8203;&#8203;- Finishing work in&nbsp;common areas. Plastering work is&nbsp;underway in&nbsp;the stairwell area. &#8203;&#8203;- Work on&nbsp;the infrastructure building Walls, columns, and floor slabs have been installed on&nbsp;all floors of&nbsp;the building. Ceramic blocks have been laid on&nbsp;the exterior walls of&nbsp;the entire building. &#8211; Wyndham Grand Batumi Gonio\" \/>\n<meta property=\"og:url\" content=\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-aqua-october-2025-october-saw-dynamic-progress-on-all-fronts-of-the-project-from-the-erection-of-monolithic-structures-to-t\/\" \/>\n<meta property=\"og:site_name\" content=\"Wyndham Grand Batumi Gonio\" \/>\n<meta property=\"article:modified_time\" content=\"2025-11-17T14:57:49+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-aqua-october-2025-october-saw-dynamic-progress-on-all-fronts-of-the-project-from-the-erection-of-monolithic-structures-to-t\/\",\"url\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-aqua-october-2025-october-saw-dynamic-progress-on-all-fronts-of-the-project-from-the-erection-of-monolithic-structures-to-t\/\",\"name\":\"Monthly construction report Wyndham Grand Batumi Gonio. Aqua October 2025 October saw dynamic progress on&nbsp;all fronts of&nbsp;the project: from the erection of&nbsp;monolithic structures to&nbsp;the detailed design of&nbsp;facades and engineering systems. Dozens of&nbsp;processes are being carried out simultaneously on&nbsp;the sites, which allows us&nbsp;to&nbsp;maintain a&nbsp;high pace. &#8203;&#8203;- Installation of&nbsp;engineering systems Work is&nbsp;underway on&nbsp;the installation of&nbsp;a&nbsp;structured cable system. Installation of&nbsp;water fire extinguishing system pipelines is&nbsp;underway. Work is&nbsp;underway on&nbsp;electrical lighting and power supply in&nbsp;the units. &#8203;&#8203;- Masonry work Ceramic block masonry is&nbsp;being laid on&nbsp;the 1st floor, and side panels are being installed for stained glass windows on&nbsp;the 1st floor. &#8203;&#8203;- Work on&nbsp;balconies Work is&nbsp;underway on&nbsp;the installation of&nbsp;upper waterproofing coating (4 floors), laying porcelain tiles on&nbsp;balconies (4 floors), cladding the ceiling with concrete panels (5 floors), and applying decorative plaster to&nbsp;the walls (6 floors). &#8203;&#8203;- Facade work Work continues on&nbsp;plastering the facade using beacons and insulating the facade, installing mineral wool. Facade lighting materials have been ordered and delivered for further installation. &mdash;&nbsp;Installation of&nbsp;a&nbsp;panoramic elevator Work has been completed on&nbsp;extending the balconies of&nbsp;the panoramic elevator. &#8203;&#8203;- Finishing work in&nbsp;common areas. Plastering work is&nbsp;underway in&nbsp;the stairwell area. &#8203;&#8203;- Work on&nbsp;the infrastructure building Walls, columns, and floor slabs have been installed on&nbsp;all floors of&nbsp;the building. Ceramic blocks have been laid on&nbsp;the exterior walls of&nbsp;the entire building. &#8211; Wyndham Grand Batumi Gonio\",\"isPartOf\":{\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/#website\"},\"datePublished\":\"2025-11-17T14:57:48+00:00\",\"dateModified\":\"2025-11-17T14:57:49+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-aqua-october-2025-october-saw-dynamic-progress-on-all-fronts-of-the-project-from-the-erection-of-monolithic-structures-to-t\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-aqua-october-2025-october-saw-dynamic-progress-on-all-fronts-of-the-project-from-the-erection-of-monolithic-structures-to-t\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-aqua-october-2025-october-saw-dynamic-progress-on-all-fronts-of-the-project-from-the-erection-of-monolithic-structures-to-t\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430\",\"item\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Monthly construction report Wyndham Grand Batumi Gonio. Aqua October 2025 October saw dynamic progress on&nbsp;all fronts of&nbsp;the project: from the erection of&nbsp;monolithic structures to&nbsp;the detailed design of&nbsp;facades and engineering systems. Dozens of&nbsp;processes are being carried out simultaneously on&nbsp;the sites, which allows us&nbsp;to&nbsp;maintain a&nbsp;high pace. &#8203;&#8203;- Installation of&nbsp;engineering systems Work is&nbsp;underway on&nbsp;the installation of&nbsp;a&nbsp;structured cable system. Installation of&nbsp;water fire extinguishing system pipelines is&nbsp;underway. Work is&nbsp;underway on&nbsp;electrical lighting and power supply in&nbsp;the units. &#8203;&#8203;- Masonry work Ceramic block masonry is&nbsp;being laid on&nbsp;the 1st floor, and side panels are being installed for stained glass windows on&nbsp;the 1st floor. &#8203;&#8203;- Work on&nbsp;balconies Work is&nbsp;underway on&nbsp;the installation of&nbsp;upper waterproofing coating (4 floors), laying porcelain tiles on&nbsp;balconies (4 floors), cladding the ceiling with concrete panels (5 floors), and applying decorative plaster to&nbsp;the walls (6 floors). &#8203;&#8203;- Facade work Work continues on&nbsp;plastering the facade using beacons and insulating the facade, installing mineral wool. Facade lighting materials have been ordered and delivered for further installation. &mdash;&nbsp;Installation of&nbsp;a&nbsp;panoramic elevator Work has been completed on&nbsp;extending the balconies of&nbsp;the panoramic elevator. &#8203;&#8203;- Finishing work in&nbsp;common areas. Plastering work is&nbsp;underway in&nbsp;the stairwell area. &#8203;&#8203;- Work on&nbsp;the infrastructure building Walls, columns, and floor slabs have been installed on&nbsp;all floors of&nbsp;the building. Ceramic blocks have been laid on&nbsp;the exterior walls of&nbsp;the entire building.\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/#website\",\"url\":\"https:\/\/wyndhamgrandbatumigonio.com\/\",\"name\":\"Wyndham Grand Batumi Gonio\",\"description\":\"The benefits of investing in a brand from the world&#039;s leading hotel chain Wyndham Grand\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/wyndhamgrandbatumigonio.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Monthly construction report Wyndham Grand Batumi Gonio. Aqua October 2025 October saw dynamic progress on&nbsp;all fronts of&nbsp;the project: from the erection of&nbsp;monolithic structures to&nbsp;the detailed design of&nbsp;facades and engineering systems. Dozens of&nbsp;processes are being carried out simultaneously on&nbsp;the sites, which allows us&nbsp;to&nbsp;maintain a&nbsp;high pace. &#8203;&#8203;- Installation of&nbsp;engineering systems Work is&nbsp;underway on&nbsp;the installation of&nbsp;a&nbsp;structured cable system. Installation of&nbsp;water fire extinguishing system pipelines is&nbsp;underway. Work is&nbsp;underway on&nbsp;electrical lighting and power supply in&nbsp;the units. &#8203;&#8203;- Masonry work Ceramic block masonry is&nbsp;being laid on&nbsp;the 1st floor, and side panels are being installed for stained glass windows on&nbsp;the 1st floor. &#8203;&#8203;- Work on&nbsp;balconies Work is&nbsp;underway on&nbsp;the installation of&nbsp;upper waterproofing coating (4 floors), laying porcelain tiles on&nbsp;balconies (4 floors), cladding the ceiling with concrete panels (5 floors), and applying decorative plaster to&nbsp;the walls (6 floors). &#8203;&#8203;- Facade work Work continues on&nbsp;plastering the facade using beacons and insulating the facade, installing mineral wool. Facade lighting materials have been ordered and delivered for further installation. &mdash;&nbsp;Installation of&nbsp;a&nbsp;panoramic elevator Work has been completed on&nbsp;extending the balconies of&nbsp;the panoramic elevator. &#8203;&#8203;- Finishing work in&nbsp;common areas. Plastering work is&nbsp;underway in&nbsp;the stairwell area. &#8203;&#8203;- Work on&nbsp;the infrastructure building Walls, columns, and floor slabs have been installed on&nbsp;all floors of&nbsp;the building. Ceramic blocks have been laid on&nbsp;the exterior walls of&nbsp;the entire building. &#8211; Wyndham Grand Batumi Gonio","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-aqua-october-2025-october-saw-dynamic-progress-on-all-fronts-of-the-project-from-the-erection-of-monolithic-structures-to-t\/","og_locale":"en_US","og_type":"article","og_title":"Monthly construction report Wyndham Grand Batumi Gonio. Aqua October 2025 October saw dynamic progress on&nbsp;all fronts of&nbsp;the project: from the erection of&nbsp;monolithic structures to&nbsp;the detailed design of&nbsp;facades and engineering systems. Dozens of&nbsp;processes are being carried out simultaneously on&nbsp;the sites, which allows us&nbsp;to&nbsp;maintain a&nbsp;high pace. &#8203;&#8203;- Installation of&nbsp;engineering systems Work is&nbsp;underway on&nbsp;the installation of&nbsp;a&nbsp;structured cable system. Installation of&nbsp;water fire extinguishing system pipelines is&nbsp;underway. Work is&nbsp;underway on&nbsp;electrical lighting and power supply in&nbsp;the units. &#8203;&#8203;- Masonry work Ceramic block masonry is&nbsp;being laid on&nbsp;the 1st floor, and side panels are being installed for stained glass windows on&nbsp;the 1st floor. &#8203;&#8203;- Work on&nbsp;balconies Work is&nbsp;underway on&nbsp;the installation of&nbsp;upper waterproofing coating (4 floors), laying porcelain tiles on&nbsp;balconies (4 floors), cladding the ceiling with concrete panels (5 floors), and applying decorative plaster to&nbsp;the walls (6 floors). &#8203;&#8203;- Facade work Work continues on&nbsp;plastering the facade using beacons and insulating the facade, installing mineral wool. Facade lighting materials have been ordered and delivered for further installation. &mdash;&nbsp;Installation of&nbsp;a&nbsp;panoramic elevator Work has been completed on&nbsp;extending the balconies of&nbsp;the panoramic elevator. &#8203;&#8203;- Finishing work in&nbsp;common areas. Plastering work is&nbsp;underway in&nbsp;the stairwell area. &#8203;&#8203;- Work on&nbsp;the infrastructure building Walls, columns, and floor slabs have been installed on&nbsp;all floors of&nbsp;the building. Ceramic blocks have been laid on&nbsp;the exterior walls of&nbsp;the entire building. &#8211; Wyndham Grand Batumi Gonio","og_url":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-aqua-october-2025-october-saw-dynamic-progress-on-all-fronts-of-the-project-from-the-erection-of-monolithic-structures-to-t\/","og_site_name":"Wyndham Grand Batumi Gonio","article_modified_time":"2025-11-17T14:57:49+00:00","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-aqua-october-2025-october-saw-dynamic-progress-on-all-fronts-of-the-project-from-the-erection-of-monolithic-structures-to-t\/","url":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-aqua-october-2025-october-saw-dynamic-progress-on-all-fronts-of-the-project-from-the-erection-of-monolithic-structures-to-t\/","name":"Monthly construction report Wyndham Grand Batumi Gonio. Aqua October 2025 October saw dynamic progress on&nbsp;all fronts of&nbsp;the project: from the erection of&nbsp;monolithic structures to&nbsp;the detailed design of&nbsp;facades and engineering systems. Dozens of&nbsp;processes are being carried out simultaneously on&nbsp;the sites, which allows us&nbsp;to&nbsp;maintain a&nbsp;high pace. &#8203;&#8203;- Installation of&nbsp;engineering systems Work is&nbsp;underway on&nbsp;the installation of&nbsp;a&nbsp;structured cable system. Installation of&nbsp;water fire extinguishing system pipelines is&nbsp;underway. Work is&nbsp;underway on&nbsp;electrical lighting and power supply in&nbsp;the units. &#8203;&#8203;- Masonry work Ceramic block masonry is&nbsp;being laid on&nbsp;the 1st floor, and side panels are being installed for stained glass windows on&nbsp;the 1st floor. &#8203;&#8203;- Work on&nbsp;balconies Work is&nbsp;underway on&nbsp;the installation of&nbsp;upper waterproofing coating (4 floors), laying porcelain tiles on&nbsp;balconies (4 floors), cladding the ceiling with concrete panels (5 floors), and applying decorative plaster to&nbsp;the walls (6 floors). &#8203;&#8203;- Facade work Work continues on&nbsp;plastering the facade using beacons and insulating the facade, installing mineral wool. Facade lighting materials have been ordered and delivered for further installation. &mdash;&nbsp;Installation of&nbsp;a&nbsp;panoramic elevator Work has been completed on&nbsp;extending the balconies of&nbsp;the panoramic elevator. &#8203;&#8203;- Finishing work in&nbsp;common areas. Plastering work is&nbsp;underway in&nbsp;the stairwell area. &#8203;&#8203;- Work on&nbsp;the infrastructure building Walls, columns, and floor slabs have been installed on&nbsp;all floors of&nbsp;the building. Ceramic blocks have been laid on&nbsp;the exterior walls of&nbsp;the entire building. &#8211; Wyndham Grand Batumi Gonio","isPartOf":{"@id":"https:\/\/wyndhamgrandbatumigonio.com\/#website"},"datePublished":"2025-11-17T14:57:48+00:00","dateModified":"2025-11-17T14:57:49+00:00","breadcrumb":{"@id":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-aqua-october-2025-october-saw-dynamic-progress-on-all-fronts-of-the-project-from-the-erection-of-monolithic-structures-to-t\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-aqua-october-2025-october-saw-dynamic-progress-on-all-fronts-of-the-project-from-the-erection-of-monolithic-structures-to-t\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-aqua-october-2025-october-saw-dynamic-progress-on-all-fronts-of-the-project-from-the-erection-of-monolithic-structures-to-t\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430","item":"https:\/\/wyndhamgrandbatumigonio.com\/en\/"},{"@type":"ListItem","position":2,"name":"Monthly construction report Wyndham Grand Batumi Gonio. Aqua October 2025 October saw dynamic progress on&nbsp;all fronts of&nbsp;the project: from the erection of&nbsp;monolithic structures to&nbsp;the detailed design of&nbsp;facades and engineering systems. Dozens of&nbsp;processes are being carried out simultaneously on&nbsp;the sites, which allows us&nbsp;to&nbsp;maintain a&nbsp;high pace. &#8203;&#8203;- Installation of&nbsp;engineering systems Work is&nbsp;underway on&nbsp;the installation of&nbsp;a&nbsp;structured cable system. Installation of&nbsp;water fire extinguishing system pipelines is&nbsp;underway. Work is&nbsp;underway on&nbsp;electrical lighting and power supply in&nbsp;the units. &#8203;&#8203;- Masonry work Ceramic block masonry is&nbsp;being laid on&nbsp;the 1st floor, and side panels are being installed for stained glass windows on&nbsp;the 1st floor. &#8203;&#8203;- Work on&nbsp;balconies Work is&nbsp;underway on&nbsp;the installation of&nbsp;upper waterproofing coating (4 floors), laying porcelain tiles on&nbsp;balconies (4 floors), cladding the ceiling with concrete panels (5 floors), and applying decorative plaster to&nbsp;the walls (6 floors). &#8203;&#8203;- Facade work Work continues on&nbsp;plastering the facade using beacons and insulating the facade, installing mineral wool. Facade lighting materials have been ordered and delivered for further installation. &mdash;&nbsp;Installation of&nbsp;a&nbsp;panoramic elevator Work has been completed on&nbsp;extending the balconies of&nbsp;the panoramic elevator. &#8203;&#8203;- Finishing work in&nbsp;common areas. Plastering work is&nbsp;underway in&nbsp;the stairwell area. &#8203;&#8203;- Work on&nbsp;the infrastructure building Walls, columns, and floor slabs have been installed on&nbsp;all floors of&nbsp;the building. Ceramic blocks have been laid on&nbsp;the exterior walls of&nbsp;the entire building."}]},{"@type":"WebSite","@id":"https:\/\/wyndhamgrandbatumigonio.com\/#website","url":"https:\/\/wyndhamgrandbatumigonio.com\/","name":"Wyndham Grand Batumi Gonio","description":"The benefits of investing in a brand from the world&#039;s leading hotel chain Wyndham Grand","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/wyndhamgrandbatumigonio.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/news\/44125","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/types\/news"}],"wp:attachment":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/media?parent=44125"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}