{"id":44293,"date":"2025-12-09T20:00:46","date_gmt":"2025-12-09T16:00:46","guid":{"rendered":"https:\/\/wyndhamgrandbatumigonio.com\/?post_type=news&#038;p=44293"},"modified":"2025-12-10T04:04:56","modified_gmt":"2025-12-10T00:04:56","slug":"monthly-construction-report-wyndham-grand-batumi-gonio-aqua-november-2025-november-saw-dynamic-progress-on-all-fronts-of-the-project-from-the-construction-of-monolithic-structures-to","status":"publish","type":"news","link":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-aqua-november-2025-november-saw-dynamic-progress-on-all-fronts-of-the-project-from-the-construction-of-monolithic-structures-to\/","title":{"rendered":"<b>Monthly construction report<br \/> Wyndham Grand Batumi Gonio. Aqua<br \/> November 2025<b> <p>November saw dynamic progress on&nbsp;all fronts of&nbsp;the project: from the construction of&nbsp;monolithic structures to&nbsp;the detailed design of&nbsp;facades and engineering systems. Dozens of&nbsp;processes are being carried out simultaneously on&nbsp;the sites, which allows us&nbsp;to&nbsp;maintain a&nbsp;high pace.<br \/> &mdash;&nbsp;Monolithic works<br \/> The excavation for the entrance group has been completed. Monolithic works on&nbsp;the construction of&nbsp;the foundation and columns of&nbsp;the entrance group have begun and are continuing.<\/p> <p>The fire reservoir has been constructed.<br \/> &mdash;&nbsp;Masonry works<br \/> Ceramic block masonry has been completed on&nbsp;the 1st floor.<br \/> &mdash;&nbsp;Works on&nbsp;balconies<br \/> Work continues: installation of&nbsp;upper waterproofing coating, laying of&nbsp;porcelain stoneware on&nbsp;balconies, cladding of&nbsp;the ceiling with concrete panels (5 floors), reinforcement of&nbsp;the ceiling (6 floors), application of&nbsp;decorative plaster to&nbsp;the walls (6 floors), application of&nbsp;decorative plaster to&nbsp;the ceiling (6 floors).<br \/> &#8203;&#8203;- Facade work<br \/> Work continues on&nbsp;the installation of&nbsp;mineral wool, XPS, reinforcement of&nbsp;insulation, plastering of&nbsp;the facade, priming for the application of&nbsp;decorative plaster.<\/p> <p>The installation of&nbsp;decorative elements on&nbsp;the facade has begun.<\/p> <p>Work has begun and is&nbsp;continuing on&nbsp;the installation of&nbsp;facade lighting&nbsp;&mdash; laying facade lighting cables, installing brackets for lighting fixtures.<\/p> <p>&#8203;&#8203;- Installation of&nbsp;engineering systems<br \/> Ventilation ducts have been ordered and delivered. Metal ventilation boxes are being manufactured.<br \/> &#8203;&#8203;- Glazing on&nbsp;the 10th floor.<br \/> Metal trusses have been manufactured and are being installed. Metal columns are being manufactured.<br \/> &#8203;&#8203;- Elevator installation<br \/> Work is&nbsp;underway on&nbsp;the installation of&nbsp;elevator equipment.<br \/> &mdash;&nbsp;Work on&nbsp;the infrastructure building<br \/> Monolithic sidewalls are being installed on&nbsp;the roof.<\/p> <p>Engineering shafts and elevator shafts have been laid on&nbsp;the roof. Monolithic shaft belts are being installed.<\/p> <p>Plastering work on&nbsp;the facade has begun and is&nbsp;continuing.<\/p>"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/wyndhamgrandbatumigonio.com\/wp-admin\/edit.php?post_type=news\"><\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"template":"","class_list":["post-44293","news","type-news","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Monthly construction report Wyndham Grand Batumi Gonio. Aqua November 2025 November saw dynamic progress on&nbsp;all fronts of&nbsp;the project: from the construction of&nbsp;monolithic structures to&nbsp;the detailed design of&nbsp;facades and engineering systems. Dozens of&nbsp;processes are being carried out simultaneously on&nbsp;the sites, which allows us&nbsp;to&nbsp;maintain a&nbsp;high pace. &mdash;&nbsp;Monolithic works The excavation for the entrance group has been completed. Monolithic works on&nbsp;the construction of&nbsp;the foundation and columns of&nbsp;the entrance group have begun and are continuing. The fire reservoir has been constructed. &mdash;&nbsp;Masonry works Ceramic block masonry has been completed on&nbsp;the 1st floor. &mdash;&nbsp;Works on&nbsp;balconies Work continues: installation of&nbsp;upper waterproofing coating, laying of&nbsp;porcelain stoneware on&nbsp;balconies, cladding of&nbsp;the ceiling with concrete panels (5 floors), reinforcement of&nbsp;the ceiling (6 floors), application of&nbsp;decorative plaster to&nbsp;the walls (6 floors), application of&nbsp;decorative plaster to&nbsp;the ceiling (6 floors). &#8203;&#8203;- Facade work Work continues on&nbsp;the installation of&nbsp;mineral wool, XPS, reinforcement of&nbsp;insulation, plastering of&nbsp;the facade, priming for the application of&nbsp;decorative plaster. The installation of&nbsp;decorative elements on&nbsp;the facade has begun. Work has begun and is&nbsp;continuing on&nbsp;the installation of&nbsp;facade lighting&nbsp;&mdash; laying facade lighting cables, installing brackets for lighting fixtures. &#8203;&#8203;- Installation of&nbsp;engineering systems Ventilation ducts have been ordered and delivered. Metal ventilation boxes are being manufactured. &#8203;&#8203;- Glazing on&nbsp;the 10th floor. Metal trusses have been manufactured and are being installed. Metal columns are being manufactured. &#8203;&#8203;- Elevator installation Work is&nbsp;underway on&nbsp;the installation of&nbsp;elevator equipment. &mdash;&nbsp;Work on&nbsp;the infrastructure building Monolithic sidewalls are being installed on&nbsp;the roof. Engineering shafts and elevator shafts have been laid on&nbsp;the roof. Monolithic shaft belts are being installed. Plastering work on&nbsp;the facade has begun and is&nbsp;continuing. &#8211; Wyndham Grand Batumi Gonio<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-aqua-november-2025-november-saw-dynamic-progress-on-all-fronts-of-the-project-from-the-construction-of-monolithic-structures-to\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Monthly construction report Wyndham Grand Batumi Gonio. Aqua November 2025 November saw dynamic progress on&nbsp;all fronts of&nbsp;the project: from the construction of&nbsp;monolithic structures to&nbsp;the detailed design of&nbsp;facades and engineering systems. Dozens of&nbsp;processes are being carried out simultaneously on&nbsp;the sites, which allows us&nbsp;to&nbsp;maintain a&nbsp;high pace. &mdash;&nbsp;Monolithic works The excavation for the entrance group has been completed. Monolithic works on&nbsp;the construction of&nbsp;the foundation and columns of&nbsp;the entrance group have begun and are continuing. The fire reservoir has been constructed. &mdash;&nbsp;Masonry works Ceramic block masonry has been completed on&nbsp;the 1st floor. &mdash;&nbsp;Works on&nbsp;balconies Work continues: installation of&nbsp;upper waterproofing coating, laying of&nbsp;porcelain stoneware on&nbsp;balconies, cladding of&nbsp;the ceiling with concrete panels (5 floors), reinforcement of&nbsp;the ceiling (6 floors), application of&nbsp;decorative plaster to&nbsp;the walls (6 floors), application of&nbsp;decorative plaster to&nbsp;the ceiling (6 floors). &#8203;&#8203;- Facade work Work continues on&nbsp;the installation of&nbsp;mineral wool, XPS, reinforcement of&nbsp;insulation, plastering of&nbsp;the facade, priming for the application of&nbsp;decorative plaster. The installation of&nbsp;decorative elements on&nbsp;the facade has begun. Work has begun and is&nbsp;continuing on&nbsp;the installation of&nbsp;facade lighting&nbsp;&mdash; laying facade lighting cables, installing brackets for lighting fixtures. &#8203;&#8203;- Installation of&nbsp;engineering systems Ventilation ducts have been ordered and delivered. Metal ventilation boxes are being manufactured. &#8203;&#8203;- Glazing on&nbsp;the 10th floor. Metal trusses have been manufactured and are being installed. Metal columns are being manufactured. &#8203;&#8203;- Elevator installation Work is&nbsp;underway on&nbsp;the installation of&nbsp;elevator equipment. &mdash;&nbsp;Work on&nbsp;the infrastructure building Monolithic sidewalls are being installed on&nbsp;the roof. Engineering shafts and elevator shafts have been laid on&nbsp;the roof. Monolithic shaft belts are being installed. Plastering work on&nbsp;the facade has begun and is&nbsp;continuing. &#8211; Wyndham Grand Batumi Gonio\" \/>\n<meta property=\"og:url\" content=\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-aqua-november-2025-november-saw-dynamic-progress-on-all-fronts-of-the-project-from-the-construction-of-monolithic-structures-to\/\" \/>\n<meta property=\"og:site_name\" content=\"Wyndham Grand Batumi Gonio\" \/>\n<meta property=\"article:modified_time\" content=\"2025-12-10T00:04:56+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-aqua-november-2025-november-saw-dynamic-progress-on-all-fronts-of-the-project-from-the-construction-of-monolithic-structures-to\/\",\"url\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-aqua-november-2025-november-saw-dynamic-progress-on-all-fronts-of-the-project-from-the-construction-of-monolithic-structures-to\/\",\"name\":\"Monthly construction report Wyndham Grand Batumi Gonio. Aqua November 2025 November saw dynamic progress on&nbsp;all fronts of&nbsp;the project: from the construction of&nbsp;monolithic structures to&nbsp;the detailed design of&nbsp;facades and engineering systems. Dozens of&nbsp;processes are being carried out simultaneously on&nbsp;the sites, which allows us&nbsp;to&nbsp;maintain a&nbsp;high pace. &mdash;&nbsp;Monolithic works The excavation for the entrance group has been completed. Monolithic works on&nbsp;the construction of&nbsp;the foundation and columns of&nbsp;the entrance group have begun and are continuing. The fire reservoir has been constructed. &mdash;&nbsp;Masonry works Ceramic block masonry has been completed on&nbsp;the 1st floor. &mdash;&nbsp;Works on&nbsp;balconies Work continues: installation of&nbsp;upper waterproofing coating, laying of&nbsp;porcelain stoneware on&nbsp;balconies, cladding of&nbsp;the ceiling with concrete panels (5 floors), reinforcement of&nbsp;the ceiling (6 floors), application of&nbsp;decorative plaster to&nbsp;the walls (6 floors), application of&nbsp;decorative plaster to&nbsp;the ceiling (6 floors). &#8203;&#8203;- Facade work Work continues on&nbsp;the installation of&nbsp;mineral wool, XPS, reinforcement of&nbsp;insulation, plastering of&nbsp;the facade, priming for the application of&nbsp;decorative plaster. The installation of&nbsp;decorative elements on&nbsp;the facade has begun. Work has begun and is&nbsp;continuing on&nbsp;the installation of&nbsp;facade lighting&nbsp;&mdash; laying facade lighting cables, installing brackets for lighting fixtures. &#8203;&#8203;- Installation of&nbsp;engineering systems Ventilation ducts have been ordered and delivered. Metal ventilation boxes are being manufactured. &#8203;&#8203;- Glazing on&nbsp;the 10th floor. Metal trusses have been manufactured and are being installed. Metal columns are being manufactured. &#8203;&#8203;- Elevator installation Work is&nbsp;underway on&nbsp;the installation of&nbsp;elevator equipment. &mdash;&nbsp;Work on&nbsp;the infrastructure building Monolithic sidewalls are being installed on&nbsp;the roof. Engineering shafts and elevator shafts have been laid on&nbsp;the roof. Monolithic shaft belts are being installed. Plastering work on&nbsp;the facade has begun and is&nbsp;continuing. &#8211; Wyndham Grand Batumi Gonio\",\"isPartOf\":{\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/#website\"},\"datePublished\":\"2025-12-09T16:00:46+00:00\",\"dateModified\":\"2025-12-10T00:04:56+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-aqua-november-2025-november-saw-dynamic-progress-on-all-fronts-of-the-project-from-the-construction-of-monolithic-structures-to\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-aqua-november-2025-november-saw-dynamic-progress-on-all-fronts-of-the-project-from-the-construction-of-monolithic-structures-to\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-aqua-november-2025-november-saw-dynamic-progress-on-all-fronts-of-the-project-from-the-construction-of-monolithic-structures-to\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430\",\"item\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Monthly construction report Wyndham Grand Batumi Gonio. Aqua November 2025 November saw dynamic progress on&nbsp;all fronts of&nbsp;the project: from the construction of&nbsp;monolithic structures to&nbsp;the detailed design of&nbsp;facades and engineering systems. Dozens of&nbsp;processes are being carried out simultaneously on&nbsp;the sites, which allows us&nbsp;to&nbsp;maintain a&nbsp;high pace. &mdash;&nbsp;Monolithic works The excavation for the entrance group has been completed. Monolithic works on&nbsp;the construction of&nbsp;the foundation and columns of&nbsp;the entrance group have begun and are continuing. The fire reservoir has been constructed. &mdash;&nbsp;Masonry works Ceramic block masonry has been completed on&nbsp;the 1st floor. &mdash;&nbsp;Works on&nbsp;balconies Work continues: installation of&nbsp;upper waterproofing coating, laying of&nbsp;porcelain stoneware on&nbsp;balconies, cladding of&nbsp;the ceiling with concrete panels (5 floors), reinforcement of&nbsp;the ceiling (6 floors), application of&nbsp;decorative plaster to&nbsp;the walls (6 floors), application of&nbsp;decorative plaster to&nbsp;the ceiling (6 floors). &#8203;&#8203;- Facade work Work continues on&nbsp;the installation of&nbsp;mineral wool, XPS, reinforcement of&nbsp;insulation, plastering of&nbsp;the facade, priming for the application of&nbsp;decorative plaster. The installation of&nbsp;decorative elements on&nbsp;the facade has begun. Work has begun and is&nbsp;continuing on&nbsp;the installation of&nbsp;facade lighting&nbsp;&mdash; laying facade lighting cables, installing brackets for lighting fixtures. &#8203;&#8203;- Installation of&nbsp;engineering systems Ventilation ducts have been ordered and delivered. Metal ventilation boxes are being manufactured. &#8203;&#8203;- Glazing on&nbsp;the 10th floor. Metal trusses have been manufactured and are being installed. Metal columns are being manufactured. &#8203;&#8203;- Elevator installation Work is&nbsp;underway on&nbsp;the installation of&nbsp;elevator equipment. &mdash;&nbsp;Work on&nbsp;the infrastructure building Monolithic sidewalls are being installed on&nbsp;the roof. Engineering shafts and elevator shafts have been laid on&nbsp;the roof. Monolithic shaft belts are being installed. Plastering work on&nbsp;the facade has begun and is&nbsp;continuing.\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/#website\",\"url\":\"https:\/\/wyndhamgrandbatumigonio.com\/\",\"name\":\"Wyndham Grand Batumi Gonio\",\"description\":\"The benefits of investing in a brand from the world&#039;s leading hotel chain Wyndham Grand\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/wyndhamgrandbatumigonio.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Monthly construction report Wyndham Grand Batumi Gonio. Aqua November 2025 November saw dynamic progress on&nbsp;all fronts of&nbsp;the project: from the construction of&nbsp;monolithic structures to&nbsp;the detailed design of&nbsp;facades and engineering systems. Dozens of&nbsp;processes are being carried out simultaneously on&nbsp;the sites, which allows us&nbsp;to&nbsp;maintain a&nbsp;high pace. &mdash;&nbsp;Monolithic works The excavation for the entrance group has been completed. Monolithic works on&nbsp;the construction of&nbsp;the foundation and columns of&nbsp;the entrance group have begun and are continuing. The fire reservoir has been constructed. &mdash;&nbsp;Masonry works Ceramic block masonry has been completed on&nbsp;the 1st floor. &mdash;&nbsp;Works on&nbsp;balconies Work continues: installation of&nbsp;upper waterproofing coating, laying of&nbsp;porcelain stoneware on&nbsp;balconies, cladding of&nbsp;the ceiling with concrete panels (5 floors), reinforcement of&nbsp;the ceiling (6 floors), application of&nbsp;decorative plaster to&nbsp;the walls (6 floors), application of&nbsp;decorative plaster to&nbsp;the ceiling (6 floors). &#8203;&#8203;- Facade work Work continues on&nbsp;the installation of&nbsp;mineral wool, XPS, reinforcement of&nbsp;insulation, plastering of&nbsp;the facade, priming for the application of&nbsp;decorative plaster. The installation of&nbsp;decorative elements on&nbsp;the facade has begun. Work has begun and is&nbsp;continuing on&nbsp;the installation of&nbsp;facade lighting&nbsp;&mdash; laying facade lighting cables, installing brackets for lighting fixtures. &#8203;&#8203;- Installation of&nbsp;engineering systems Ventilation ducts have been ordered and delivered. Metal ventilation boxes are being manufactured. &#8203;&#8203;- Glazing on&nbsp;the 10th floor. Metal trusses have been manufactured and are being installed. Metal columns are being manufactured. &#8203;&#8203;- Elevator installation Work is&nbsp;underway on&nbsp;the installation of&nbsp;elevator equipment. &mdash;&nbsp;Work on&nbsp;the infrastructure building Monolithic sidewalls are being installed on&nbsp;the roof. Engineering shafts and elevator shafts have been laid on&nbsp;the roof. Monolithic shaft belts are being installed. Plastering work on&nbsp;the facade has begun and is&nbsp;continuing. &#8211; Wyndham Grand Batumi Gonio","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-aqua-november-2025-november-saw-dynamic-progress-on-all-fronts-of-the-project-from-the-construction-of-monolithic-structures-to\/","og_locale":"en_US","og_type":"article","og_title":"Monthly construction report Wyndham Grand Batumi Gonio. Aqua November 2025 November saw dynamic progress on&nbsp;all fronts of&nbsp;the project: from the construction of&nbsp;monolithic structures to&nbsp;the detailed design of&nbsp;facades and engineering systems. Dozens of&nbsp;processes are being carried out simultaneously on&nbsp;the sites, which allows us&nbsp;to&nbsp;maintain a&nbsp;high pace. &mdash;&nbsp;Monolithic works The excavation for the entrance group has been completed. Monolithic works on&nbsp;the construction of&nbsp;the foundation and columns of&nbsp;the entrance group have begun and are continuing. The fire reservoir has been constructed. &mdash;&nbsp;Masonry works Ceramic block masonry has been completed on&nbsp;the 1st floor. &mdash;&nbsp;Works on&nbsp;balconies Work continues: installation of&nbsp;upper waterproofing coating, laying of&nbsp;porcelain stoneware on&nbsp;balconies, cladding of&nbsp;the ceiling with concrete panels (5 floors), reinforcement of&nbsp;the ceiling (6 floors), application of&nbsp;decorative plaster to&nbsp;the walls (6 floors), application of&nbsp;decorative plaster to&nbsp;the ceiling (6 floors). &#8203;&#8203;- Facade work Work continues on&nbsp;the installation of&nbsp;mineral wool, XPS, reinforcement of&nbsp;insulation, plastering of&nbsp;the facade, priming for the application of&nbsp;decorative plaster. The installation of&nbsp;decorative elements on&nbsp;the facade has begun. Work has begun and is&nbsp;continuing on&nbsp;the installation of&nbsp;facade lighting&nbsp;&mdash; laying facade lighting cables, installing brackets for lighting fixtures. &#8203;&#8203;- Installation of&nbsp;engineering systems Ventilation ducts have been ordered and delivered. Metal ventilation boxes are being manufactured. &#8203;&#8203;- Glazing on&nbsp;the 10th floor. Metal trusses have been manufactured and are being installed. Metal columns are being manufactured. &#8203;&#8203;- Elevator installation Work is&nbsp;underway on&nbsp;the installation of&nbsp;elevator equipment. &mdash;&nbsp;Work on&nbsp;the infrastructure building Monolithic sidewalls are being installed on&nbsp;the roof. Engineering shafts and elevator shafts have been laid on&nbsp;the roof. Monolithic shaft belts are being installed. Plastering work on&nbsp;the facade has begun and is&nbsp;continuing. &#8211; Wyndham Grand Batumi Gonio","og_url":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-aqua-november-2025-november-saw-dynamic-progress-on-all-fronts-of-the-project-from-the-construction-of-monolithic-structures-to\/","og_site_name":"Wyndham Grand Batumi Gonio","article_modified_time":"2025-12-10T00:04:56+00:00","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-aqua-november-2025-november-saw-dynamic-progress-on-all-fronts-of-the-project-from-the-construction-of-monolithic-structures-to\/","url":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-aqua-november-2025-november-saw-dynamic-progress-on-all-fronts-of-the-project-from-the-construction-of-monolithic-structures-to\/","name":"Monthly construction report Wyndham Grand Batumi Gonio. Aqua November 2025 November saw dynamic progress on&nbsp;all fronts of&nbsp;the project: from the construction of&nbsp;monolithic structures to&nbsp;the detailed design of&nbsp;facades and engineering systems. Dozens of&nbsp;processes are being carried out simultaneously on&nbsp;the sites, which allows us&nbsp;to&nbsp;maintain a&nbsp;high pace. &mdash;&nbsp;Monolithic works The excavation for the entrance group has been completed. Monolithic works on&nbsp;the construction of&nbsp;the foundation and columns of&nbsp;the entrance group have begun and are continuing. The fire reservoir has been constructed. &mdash;&nbsp;Masonry works Ceramic block masonry has been completed on&nbsp;the 1st floor. &mdash;&nbsp;Works on&nbsp;balconies Work continues: installation of&nbsp;upper waterproofing coating, laying of&nbsp;porcelain stoneware on&nbsp;balconies, cladding of&nbsp;the ceiling with concrete panels (5 floors), reinforcement of&nbsp;the ceiling (6 floors), application of&nbsp;decorative plaster to&nbsp;the walls (6 floors), application of&nbsp;decorative plaster to&nbsp;the ceiling (6 floors). &#8203;&#8203;- Facade work Work continues on&nbsp;the installation of&nbsp;mineral wool, XPS, reinforcement of&nbsp;insulation, plastering of&nbsp;the facade, priming for the application of&nbsp;decorative plaster. The installation of&nbsp;decorative elements on&nbsp;the facade has begun. Work has begun and is&nbsp;continuing on&nbsp;the installation of&nbsp;facade lighting&nbsp;&mdash; laying facade lighting cables, installing brackets for lighting fixtures. &#8203;&#8203;- Installation of&nbsp;engineering systems Ventilation ducts have been ordered and delivered. Metal ventilation boxes are being manufactured. &#8203;&#8203;- Glazing on&nbsp;the 10th floor. Metal trusses have been manufactured and are being installed. Metal columns are being manufactured. &#8203;&#8203;- Elevator installation Work is&nbsp;underway on&nbsp;the installation of&nbsp;elevator equipment. &mdash;&nbsp;Work on&nbsp;the infrastructure building Monolithic sidewalls are being installed on&nbsp;the roof. Engineering shafts and elevator shafts have been laid on&nbsp;the roof. Monolithic shaft belts are being installed. Plastering work on&nbsp;the facade has begun and is&nbsp;continuing. &#8211; Wyndham Grand Batumi Gonio","isPartOf":{"@id":"https:\/\/wyndhamgrandbatumigonio.com\/#website"},"datePublished":"2025-12-09T16:00:46+00:00","dateModified":"2025-12-10T00:04:56+00:00","breadcrumb":{"@id":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-aqua-november-2025-november-saw-dynamic-progress-on-all-fronts-of-the-project-from-the-construction-of-monolithic-structures-to\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-aqua-november-2025-november-saw-dynamic-progress-on-all-fronts-of-the-project-from-the-construction-of-monolithic-structures-to\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-aqua-november-2025-november-saw-dynamic-progress-on-all-fronts-of-the-project-from-the-construction-of-monolithic-structures-to\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430","item":"https:\/\/wyndhamgrandbatumigonio.com\/en\/"},{"@type":"ListItem","position":2,"name":"Monthly construction report Wyndham Grand Batumi Gonio. Aqua November 2025 November saw dynamic progress on&nbsp;all fronts of&nbsp;the project: from the construction of&nbsp;monolithic structures to&nbsp;the detailed design of&nbsp;facades and engineering systems. Dozens of&nbsp;processes are being carried out simultaneously on&nbsp;the sites, which allows us&nbsp;to&nbsp;maintain a&nbsp;high pace. &mdash;&nbsp;Monolithic works The excavation for the entrance group has been completed. Monolithic works on&nbsp;the construction of&nbsp;the foundation and columns of&nbsp;the entrance group have begun and are continuing. The fire reservoir has been constructed. &mdash;&nbsp;Masonry works Ceramic block masonry has been completed on&nbsp;the 1st floor. &mdash;&nbsp;Works on&nbsp;balconies Work continues: installation of&nbsp;upper waterproofing coating, laying of&nbsp;porcelain stoneware on&nbsp;balconies, cladding of&nbsp;the ceiling with concrete panels (5 floors), reinforcement of&nbsp;the ceiling (6 floors), application of&nbsp;decorative plaster to&nbsp;the walls (6 floors), application of&nbsp;decorative plaster to&nbsp;the ceiling (6 floors). &#8203;&#8203;- Facade work Work continues on&nbsp;the installation of&nbsp;mineral wool, XPS, reinforcement of&nbsp;insulation, plastering of&nbsp;the facade, priming for the application of&nbsp;decorative plaster. The installation of&nbsp;decorative elements on&nbsp;the facade has begun. Work has begun and is&nbsp;continuing on&nbsp;the installation of&nbsp;facade lighting&nbsp;&mdash; laying facade lighting cables, installing brackets for lighting fixtures. &#8203;&#8203;- Installation of&nbsp;engineering systems Ventilation ducts have been ordered and delivered. Metal ventilation boxes are being manufactured. &#8203;&#8203;- Glazing on&nbsp;the 10th floor. Metal trusses have been manufactured and are being installed. Metal columns are being manufactured. &#8203;&#8203;- Elevator installation Work is&nbsp;underway on&nbsp;the installation of&nbsp;elevator equipment. &mdash;&nbsp;Work on&nbsp;the infrastructure building Monolithic sidewalls are being installed on&nbsp;the roof. Engineering shafts and elevator shafts have been laid on&nbsp;the roof. Monolithic shaft belts are being installed. Plastering work on&nbsp;the facade has begun and is&nbsp;continuing."}]},{"@type":"WebSite","@id":"https:\/\/wyndhamgrandbatumigonio.com\/#website","url":"https:\/\/wyndhamgrandbatumigonio.com\/","name":"Wyndham Grand Batumi Gonio","description":"The benefits of investing in a brand from the world&#039;s leading hotel chain Wyndham Grand","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/wyndhamgrandbatumigonio.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/news\/44293","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/types\/news"}],"wp:attachment":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/media?parent=44293"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}