{"id":44134,"date":"2025-11-17T19:31:16","date_gmt":"2025-11-17T15:31:16","guid":{"rendered":"https:\/\/wyndhamgrandbatumigonio.com\/?post_type=news&#038;p=44134"},"modified":"2025-11-17T19:31:17","modified_gmt":"2025-11-17T15:31:17","slug":"monthly-construction-report-wyndham-grand-batumi-gonio-family-club-october-2025-in-october-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction","status":"publish","type":"news","link":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-family-club-october-2025-in-october-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction\/","title":{"rendered":"<b>Monthly Construction Report<br \/> Wyndham Grand Batumi Gonio. Family Club<br \/> October 2025<b> <p>In&nbsp;October 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project.<br \/> Block A<br \/> &mdash;&nbsp;During the installation of&nbsp;the roofing system, vapor barrier installation was completed, insulation with a&nbsp;slope was laid, and PVC membrane installation and insulation with a&nbsp;slope are underway.<br \/> &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;the upper waterproofing coating for the balconies on&nbsp;the 2nd floor. .<br \/> &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;porcelain stoneware on&nbsp;the balconies.<br \/> &mdash;&nbsp;Plastering work is&nbsp;underway: reinforcement for the application of&nbsp;decorative plaster, plastering work on&nbsp;the outside of&nbsp;the balconies, plastering work on&nbsp;the facade of&nbsp;the block.<br \/> &mdash;&nbsp;Facade work continues&nbsp;&mdash; installation of&nbsp;mineral wool, reinforcement and plastering, priming for the application of&nbsp;decorative plaster.<br \/> &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;clinker tiles on&nbsp;the facade and the installation of&nbsp;stone window sills.<br \/> &mdash;&nbsp;Decorative facade elements (cornices) have been ordered and are being delivered for subsequent installation.<br \/> &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;clinker tiles on&nbsp;the facade.<br \/> &mdash;&nbsp;Storm sewer risers have been installed from the roof, and storm sewer pipes have been delivered for installation.<br \/> Block B<br \/> &mdash;&nbsp;Work has been completed on&nbsp;the installation of&nbsp;the roofing system: installation of&nbsp;a&nbsp;vapor barrier layer, insulation layer, screed with slope, installation of&nbsp;water collection funnels, and installation of&nbsp;a&nbsp;PVC membrane.<br \/> &mdash;&nbsp;Stained glass frames and <nobr>double-glazed<\/nobr> windows have been ordered and are being delivered. Installation of&nbsp;stained glass profiles is&nbsp;underway.<br \/> &mdash;&nbsp;Work on&nbsp;installing the ceiling frame has been completed. Ceiling cladding is&nbsp;currently underway.<br \/> &mdash;&nbsp;Work is&nbsp;underway on&nbsp;installing window slopes.<br \/> &mdash;&nbsp;Work is&nbsp;underway on&nbsp;plastering terraces and interior walls, and plastering work has been completed on&nbsp;the facade under XPS.<br \/> &mdash;&nbsp;Work is&nbsp;continuing on&nbsp;the installation of&nbsp;mineral wool on&nbsp;the 2nd and 3rd floors.<br \/> &mdash;&nbsp;Work has been completed on&nbsp;the installation of&nbsp;metal storm sewer boxes on&nbsp;the 1st floor.<\/p>"},"content":{"rendered":"\n<p><\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><a href=\"https:\/\/wyndhamgrandbatumigonio.com\/wp-admin\/edit.php?post_type=news\"><\/a><\/p>\n\n\n\n<p><\/p>\n","protected":false},"template":"","class_list":["post-44134","news","type-news","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Monthly Construction Report Wyndham Grand Batumi Gonio. Family Club October 2025 In&nbsp;October 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Block A &mdash;&nbsp;During the installation of&nbsp;the roofing system, vapor barrier installation was completed, insulation with a&nbsp;slope was laid, and PVC membrane installation and insulation with a&nbsp;slope are underway. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;the upper waterproofing coating for the balconies on&nbsp;the 2nd floor. . &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;porcelain stoneware on&nbsp;the balconies. &mdash;&nbsp;Plastering work is&nbsp;underway: reinforcement for the application of&nbsp;decorative plaster, plastering work on&nbsp;the outside of&nbsp;the balconies, plastering work on&nbsp;the facade of&nbsp;the block. &mdash;&nbsp;Facade work continues&nbsp;&mdash; installation of&nbsp;mineral wool, reinforcement and plastering, priming for the application of&nbsp;decorative plaster. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;clinker tiles on&nbsp;the facade and the installation of&nbsp;stone window sills. &mdash;&nbsp;Decorative facade elements (cornices) have been ordered and are being delivered for subsequent installation. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;clinker tiles on&nbsp;the facade. &mdash;&nbsp;Storm sewer risers have been installed from the roof, and storm sewer pipes have been delivered for installation. Block B &mdash;&nbsp;Work has been completed on&nbsp;the installation of&nbsp;the roofing system: installation of&nbsp;a&nbsp;vapor barrier layer, insulation layer, screed with slope, installation of&nbsp;water collection funnels, and installation of&nbsp;a&nbsp;PVC membrane. &mdash;&nbsp;Stained glass frames and double-glazed windows have been ordered and are being delivered. Installation of&nbsp;stained glass profiles is&nbsp;underway. &mdash;&nbsp;Work on&nbsp;installing the ceiling frame has been completed. Ceiling cladding is&nbsp;currently underway. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;installing window slopes. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;plastering terraces and interior walls, and plastering work has been completed on&nbsp;the facade under XPS. &mdash;&nbsp;Work is&nbsp;continuing on&nbsp;the installation of&nbsp;mineral wool on&nbsp;the 2nd and 3rd floors. &mdash;&nbsp;Work has been completed on&nbsp;the installation of&nbsp;metal storm sewer boxes on&nbsp;the 1st floor. &#8211; Wyndham Grand Batumi Gonio<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-family-club-october-2025-in-october-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Monthly Construction Report Wyndham Grand Batumi Gonio. Family Club October 2025 In&nbsp;October 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Block A &mdash;&nbsp;During the installation of&nbsp;the roofing system, vapor barrier installation was completed, insulation with a&nbsp;slope was laid, and PVC membrane installation and insulation with a&nbsp;slope are underway. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;the upper waterproofing coating for the balconies on&nbsp;the 2nd floor. . &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;porcelain stoneware on&nbsp;the balconies. &mdash;&nbsp;Plastering work is&nbsp;underway: reinforcement for the application of&nbsp;decorative plaster, plastering work on&nbsp;the outside of&nbsp;the balconies, plastering work on&nbsp;the facade of&nbsp;the block. &mdash;&nbsp;Facade work continues&nbsp;&mdash; installation of&nbsp;mineral wool, reinforcement and plastering, priming for the application of&nbsp;decorative plaster. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;clinker tiles on&nbsp;the facade and the installation of&nbsp;stone window sills. &mdash;&nbsp;Decorative facade elements (cornices) have been ordered and are being delivered for subsequent installation. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;clinker tiles on&nbsp;the facade. &mdash;&nbsp;Storm sewer risers have been installed from the roof, and storm sewer pipes have been delivered for installation. Block B &mdash;&nbsp;Work has been completed on&nbsp;the installation of&nbsp;the roofing system: installation of&nbsp;a&nbsp;vapor barrier layer, insulation layer, screed with slope, installation of&nbsp;water collection funnels, and installation of&nbsp;a&nbsp;PVC membrane. &mdash;&nbsp;Stained glass frames and double-glazed windows have been ordered and are being delivered. Installation of&nbsp;stained glass profiles is&nbsp;underway. &mdash;&nbsp;Work on&nbsp;installing the ceiling frame has been completed. Ceiling cladding is&nbsp;currently underway. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;installing window slopes. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;plastering terraces and interior walls, and plastering work has been completed on&nbsp;the facade under XPS. &mdash;&nbsp;Work is&nbsp;continuing on&nbsp;the installation of&nbsp;mineral wool on&nbsp;the 2nd and 3rd floors. &mdash;&nbsp;Work has been completed on&nbsp;the installation of&nbsp;metal storm sewer boxes on&nbsp;the 1st floor. &#8211; Wyndham Grand Batumi Gonio\" \/>\n<meta property=\"og:url\" content=\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-family-club-october-2025-in-october-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction\/\" \/>\n<meta property=\"og:site_name\" content=\"Wyndham Grand Batumi Gonio\" \/>\n<meta property=\"article:modified_time\" content=\"2025-11-17T15:31:17+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-family-club-october-2025-in-october-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction\/\",\"url\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-family-club-october-2025-in-october-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction\/\",\"name\":\"Monthly Construction Report Wyndham Grand Batumi Gonio. Family Club October 2025 In&nbsp;October 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Block A &mdash;&nbsp;During the installation of&nbsp;the roofing system, vapor barrier installation was completed, insulation with a&nbsp;slope was laid, and PVC membrane installation and insulation with a&nbsp;slope are underway. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;the upper waterproofing coating for the balconies on&nbsp;the 2nd floor. . &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;porcelain stoneware on&nbsp;the balconies. &mdash;&nbsp;Plastering work is&nbsp;underway: reinforcement for the application of&nbsp;decorative plaster, plastering work on&nbsp;the outside of&nbsp;the balconies, plastering work on&nbsp;the facade of&nbsp;the block. &mdash;&nbsp;Facade work continues&nbsp;&mdash; installation of&nbsp;mineral wool, reinforcement and plastering, priming for the application of&nbsp;decorative plaster. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;clinker tiles on&nbsp;the facade and the installation of&nbsp;stone window sills. &mdash;&nbsp;Decorative facade elements (cornices) have been ordered and are being delivered for subsequent installation. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;clinker tiles on&nbsp;the facade. &mdash;&nbsp;Storm sewer risers have been installed from the roof, and storm sewer pipes have been delivered for installation. Block B &mdash;&nbsp;Work has been completed on&nbsp;the installation of&nbsp;the roofing system: installation of&nbsp;a&nbsp;vapor barrier layer, insulation layer, screed with slope, installation of&nbsp;water collection funnels, and installation of&nbsp;a&nbsp;PVC membrane. &mdash;&nbsp;Stained glass frames and double-glazed windows have been ordered and are being delivered. Installation of&nbsp;stained glass profiles is&nbsp;underway. &mdash;&nbsp;Work on&nbsp;installing the ceiling frame has been completed. Ceiling cladding is&nbsp;currently underway. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;installing window slopes. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;plastering terraces and interior walls, and plastering work has been completed on&nbsp;the facade under XPS. &mdash;&nbsp;Work is&nbsp;continuing on&nbsp;the installation of&nbsp;mineral wool on&nbsp;the 2nd and 3rd floors. &mdash;&nbsp;Work has been completed on&nbsp;the installation of&nbsp;metal storm sewer boxes on&nbsp;the 1st floor. &#8211; Wyndham Grand Batumi Gonio\",\"isPartOf\":{\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/#website\"},\"datePublished\":\"2025-11-17T15:31:16+00:00\",\"dateModified\":\"2025-11-17T15:31:17+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-family-club-october-2025-in-october-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-family-club-october-2025-in-october-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-family-club-october-2025-in-october-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430\",\"item\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Monthly Construction Report Wyndham Grand Batumi Gonio. Family Club October 2025 In&nbsp;October 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Block A &mdash;&nbsp;During the installation of&nbsp;the roofing system, vapor barrier installation was completed, insulation with a&nbsp;slope was laid, and PVC membrane installation and insulation with a&nbsp;slope are underway. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;the upper waterproofing coating for the balconies on&nbsp;the 2nd floor. . &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;porcelain stoneware on&nbsp;the balconies. &mdash;&nbsp;Plastering work is&nbsp;underway: reinforcement for the application of&nbsp;decorative plaster, plastering work on&nbsp;the outside of&nbsp;the balconies, plastering work on&nbsp;the facade of&nbsp;the block. &mdash;&nbsp;Facade work continues&nbsp;&mdash; installation of&nbsp;mineral wool, reinforcement and plastering, priming for the application of&nbsp;decorative plaster. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;clinker tiles on&nbsp;the facade and the installation of&nbsp;stone window sills. &mdash;&nbsp;Decorative facade elements (cornices) have been ordered and are being delivered for subsequent installation. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;clinker tiles on&nbsp;the facade. &mdash;&nbsp;Storm sewer risers have been installed from the roof, and storm sewer pipes have been delivered for installation. Block B &mdash;&nbsp;Work has been completed on&nbsp;the installation of&nbsp;the roofing system: installation of&nbsp;a&nbsp;vapor barrier layer, insulation layer, screed with slope, installation of&nbsp;water collection funnels, and installation of&nbsp;a&nbsp;PVC membrane. &mdash;&nbsp;Stained glass frames and double-glazed windows have been ordered and are being delivered. Installation of&nbsp;stained glass profiles is&nbsp;underway. &mdash;&nbsp;Work on&nbsp;installing the ceiling frame has been completed. Ceiling cladding is&nbsp;currently underway. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;installing window slopes. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;plastering terraces and interior walls, and plastering work has been completed on&nbsp;the facade under XPS. &mdash;&nbsp;Work is&nbsp;continuing on&nbsp;the installation of&nbsp;mineral wool on&nbsp;the 2nd and 3rd floors. &mdash;&nbsp;Work has been completed on&nbsp;the installation of&nbsp;metal storm sewer boxes on&nbsp;the 1st floor.\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/#website\",\"url\":\"https:\/\/wyndhamgrandbatumigonio.com\/\",\"name\":\"Wyndham Grand Batumi Gonio\",\"description\":\"The benefits of investing in a brand from the world&#039;s leading hotel chain Wyndham Grand\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/wyndhamgrandbatumigonio.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Monthly Construction Report Wyndham Grand Batumi Gonio. Family Club October 2025 In&nbsp;October 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Block A &mdash;&nbsp;During the installation of&nbsp;the roofing system, vapor barrier installation was completed, insulation with a&nbsp;slope was laid, and PVC membrane installation and insulation with a&nbsp;slope are underway. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;the upper waterproofing coating for the balconies on&nbsp;the 2nd floor. . &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;porcelain stoneware on&nbsp;the balconies. &mdash;&nbsp;Plastering work is&nbsp;underway: reinforcement for the application of&nbsp;decorative plaster, plastering work on&nbsp;the outside of&nbsp;the balconies, plastering work on&nbsp;the facade of&nbsp;the block. &mdash;&nbsp;Facade work continues&nbsp;&mdash; installation of&nbsp;mineral wool, reinforcement and plastering, priming for the application of&nbsp;decorative plaster. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;clinker tiles on&nbsp;the facade and the installation of&nbsp;stone window sills. &mdash;&nbsp;Decorative facade elements (cornices) have been ordered and are being delivered for subsequent installation. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;clinker tiles on&nbsp;the facade. &mdash;&nbsp;Storm sewer risers have been installed from the roof, and storm sewer pipes have been delivered for installation. Block B &mdash;&nbsp;Work has been completed on&nbsp;the installation of&nbsp;the roofing system: installation of&nbsp;a&nbsp;vapor barrier layer, insulation layer, screed with slope, installation of&nbsp;water collection funnels, and installation of&nbsp;a&nbsp;PVC membrane. &mdash;&nbsp;Stained glass frames and double-glazed windows have been ordered and are being delivered. Installation of&nbsp;stained glass profiles is&nbsp;underway. &mdash;&nbsp;Work on&nbsp;installing the ceiling frame has been completed. Ceiling cladding is&nbsp;currently underway. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;installing window slopes. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;plastering terraces and interior walls, and plastering work has been completed on&nbsp;the facade under XPS. &mdash;&nbsp;Work is&nbsp;continuing on&nbsp;the installation of&nbsp;mineral wool on&nbsp;the 2nd and 3rd floors. &mdash;&nbsp;Work has been completed on&nbsp;the installation of&nbsp;metal storm sewer boxes on&nbsp;the 1st floor. &#8211; Wyndham Grand Batumi Gonio","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-family-club-october-2025-in-october-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction\/","og_locale":"en_US","og_type":"article","og_title":"Monthly Construction Report Wyndham Grand Batumi Gonio. Family Club October 2025 In&nbsp;October 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Block A &mdash;&nbsp;During the installation of&nbsp;the roofing system, vapor barrier installation was completed, insulation with a&nbsp;slope was laid, and PVC membrane installation and insulation with a&nbsp;slope are underway. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;the upper waterproofing coating for the balconies on&nbsp;the 2nd floor. . &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;porcelain stoneware on&nbsp;the balconies. &mdash;&nbsp;Plastering work is&nbsp;underway: reinforcement for the application of&nbsp;decorative plaster, plastering work on&nbsp;the outside of&nbsp;the balconies, plastering work on&nbsp;the facade of&nbsp;the block. &mdash;&nbsp;Facade work continues&nbsp;&mdash; installation of&nbsp;mineral wool, reinforcement and plastering, priming for the application of&nbsp;decorative plaster. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;clinker tiles on&nbsp;the facade and the installation of&nbsp;stone window sills. &mdash;&nbsp;Decorative facade elements (cornices) have been ordered and are being delivered for subsequent installation. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;clinker tiles on&nbsp;the facade. &mdash;&nbsp;Storm sewer risers have been installed from the roof, and storm sewer pipes have been delivered for installation. Block B &mdash;&nbsp;Work has been completed on&nbsp;the installation of&nbsp;the roofing system: installation of&nbsp;a&nbsp;vapor barrier layer, insulation layer, screed with slope, installation of&nbsp;water collection funnels, and installation of&nbsp;a&nbsp;PVC membrane. &mdash;&nbsp;Stained glass frames and double-glazed windows have been ordered and are being delivered. Installation of&nbsp;stained glass profiles is&nbsp;underway. &mdash;&nbsp;Work on&nbsp;installing the ceiling frame has been completed. Ceiling cladding is&nbsp;currently underway. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;installing window slopes. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;plastering terraces and interior walls, and plastering work has been completed on&nbsp;the facade under XPS. &mdash;&nbsp;Work is&nbsp;continuing on&nbsp;the installation of&nbsp;mineral wool on&nbsp;the 2nd and 3rd floors. &mdash;&nbsp;Work has been completed on&nbsp;the installation of&nbsp;metal storm sewer boxes on&nbsp;the 1st floor. &#8211; Wyndham Grand Batumi Gonio","og_url":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-family-club-october-2025-in-october-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction\/","og_site_name":"Wyndham Grand Batumi Gonio","article_modified_time":"2025-11-17T15:31:17+00:00","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-family-club-october-2025-in-october-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction\/","url":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-family-club-october-2025-in-october-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction\/","name":"Monthly Construction Report Wyndham Grand Batumi Gonio. Family Club October 2025 In&nbsp;October 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Block A &mdash;&nbsp;During the installation of&nbsp;the roofing system, vapor barrier installation was completed, insulation with a&nbsp;slope was laid, and PVC membrane installation and insulation with a&nbsp;slope are underway. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;the upper waterproofing coating for the balconies on&nbsp;the 2nd floor. . &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;porcelain stoneware on&nbsp;the balconies. &mdash;&nbsp;Plastering work is&nbsp;underway: reinforcement for the application of&nbsp;decorative plaster, plastering work on&nbsp;the outside of&nbsp;the balconies, plastering work on&nbsp;the facade of&nbsp;the block. &mdash;&nbsp;Facade work continues&nbsp;&mdash; installation of&nbsp;mineral wool, reinforcement and plastering, priming for the application of&nbsp;decorative plaster. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;clinker tiles on&nbsp;the facade and the installation of&nbsp;stone window sills. &mdash;&nbsp;Decorative facade elements (cornices) have been ordered and are being delivered for subsequent installation. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;clinker tiles on&nbsp;the facade. &mdash;&nbsp;Storm sewer risers have been installed from the roof, and storm sewer pipes have been delivered for installation. Block B &mdash;&nbsp;Work has been completed on&nbsp;the installation of&nbsp;the roofing system: installation of&nbsp;a&nbsp;vapor barrier layer, insulation layer, screed with slope, installation of&nbsp;water collection funnels, and installation of&nbsp;a&nbsp;PVC membrane. &mdash;&nbsp;Stained glass frames and double-glazed windows have been ordered and are being delivered. Installation of&nbsp;stained glass profiles is&nbsp;underway. &mdash;&nbsp;Work on&nbsp;installing the ceiling frame has been completed. Ceiling cladding is&nbsp;currently underway. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;installing window slopes. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;plastering terraces and interior walls, and plastering work has been completed on&nbsp;the facade under XPS. &mdash;&nbsp;Work is&nbsp;continuing on&nbsp;the installation of&nbsp;mineral wool on&nbsp;the 2nd and 3rd floors. &mdash;&nbsp;Work has been completed on&nbsp;the installation of&nbsp;metal storm sewer boxes on&nbsp;the 1st floor. &#8211; Wyndham Grand Batumi Gonio","isPartOf":{"@id":"https:\/\/wyndhamgrandbatumigonio.com\/#website"},"datePublished":"2025-11-17T15:31:16+00:00","dateModified":"2025-11-17T15:31:17+00:00","breadcrumb":{"@id":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-family-club-october-2025-in-october-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-family-club-october-2025-in-october-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-family-club-october-2025-in-october-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430","item":"https:\/\/wyndhamgrandbatumigonio.com\/en\/"},{"@type":"ListItem","position":2,"name":"Monthly Construction Report Wyndham Grand Batumi Gonio. Family Club October 2025 In&nbsp;October 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Block A &mdash;&nbsp;During the installation of&nbsp;the roofing system, vapor barrier installation was completed, insulation with a&nbsp;slope was laid, and PVC membrane installation and insulation with a&nbsp;slope are underway. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;the upper waterproofing coating for the balconies on&nbsp;the 2nd floor. . &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;porcelain stoneware on&nbsp;the balconies. &mdash;&nbsp;Plastering work is&nbsp;underway: reinforcement for the application of&nbsp;decorative plaster, plastering work on&nbsp;the outside of&nbsp;the balconies, plastering work on&nbsp;the facade of&nbsp;the block. &mdash;&nbsp;Facade work continues&nbsp;&mdash; installation of&nbsp;mineral wool, reinforcement and plastering, priming for the application of&nbsp;decorative plaster. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;clinker tiles on&nbsp;the facade and the installation of&nbsp;stone window sills. &mdash;&nbsp;Decorative facade elements (cornices) have been ordered and are being delivered for subsequent installation. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;clinker tiles on&nbsp;the facade. &mdash;&nbsp;Storm sewer risers have been installed from the roof, and storm sewer pipes have been delivered for installation. Block B &mdash;&nbsp;Work has been completed on&nbsp;the installation of&nbsp;the roofing system: installation of&nbsp;a&nbsp;vapor barrier layer, insulation layer, screed with slope, installation of&nbsp;water collection funnels, and installation of&nbsp;a&nbsp;PVC membrane. &mdash;&nbsp;Stained glass frames and double-glazed windows have been ordered and are being delivered. Installation of&nbsp;stained glass profiles is&nbsp;underway. &mdash;&nbsp;Work on&nbsp;installing the ceiling frame has been completed. Ceiling cladding is&nbsp;currently underway. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;installing window slopes. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;plastering terraces and interior walls, and plastering work has been completed on&nbsp;the facade under XPS. &mdash;&nbsp;Work is&nbsp;continuing on&nbsp;the installation of&nbsp;mineral wool on&nbsp;the 2nd and 3rd floors. &mdash;&nbsp;Work has been completed on&nbsp;the installation of&nbsp;metal storm sewer boxes on&nbsp;the 1st floor."}]},{"@type":"WebSite","@id":"https:\/\/wyndhamgrandbatumigonio.com\/#website","url":"https:\/\/wyndhamgrandbatumigonio.com\/","name":"Wyndham Grand Batumi Gonio","description":"The benefits of investing in a brand from the world&#039;s leading hotel chain Wyndham Grand","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/wyndhamgrandbatumigonio.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/news\/44134","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/types\/news"}],"wp:attachment":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/media?parent=44134"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}