{"id":44301,"date":"2025-12-09T20:10:45","date_gmt":"2025-12-09T16:10:45","guid":{"rendered":"https:\/\/wyndhamgrandbatumigonio.com\/?post_type=news&#038;p=44301"},"modified":"2025-12-10T04:21:48","modified_gmt":"2025-12-10T00:21:48","slug":"monthly-construction-report-wyndham-grand-batumi-gonio-family-club-november-2025-in-november-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-constructi","status":"publish","type":"news","link":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-family-club-november-2025-in-november-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-constructi\/","title":{"rendered":"<b>Monthly construction report<br \/> Wyndham Grand Batumi Gonio. Family Club<br \/> November 2025<b> <p>In&nbsp;November 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project.<br \/> Block A<br \/> &mdash;&nbsp;Work is&nbsp;being carried out on&nbsp;the roof to&nbsp;install a&nbsp;PVC membrane and roof flashings.<br \/> &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the terraces to&nbsp;install the upper waterproofing coating and the final layer of&nbsp;porcelain stoneware.<br \/> &mdash;&nbsp;Work continues on&nbsp;the balconies on&nbsp;floors 1&ndash;4 to&nbsp;tile the floors with porcelain stoneware.<br \/> &mdash;&nbsp;Facade work continues: installation of&nbsp;mineral wool on&nbsp;balconies and facades, plastering work outside balconies, reinforcement for decorative plaster application, reinforcement and plastering on&nbsp;mineral wool and XPS on&nbsp;facades and balconies, priming for decorative plaster.<br \/> &mdash;&nbsp;Work continues on&nbsp;the installation of&nbsp;clinker tiles on&nbsp;the facade and slopes.<br \/> &mdash;&nbsp;Decorative elements of&nbsp;the crowning cornice have been installed.<br \/> &mdash;&nbsp;Metal frames for decorative elements on&nbsp;the 1st floor have been manufactured and installed, and the frames are being clad.<br \/> &mdash;&nbsp;Cables are being laid for the installation of&nbsp;facade lighting.<\/p> <p>Block B<br \/> &mdash;&nbsp;Work has been completed on&nbsp;the terraces on&nbsp;the 5th floor and balconies on&nbsp;the <nobr>2nd-4th<\/nobr> floors: installation of&nbsp;lower waterproofing coating, laying of&nbsp;storm sewer pipes, installation of&nbsp;drains.<br \/> &mdash;&nbsp;Work is&nbsp;underway on&nbsp;cladding the ceilings with concrete panels on&nbsp;the balconies on&nbsp;the <nobr>2nd-4th<\/nobr> floors.<br \/> &mdash;&nbsp;Metal frames for decorative elements on&nbsp;the 1st floor have been manufactured and installed, and cladding of&nbsp;the frames is&nbsp;underway.<br \/> &mdash;&nbsp;Facade work continues: installation of&nbsp;mineral wool (facade, balconies) and XPS (terraces), plastering, reinforcement for decorative plaster application, reinforcement for mineral wool and XPS.<br \/> &mdash;&nbsp;Installation of&nbsp;decorative elements of&nbsp;the crowning cornice has begun and is&nbsp;continuing.<br \/> &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;clinker tiles on&nbsp;the facade and slopes.<br \/> &mdash;&nbsp;Stone flashings are being installed on&nbsp;the windows and slopes are being constructed on&nbsp;the windows.<\/p>"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/wyndhamgrandbatumigonio.com\/wp-admin\/edit.php?post_type=news\"><\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"template":"","class_list":["post-44301","news","type-news","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Monthly construction report Wyndham Grand Batumi Gonio. Family Club November 2025 In&nbsp;November 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Block A &mdash;&nbsp;Work is&nbsp;being carried out on&nbsp;the roof to&nbsp;install a&nbsp;PVC membrane and roof flashings. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the terraces to&nbsp;install the upper waterproofing coating and the final layer of&nbsp;porcelain stoneware. &mdash;&nbsp;Work continues on&nbsp;the balconies on&nbsp;floors 1&ndash;4 to&nbsp;tile the floors with porcelain stoneware. &mdash;&nbsp;Facade work continues: installation of&nbsp;mineral wool on&nbsp;balconies and facades, plastering work outside balconies, reinforcement for decorative plaster application, reinforcement and plastering on&nbsp;mineral wool and XPS on&nbsp;facades and balconies, priming for decorative plaster. &mdash;&nbsp;Work continues on&nbsp;the installation of&nbsp;clinker tiles on&nbsp;the facade and slopes. &mdash;&nbsp;Decorative elements of&nbsp;the crowning cornice have been installed. &mdash;&nbsp;Metal frames for decorative elements on&nbsp;the 1st floor have been manufactured and installed, and the frames are being clad. &mdash;&nbsp;Cables are being laid for the installation of&nbsp;facade lighting. Block B &mdash;&nbsp;Work has been completed on&nbsp;the terraces on&nbsp;the 5th floor and balconies on&nbsp;the 2nd-4th floors: installation of&nbsp;lower waterproofing coating, laying of&nbsp;storm sewer pipes, installation of&nbsp;drains. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;cladding the ceilings with concrete panels on&nbsp;the balconies on&nbsp;the 2nd-4th floors. &mdash;&nbsp;Metal frames for decorative elements on&nbsp;the 1st floor have been manufactured and installed, and cladding of&nbsp;the frames is&nbsp;underway. &mdash;&nbsp;Facade work continues: installation of&nbsp;mineral wool (facade, balconies) and XPS (terraces), plastering, reinforcement for decorative plaster application, reinforcement for mineral wool and XPS. &mdash;&nbsp;Installation of&nbsp;decorative elements of&nbsp;the crowning cornice has begun and is&nbsp;continuing. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;clinker tiles on&nbsp;the facade and slopes. &mdash;&nbsp;Stone flashings are being installed on&nbsp;the windows and slopes are being constructed on&nbsp;the windows. &#8211; Wyndham Grand Batumi Gonio<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-family-club-november-2025-in-november-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-constructi\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Monthly construction report Wyndham Grand Batumi Gonio. Family Club November 2025 In&nbsp;November 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Block A &mdash;&nbsp;Work is&nbsp;being carried out on&nbsp;the roof to&nbsp;install a&nbsp;PVC membrane and roof flashings. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the terraces to&nbsp;install the upper waterproofing coating and the final layer of&nbsp;porcelain stoneware. &mdash;&nbsp;Work continues on&nbsp;the balconies on&nbsp;floors 1&ndash;4 to&nbsp;tile the floors with porcelain stoneware. &mdash;&nbsp;Facade work continues: installation of&nbsp;mineral wool on&nbsp;balconies and facades, plastering work outside balconies, reinforcement for decorative plaster application, reinforcement and plastering on&nbsp;mineral wool and XPS on&nbsp;facades and balconies, priming for decorative plaster. &mdash;&nbsp;Work continues on&nbsp;the installation of&nbsp;clinker tiles on&nbsp;the facade and slopes. &mdash;&nbsp;Decorative elements of&nbsp;the crowning cornice have been installed. &mdash;&nbsp;Metal frames for decorative elements on&nbsp;the 1st floor have been manufactured and installed, and the frames are being clad. &mdash;&nbsp;Cables are being laid for the installation of&nbsp;facade lighting. Block B &mdash;&nbsp;Work has been completed on&nbsp;the terraces on&nbsp;the 5th floor and balconies on&nbsp;the 2nd-4th floors: installation of&nbsp;lower waterproofing coating, laying of&nbsp;storm sewer pipes, installation of&nbsp;drains. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;cladding the ceilings with concrete panels on&nbsp;the balconies on&nbsp;the 2nd-4th floors. &mdash;&nbsp;Metal frames for decorative elements on&nbsp;the 1st floor have been manufactured and installed, and cladding of&nbsp;the frames is&nbsp;underway. &mdash;&nbsp;Facade work continues: installation of&nbsp;mineral wool (facade, balconies) and XPS (terraces), plastering, reinforcement for decorative plaster application, reinforcement for mineral wool and XPS. &mdash;&nbsp;Installation of&nbsp;decorative elements of&nbsp;the crowning cornice has begun and is&nbsp;continuing. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;clinker tiles on&nbsp;the facade and slopes. &mdash;&nbsp;Stone flashings are being installed on&nbsp;the windows and slopes are being constructed on&nbsp;the windows. &#8211; Wyndham Grand Batumi Gonio\" \/>\n<meta property=\"og:url\" content=\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-family-club-november-2025-in-november-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-constructi\/\" \/>\n<meta property=\"og:site_name\" content=\"Wyndham Grand Batumi Gonio\" \/>\n<meta property=\"article:modified_time\" content=\"2025-12-10T00:21:48+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-family-club-november-2025-in-november-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-constructi\/\",\"url\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-family-club-november-2025-in-november-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-constructi\/\",\"name\":\"Monthly construction report Wyndham Grand Batumi Gonio. Family Club November 2025 In&nbsp;November 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Block A &mdash;&nbsp;Work is&nbsp;being carried out on&nbsp;the roof to&nbsp;install a&nbsp;PVC membrane and roof flashings. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the terraces to&nbsp;install the upper waterproofing coating and the final layer of&nbsp;porcelain stoneware. &mdash;&nbsp;Work continues on&nbsp;the balconies on&nbsp;floors 1&ndash;4 to&nbsp;tile the floors with porcelain stoneware. &mdash;&nbsp;Facade work continues: installation of&nbsp;mineral wool on&nbsp;balconies and facades, plastering work outside balconies, reinforcement for decorative plaster application, reinforcement and plastering on&nbsp;mineral wool and XPS on&nbsp;facades and balconies, priming for decorative plaster. &mdash;&nbsp;Work continues on&nbsp;the installation of&nbsp;clinker tiles on&nbsp;the facade and slopes. &mdash;&nbsp;Decorative elements of&nbsp;the crowning cornice have been installed. &mdash;&nbsp;Metal frames for decorative elements on&nbsp;the 1st floor have been manufactured and installed, and the frames are being clad. &mdash;&nbsp;Cables are being laid for the installation of&nbsp;facade lighting. Block B &mdash;&nbsp;Work has been completed on&nbsp;the terraces on&nbsp;the 5th floor and balconies on&nbsp;the 2nd-4th floors: installation of&nbsp;lower waterproofing coating, laying of&nbsp;storm sewer pipes, installation of&nbsp;drains. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;cladding the ceilings with concrete panels on&nbsp;the balconies on&nbsp;the 2nd-4th floors. &mdash;&nbsp;Metal frames for decorative elements on&nbsp;the 1st floor have been manufactured and installed, and cladding of&nbsp;the frames is&nbsp;underway. &mdash;&nbsp;Facade work continues: installation of&nbsp;mineral wool (facade, balconies) and XPS (terraces), plastering, reinforcement for decorative plaster application, reinforcement for mineral wool and XPS. &mdash;&nbsp;Installation of&nbsp;decorative elements of&nbsp;the crowning cornice has begun and is&nbsp;continuing. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;clinker tiles on&nbsp;the facade and slopes. &mdash;&nbsp;Stone flashings are being installed on&nbsp;the windows and slopes are being constructed on&nbsp;the windows. &#8211; Wyndham Grand Batumi Gonio\",\"isPartOf\":{\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/#website\"},\"datePublished\":\"2025-12-09T16:10:45+00:00\",\"dateModified\":\"2025-12-10T00:21:48+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-family-club-november-2025-in-november-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-constructi\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-family-club-november-2025-in-november-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-constructi\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-family-club-november-2025-in-november-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-constructi\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430\",\"item\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Monthly construction report Wyndham Grand Batumi Gonio. Family Club November 2025 In&nbsp;November 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Block A &mdash;&nbsp;Work is&nbsp;being carried out on&nbsp;the roof to&nbsp;install a&nbsp;PVC membrane and roof flashings. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the terraces to&nbsp;install the upper waterproofing coating and the final layer of&nbsp;porcelain stoneware. &mdash;&nbsp;Work continues on&nbsp;the balconies on&nbsp;floors 1&ndash;4 to&nbsp;tile the floors with porcelain stoneware. &mdash;&nbsp;Facade work continues: installation of&nbsp;mineral wool on&nbsp;balconies and facades, plastering work outside balconies, reinforcement for decorative plaster application, reinforcement and plastering on&nbsp;mineral wool and XPS on&nbsp;facades and balconies, priming for decorative plaster. &mdash;&nbsp;Work continues on&nbsp;the installation of&nbsp;clinker tiles on&nbsp;the facade and slopes. &mdash;&nbsp;Decorative elements of&nbsp;the crowning cornice have been installed. &mdash;&nbsp;Metal frames for decorative elements on&nbsp;the 1st floor have been manufactured and installed, and the frames are being clad. &mdash;&nbsp;Cables are being laid for the installation of&nbsp;facade lighting. Block B &mdash;&nbsp;Work has been completed on&nbsp;the terraces on&nbsp;the 5th floor and balconies on&nbsp;the 2nd-4th floors: installation of&nbsp;lower waterproofing coating, laying of&nbsp;storm sewer pipes, installation of&nbsp;drains. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;cladding the ceilings with concrete panels on&nbsp;the balconies on&nbsp;the 2nd-4th floors. &mdash;&nbsp;Metal frames for decorative elements on&nbsp;the 1st floor have been manufactured and installed, and cladding of&nbsp;the frames is&nbsp;underway. &mdash;&nbsp;Facade work continues: installation of&nbsp;mineral wool (facade, balconies) and XPS (terraces), plastering, reinforcement for decorative plaster application, reinforcement for mineral wool and XPS. &mdash;&nbsp;Installation of&nbsp;decorative elements of&nbsp;the crowning cornice has begun and is&nbsp;continuing. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;clinker tiles on&nbsp;the facade and slopes. &mdash;&nbsp;Stone flashings are being installed on&nbsp;the windows and slopes are being constructed on&nbsp;the windows.\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/#website\",\"url\":\"https:\/\/wyndhamgrandbatumigonio.com\/\",\"name\":\"Wyndham Grand Batumi Gonio\",\"description\":\"The benefits of investing in a brand from the world&#039;s leading hotel chain Wyndham Grand\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/wyndhamgrandbatumigonio.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Monthly construction report Wyndham Grand Batumi Gonio. Family Club November 2025 In&nbsp;November 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Block A &mdash;&nbsp;Work is&nbsp;being carried out on&nbsp;the roof to&nbsp;install a&nbsp;PVC membrane and roof flashings. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the terraces to&nbsp;install the upper waterproofing coating and the final layer of&nbsp;porcelain stoneware. &mdash;&nbsp;Work continues on&nbsp;the balconies on&nbsp;floors 1&ndash;4 to&nbsp;tile the floors with porcelain stoneware. &mdash;&nbsp;Facade work continues: installation of&nbsp;mineral wool on&nbsp;balconies and facades, plastering work outside balconies, reinforcement for decorative plaster application, reinforcement and plastering on&nbsp;mineral wool and XPS on&nbsp;facades and balconies, priming for decorative plaster. &mdash;&nbsp;Work continues on&nbsp;the installation of&nbsp;clinker tiles on&nbsp;the facade and slopes. &mdash;&nbsp;Decorative elements of&nbsp;the crowning cornice have been installed. &mdash;&nbsp;Metal frames for decorative elements on&nbsp;the 1st floor have been manufactured and installed, and the frames are being clad. &mdash;&nbsp;Cables are being laid for the installation of&nbsp;facade lighting. Block B &mdash;&nbsp;Work has been completed on&nbsp;the terraces on&nbsp;the 5th floor and balconies on&nbsp;the 2nd-4th floors: installation of&nbsp;lower waterproofing coating, laying of&nbsp;storm sewer pipes, installation of&nbsp;drains. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;cladding the ceilings with concrete panels on&nbsp;the balconies on&nbsp;the 2nd-4th floors. &mdash;&nbsp;Metal frames for decorative elements on&nbsp;the 1st floor have been manufactured and installed, and cladding of&nbsp;the frames is&nbsp;underway. &mdash;&nbsp;Facade work continues: installation of&nbsp;mineral wool (facade, balconies) and XPS (terraces), plastering, reinforcement for decorative plaster application, reinforcement for mineral wool and XPS. &mdash;&nbsp;Installation of&nbsp;decorative elements of&nbsp;the crowning cornice has begun and is&nbsp;continuing. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;clinker tiles on&nbsp;the facade and slopes. &mdash;&nbsp;Stone flashings are being installed on&nbsp;the windows and slopes are being constructed on&nbsp;the windows. &#8211; Wyndham Grand Batumi Gonio","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-family-club-november-2025-in-november-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-constructi\/","og_locale":"en_US","og_type":"article","og_title":"Monthly construction report Wyndham Grand Batumi Gonio. Family Club November 2025 In&nbsp;November 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Block A &mdash;&nbsp;Work is&nbsp;being carried out on&nbsp;the roof to&nbsp;install a&nbsp;PVC membrane and roof flashings. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the terraces to&nbsp;install the upper waterproofing coating and the final layer of&nbsp;porcelain stoneware. &mdash;&nbsp;Work continues on&nbsp;the balconies on&nbsp;floors 1&ndash;4 to&nbsp;tile the floors with porcelain stoneware. &mdash;&nbsp;Facade work continues: installation of&nbsp;mineral wool on&nbsp;balconies and facades, plastering work outside balconies, reinforcement for decorative plaster application, reinforcement and plastering on&nbsp;mineral wool and XPS on&nbsp;facades and balconies, priming for decorative plaster. &mdash;&nbsp;Work continues on&nbsp;the installation of&nbsp;clinker tiles on&nbsp;the facade and slopes. &mdash;&nbsp;Decorative elements of&nbsp;the crowning cornice have been installed. &mdash;&nbsp;Metal frames for decorative elements on&nbsp;the 1st floor have been manufactured and installed, and the frames are being clad. &mdash;&nbsp;Cables are being laid for the installation of&nbsp;facade lighting. Block B &mdash;&nbsp;Work has been completed on&nbsp;the terraces on&nbsp;the 5th floor and balconies on&nbsp;the 2nd-4th floors: installation of&nbsp;lower waterproofing coating, laying of&nbsp;storm sewer pipes, installation of&nbsp;drains. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;cladding the ceilings with concrete panels on&nbsp;the balconies on&nbsp;the 2nd-4th floors. &mdash;&nbsp;Metal frames for decorative elements on&nbsp;the 1st floor have been manufactured and installed, and cladding of&nbsp;the frames is&nbsp;underway. &mdash;&nbsp;Facade work continues: installation of&nbsp;mineral wool (facade, balconies) and XPS (terraces), plastering, reinforcement for decorative plaster application, reinforcement for mineral wool and XPS. &mdash;&nbsp;Installation of&nbsp;decorative elements of&nbsp;the crowning cornice has begun and is&nbsp;continuing. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;clinker tiles on&nbsp;the facade and slopes. &mdash;&nbsp;Stone flashings are being installed on&nbsp;the windows and slopes are being constructed on&nbsp;the windows. &#8211; Wyndham Grand Batumi Gonio","og_url":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-family-club-november-2025-in-november-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-constructi\/","og_site_name":"Wyndham Grand Batumi Gonio","article_modified_time":"2025-12-10T00:21:48+00:00","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-family-club-november-2025-in-november-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-constructi\/","url":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-family-club-november-2025-in-november-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-constructi\/","name":"Monthly construction report Wyndham Grand Batumi Gonio. Family Club November 2025 In&nbsp;November 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Block A &mdash;&nbsp;Work is&nbsp;being carried out on&nbsp;the roof to&nbsp;install a&nbsp;PVC membrane and roof flashings. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the terraces to&nbsp;install the upper waterproofing coating and the final layer of&nbsp;porcelain stoneware. &mdash;&nbsp;Work continues on&nbsp;the balconies on&nbsp;floors 1&ndash;4 to&nbsp;tile the floors with porcelain stoneware. &mdash;&nbsp;Facade work continues: installation of&nbsp;mineral wool on&nbsp;balconies and facades, plastering work outside balconies, reinforcement for decorative plaster application, reinforcement and plastering on&nbsp;mineral wool and XPS on&nbsp;facades and balconies, priming for decorative plaster. &mdash;&nbsp;Work continues on&nbsp;the installation of&nbsp;clinker tiles on&nbsp;the facade and slopes. &mdash;&nbsp;Decorative elements of&nbsp;the crowning cornice have been installed. &mdash;&nbsp;Metal frames for decorative elements on&nbsp;the 1st floor have been manufactured and installed, and the frames are being clad. &mdash;&nbsp;Cables are being laid for the installation of&nbsp;facade lighting. Block B &mdash;&nbsp;Work has been completed on&nbsp;the terraces on&nbsp;the 5th floor and balconies on&nbsp;the 2nd-4th floors: installation of&nbsp;lower waterproofing coating, laying of&nbsp;storm sewer pipes, installation of&nbsp;drains. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;cladding the ceilings with concrete panels on&nbsp;the balconies on&nbsp;the 2nd-4th floors. &mdash;&nbsp;Metal frames for decorative elements on&nbsp;the 1st floor have been manufactured and installed, and cladding of&nbsp;the frames is&nbsp;underway. &mdash;&nbsp;Facade work continues: installation of&nbsp;mineral wool (facade, balconies) and XPS (terraces), plastering, reinforcement for decorative plaster application, reinforcement for mineral wool and XPS. &mdash;&nbsp;Installation of&nbsp;decorative elements of&nbsp;the crowning cornice has begun and is&nbsp;continuing. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;clinker tiles on&nbsp;the facade and slopes. &mdash;&nbsp;Stone flashings are being installed on&nbsp;the windows and slopes are being constructed on&nbsp;the windows. &#8211; Wyndham Grand Batumi Gonio","isPartOf":{"@id":"https:\/\/wyndhamgrandbatumigonio.com\/#website"},"datePublished":"2025-12-09T16:10:45+00:00","dateModified":"2025-12-10T00:21:48+00:00","breadcrumb":{"@id":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-family-club-november-2025-in-november-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-constructi\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-family-club-november-2025-in-november-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-constructi\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-family-club-november-2025-in-november-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-constructi\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430","item":"https:\/\/wyndhamgrandbatumigonio.com\/en\/"},{"@type":"ListItem","position":2,"name":"Monthly construction report Wyndham Grand Batumi Gonio. Family Club November 2025 In&nbsp;November 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Block A &mdash;&nbsp;Work is&nbsp;being carried out on&nbsp;the roof to&nbsp;install a&nbsp;PVC membrane and roof flashings. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the terraces to&nbsp;install the upper waterproofing coating and the final layer of&nbsp;porcelain stoneware. &mdash;&nbsp;Work continues on&nbsp;the balconies on&nbsp;floors 1&ndash;4 to&nbsp;tile the floors with porcelain stoneware. &mdash;&nbsp;Facade work continues: installation of&nbsp;mineral wool on&nbsp;balconies and facades, plastering work outside balconies, reinforcement for decorative plaster application, reinforcement and plastering on&nbsp;mineral wool and XPS on&nbsp;facades and balconies, priming for decorative plaster. &mdash;&nbsp;Work continues on&nbsp;the installation of&nbsp;clinker tiles on&nbsp;the facade and slopes. &mdash;&nbsp;Decorative elements of&nbsp;the crowning cornice have been installed. &mdash;&nbsp;Metal frames for decorative elements on&nbsp;the 1st floor have been manufactured and installed, and the frames are being clad. &mdash;&nbsp;Cables are being laid for the installation of&nbsp;facade lighting. Block B &mdash;&nbsp;Work has been completed on&nbsp;the terraces on&nbsp;the 5th floor and balconies on&nbsp;the 2nd-4th floors: installation of&nbsp;lower waterproofing coating, laying of&nbsp;storm sewer pipes, installation of&nbsp;drains. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;cladding the ceilings with concrete panels on&nbsp;the balconies on&nbsp;the 2nd-4th floors. &mdash;&nbsp;Metal frames for decorative elements on&nbsp;the 1st floor have been manufactured and installed, and cladding of&nbsp;the frames is&nbsp;underway. &mdash;&nbsp;Facade work continues: installation of&nbsp;mineral wool (facade, balconies) and XPS (terraces), plastering, reinforcement for decorative plaster application, reinforcement for mineral wool and XPS. &mdash;&nbsp;Installation of&nbsp;decorative elements of&nbsp;the crowning cornice has begun and is&nbsp;continuing. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;clinker tiles on&nbsp;the facade and slopes. &mdash;&nbsp;Stone flashings are being installed on&nbsp;the windows and slopes are being constructed on&nbsp;the windows."}]},{"@type":"WebSite","@id":"https:\/\/wyndhamgrandbatumigonio.com\/#website","url":"https:\/\/wyndhamgrandbatumigonio.com\/","name":"Wyndham Grand Batumi Gonio","description":"The benefits of investing in a brand from the world&#039;s leading hotel chain Wyndham Grand","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/wyndhamgrandbatumigonio.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/news\/44301","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/types\/news"}],"wp:attachment":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/media?parent=44301"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}