{"id":44309,"date":"2025-12-09T20:30:26","date_gmt":"2025-12-09T16:30:26","guid":{"rendered":"https:\/\/wyndhamgrandbatumigonio.com\/?post_type=news&#038;p=44309"},"modified":"2025-12-10T04:46:00","modified_gmt":"2025-12-10T00:46:00","slug":"monthly-construction-report-wyndham-grand-batumi-gonio-riviera-november-2025-in-november-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-sites-monolithi","status":"publish","type":"news","link":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-riviera-november-2025-in-november-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-sites-monolithi\/","title":{"rendered":"<b>Monthly Construction Report<br \/> Wyndham Grand Batumi Gonio. Riviera<br \/> November 2025<b> <p>In&nbsp;November 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project.<br \/> Block A<br \/> &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;upper waterproofing on&nbsp;the balconies of&nbsp;the townhouses.<br \/> &mdash;&nbsp;Work is&nbsp;being completed on&nbsp;covering the chimney and drainage boxes with concrete panels.<\/p> <p>&mdash;&nbsp;Decorative facade elements have been ordered, delivered, and installed.<br \/> &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;a&nbsp;monolithic staircase railing.<br \/> &mdash;&nbsp;Work continues on&nbsp;the installation of&nbsp;mats and pipes for underfloor heating.<br \/> &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;electrical lighting and power supply in&nbsp;the townhouses, as&nbsp;well as&nbsp;the installation of&nbsp;facade lighting.<\/p> <p>Blocks B&nbsp;and C<br \/> &mdash;&nbsp;Work is&nbsp;underway on&nbsp;installing upper waterproofing on&nbsp;the balconies in&nbsp;the townhouses.<br \/> &mdash;&nbsp;Chimneys have been installed on&nbsp;Block C.<br \/> &mdash;&nbsp;Work is&nbsp;underway on&nbsp;installing plasterboard frames for interior partitions and covering the partition frames.<br \/> &#8203;&#8203;- Work has begun on&nbsp;the installation of&nbsp;mats and pipes for underfloor heating.<br \/> &#8203;&#8203;- Work is&nbsp;underway on&nbsp;the installation of&nbsp;electrical lighting and power supply in&nbsp;the townhouses.<\/p> <p>Block E<br \/> &mdash;&nbsp;Work has been completed on&nbsp;the installation of&nbsp;upper waterproofing on&nbsp;the balconies of&nbsp;the townhouses.<br \/> &mdash;&nbsp;Decorative facade elements have been ordered, delivered, and installation has begun.<br \/> &mdash;&nbsp;Work has been completed on&nbsp;the installation of&nbsp;mats and pipes for underfloor heating.<\/p> <p>Infrastructure building<br \/> &mdash;&nbsp;Membrane waterproofing has been installed on&nbsp;the roof.<br \/> &mdash;&nbsp;Facade work has been completed on&nbsp;the installation of&nbsp;mineral wool and reinforcement of&nbsp;mineral wool. Work is&nbsp;underway on&nbsp;priming before applying decorative plaster.<\/p> <p>Landscaping<br \/> The excavation for the pool has been completed. Monolithic work on&nbsp;the construction of&nbsp;the pool foundation has begun and is&nbsp;continuing.<\/p>"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/wyndhamgrandbatumigonio.com\/wp-admin\/edit.php?post_type=news\"><\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"template":"","class_list":["post-44309","news","type-news","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Monthly Construction Report Wyndham Grand Batumi Gonio. Riviera November 2025 In&nbsp;November 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Block A &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;upper waterproofing on&nbsp;the balconies of&nbsp;the townhouses. &mdash;&nbsp;Work is&nbsp;being completed on&nbsp;covering the chimney and drainage boxes with concrete panels. &mdash;&nbsp;Decorative facade elements have been ordered, delivered, and installed. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;a&nbsp;monolithic staircase railing. &mdash;&nbsp;Work continues on&nbsp;the installation of&nbsp;mats and pipes for underfloor heating. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;electrical lighting and power supply in&nbsp;the townhouses, as&nbsp;well as&nbsp;the installation of&nbsp;facade lighting. Blocks B&nbsp;and C &mdash;&nbsp;Work is&nbsp;underway on&nbsp;installing upper waterproofing on&nbsp;the balconies in&nbsp;the townhouses. &mdash;&nbsp;Chimneys have been installed on&nbsp;Block C. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;installing plasterboard frames for interior partitions and covering the partition frames. &#8203;&#8203;- Work has begun on&nbsp;the installation of&nbsp;mats and pipes for underfloor heating. &#8203;&#8203;- Work is&nbsp;underway on&nbsp;the installation of&nbsp;electrical lighting and power supply in&nbsp;the townhouses. Block E &mdash;&nbsp;Work has been completed on&nbsp;the installation of&nbsp;upper waterproofing on&nbsp;the balconies of&nbsp;the townhouses. &mdash;&nbsp;Decorative facade elements have been ordered, delivered, and installation has begun. &mdash;&nbsp;Work has been completed on&nbsp;the installation of&nbsp;mats and pipes for underfloor heating. Infrastructure building &mdash;&nbsp;Membrane waterproofing has been installed on&nbsp;the roof. &mdash;&nbsp;Facade work has been completed on&nbsp;the installation of&nbsp;mineral wool and reinforcement of&nbsp;mineral wool. Work is&nbsp;underway on&nbsp;priming before applying decorative plaster. Landscaping The excavation for the pool has been completed. Monolithic work on&nbsp;the construction of&nbsp;the pool foundation has begun and is&nbsp;continuing. &#8211; Wyndham Grand Batumi Gonio<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-riviera-november-2025-in-november-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-sites-monolithi\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Monthly Construction Report Wyndham Grand Batumi Gonio. Riviera November 2025 In&nbsp;November 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Block A &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;upper waterproofing on&nbsp;the balconies of&nbsp;the townhouses. &mdash;&nbsp;Work is&nbsp;being completed on&nbsp;covering the chimney and drainage boxes with concrete panels. &mdash;&nbsp;Decorative facade elements have been ordered, delivered, and installed. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;a&nbsp;monolithic staircase railing. &mdash;&nbsp;Work continues on&nbsp;the installation of&nbsp;mats and pipes for underfloor heating. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;electrical lighting and power supply in&nbsp;the townhouses, as&nbsp;well as&nbsp;the installation of&nbsp;facade lighting. Blocks B&nbsp;and C &mdash;&nbsp;Work is&nbsp;underway on&nbsp;installing upper waterproofing on&nbsp;the balconies in&nbsp;the townhouses. &mdash;&nbsp;Chimneys have been installed on&nbsp;Block C. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;installing plasterboard frames for interior partitions and covering the partition frames. &#8203;&#8203;- Work has begun on&nbsp;the installation of&nbsp;mats and pipes for underfloor heating. &#8203;&#8203;- Work is&nbsp;underway on&nbsp;the installation of&nbsp;electrical lighting and power supply in&nbsp;the townhouses. Block E &mdash;&nbsp;Work has been completed on&nbsp;the installation of&nbsp;upper waterproofing on&nbsp;the balconies of&nbsp;the townhouses. &mdash;&nbsp;Decorative facade elements have been ordered, delivered, and installation has begun. &mdash;&nbsp;Work has been completed on&nbsp;the installation of&nbsp;mats and pipes for underfloor heating. Infrastructure building &mdash;&nbsp;Membrane waterproofing has been installed on&nbsp;the roof. &mdash;&nbsp;Facade work has been completed on&nbsp;the installation of&nbsp;mineral wool and reinforcement of&nbsp;mineral wool. Work is&nbsp;underway on&nbsp;priming before applying decorative plaster. Landscaping The excavation for the pool has been completed. Monolithic work on&nbsp;the construction of&nbsp;the pool foundation has begun and is&nbsp;continuing. &#8211; Wyndham Grand Batumi Gonio\" \/>\n<meta property=\"og:url\" content=\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-riviera-november-2025-in-november-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-sites-monolithi\/\" \/>\n<meta property=\"og:site_name\" content=\"Wyndham Grand Batumi Gonio\" \/>\n<meta property=\"article:modified_time\" content=\"2025-12-10T00:46:00+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-riviera-november-2025-in-november-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-sites-monolithi\/\",\"url\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-riviera-november-2025-in-november-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-sites-monolithi\/\",\"name\":\"Monthly Construction Report Wyndham Grand Batumi Gonio. Riviera November 2025 In&nbsp;November 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Block A &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;upper waterproofing on&nbsp;the balconies of&nbsp;the townhouses. &mdash;&nbsp;Work is&nbsp;being completed on&nbsp;covering the chimney and drainage boxes with concrete panels. &mdash;&nbsp;Decorative facade elements have been ordered, delivered, and installed. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;a&nbsp;monolithic staircase railing. &mdash;&nbsp;Work continues on&nbsp;the installation of&nbsp;mats and pipes for underfloor heating. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;electrical lighting and power supply in&nbsp;the townhouses, as&nbsp;well as&nbsp;the installation of&nbsp;facade lighting. Blocks B&nbsp;and C &mdash;&nbsp;Work is&nbsp;underway on&nbsp;installing upper waterproofing on&nbsp;the balconies in&nbsp;the townhouses. &mdash;&nbsp;Chimneys have been installed on&nbsp;Block C. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;installing plasterboard frames for interior partitions and covering the partition frames. &#8203;&#8203;- Work has begun on&nbsp;the installation of&nbsp;mats and pipes for underfloor heating. &#8203;&#8203;- Work is&nbsp;underway on&nbsp;the installation of&nbsp;electrical lighting and power supply in&nbsp;the townhouses. Block E &mdash;&nbsp;Work has been completed on&nbsp;the installation of&nbsp;upper waterproofing on&nbsp;the balconies of&nbsp;the townhouses. &mdash;&nbsp;Decorative facade elements have been ordered, delivered, and installation has begun. &mdash;&nbsp;Work has been completed on&nbsp;the installation of&nbsp;mats and pipes for underfloor heating. Infrastructure building &mdash;&nbsp;Membrane waterproofing has been installed on&nbsp;the roof. &mdash;&nbsp;Facade work has been completed on&nbsp;the installation of&nbsp;mineral wool and reinforcement of&nbsp;mineral wool. Work is&nbsp;underway on&nbsp;priming before applying decorative plaster. Landscaping The excavation for the pool has been completed. Monolithic work on&nbsp;the construction of&nbsp;the pool foundation has begun and is&nbsp;continuing. &#8211; Wyndham Grand Batumi Gonio\",\"isPartOf\":{\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/#website\"},\"datePublished\":\"2025-12-09T16:30:26+00:00\",\"dateModified\":\"2025-12-10T00:46:00+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-riviera-november-2025-in-november-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-sites-monolithi\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-riviera-november-2025-in-november-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-sites-monolithi\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-riviera-november-2025-in-november-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-sites-monolithi\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430\",\"item\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Monthly Construction Report Wyndham Grand Batumi Gonio. Riviera November 2025 In&nbsp;November 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Block A &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;upper waterproofing on&nbsp;the balconies of&nbsp;the townhouses. &mdash;&nbsp;Work is&nbsp;being completed on&nbsp;covering the chimney and drainage boxes with concrete panels. &mdash;&nbsp;Decorative facade elements have been ordered, delivered, and installed. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;a&nbsp;monolithic staircase railing. &mdash;&nbsp;Work continues on&nbsp;the installation of&nbsp;mats and pipes for underfloor heating. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;electrical lighting and power supply in&nbsp;the townhouses, as&nbsp;well as&nbsp;the installation of&nbsp;facade lighting. Blocks B&nbsp;and C &mdash;&nbsp;Work is&nbsp;underway on&nbsp;installing upper waterproofing on&nbsp;the balconies in&nbsp;the townhouses. &mdash;&nbsp;Chimneys have been installed on&nbsp;Block C. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;installing plasterboard frames for interior partitions and covering the partition frames. &#8203;&#8203;- Work has begun on&nbsp;the installation of&nbsp;mats and pipes for underfloor heating. &#8203;&#8203;- Work is&nbsp;underway on&nbsp;the installation of&nbsp;electrical lighting and power supply in&nbsp;the townhouses. Block E &mdash;&nbsp;Work has been completed on&nbsp;the installation of&nbsp;upper waterproofing on&nbsp;the balconies of&nbsp;the townhouses. &mdash;&nbsp;Decorative facade elements have been ordered, delivered, and installation has begun. &mdash;&nbsp;Work has been completed on&nbsp;the installation of&nbsp;mats and pipes for underfloor heating. Infrastructure building &mdash;&nbsp;Membrane waterproofing has been installed on&nbsp;the roof. &mdash;&nbsp;Facade work has been completed on&nbsp;the installation of&nbsp;mineral wool and reinforcement of&nbsp;mineral wool. Work is&nbsp;underway on&nbsp;priming before applying decorative plaster. Landscaping The excavation for the pool has been completed. Monolithic work on&nbsp;the construction of&nbsp;the pool foundation has begun and is&nbsp;continuing.\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/#website\",\"url\":\"https:\/\/wyndhamgrandbatumigonio.com\/\",\"name\":\"Wyndham Grand Batumi Gonio\",\"description\":\"The benefits of investing in a brand from the world&#039;s leading hotel chain Wyndham Grand\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/wyndhamgrandbatumigonio.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Monthly Construction Report Wyndham Grand Batumi Gonio. Riviera November 2025 In&nbsp;November 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Block A &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;upper waterproofing on&nbsp;the balconies of&nbsp;the townhouses. &mdash;&nbsp;Work is&nbsp;being completed on&nbsp;covering the chimney and drainage boxes with concrete panels. &mdash;&nbsp;Decorative facade elements have been ordered, delivered, and installed. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;a&nbsp;monolithic staircase railing. &mdash;&nbsp;Work continues on&nbsp;the installation of&nbsp;mats and pipes for underfloor heating. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;electrical lighting and power supply in&nbsp;the townhouses, as&nbsp;well as&nbsp;the installation of&nbsp;facade lighting. Blocks B&nbsp;and C &mdash;&nbsp;Work is&nbsp;underway on&nbsp;installing upper waterproofing on&nbsp;the balconies in&nbsp;the townhouses. &mdash;&nbsp;Chimneys have been installed on&nbsp;Block C. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;installing plasterboard frames for interior partitions and covering the partition frames. &#8203;&#8203;- Work has begun on&nbsp;the installation of&nbsp;mats and pipes for underfloor heating. &#8203;&#8203;- Work is&nbsp;underway on&nbsp;the installation of&nbsp;electrical lighting and power supply in&nbsp;the townhouses. Block E &mdash;&nbsp;Work has been completed on&nbsp;the installation of&nbsp;upper waterproofing on&nbsp;the balconies of&nbsp;the townhouses. &mdash;&nbsp;Decorative facade elements have been ordered, delivered, and installation has begun. &mdash;&nbsp;Work has been completed on&nbsp;the installation of&nbsp;mats and pipes for underfloor heating. Infrastructure building &mdash;&nbsp;Membrane waterproofing has been installed on&nbsp;the roof. &mdash;&nbsp;Facade work has been completed on&nbsp;the installation of&nbsp;mineral wool and reinforcement of&nbsp;mineral wool. Work is&nbsp;underway on&nbsp;priming before applying decorative plaster. Landscaping The excavation for the pool has been completed. Monolithic work on&nbsp;the construction of&nbsp;the pool foundation has begun and is&nbsp;continuing. &#8211; Wyndham Grand Batumi Gonio","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-riviera-november-2025-in-november-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-sites-monolithi\/","og_locale":"en_US","og_type":"article","og_title":"Monthly Construction Report Wyndham Grand Batumi Gonio. Riviera November 2025 In&nbsp;November 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Block A &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;upper waterproofing on&nbsp;the balconies of&nbsp;the townhouses. &mdash;&nbsp;Work is&nbsp;being completed on&nbsp;covering the chimney and drainage boxes with concrete panels. &mdash;&nbsp;Decorative facade elements have been ordered, delivered, and installed. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;a&nbsp;monolithic staircase railing. &mdash;&nbsp;Work continues on&nbsp;the installation of&nbsp;mats and pipes for underfloor heating. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;electrical lighting and power supply in&nbsp;the townhouses, as&nbsp;well as&nbsp;the installation of&nbsp;facade lighting. Blocks B&nbsp;and C &mdash;&nbsp;Work is&nbsp;underway on&nbsp;installing upper waterproofing on&nbsp;the balconies in&nbsp;the townhouses. &mdash;&nbsp;Chimneys have been installed on&nbsp;Block C. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;installing plasterboard frames for interior partitions and covering the partition frames. &#8203;&#8203;- Work has begun on&nbsp;the installation of&nbsp;mats and pipes for underfloor heating. &#8203;&#8203;- Work is&nbsp;underway on&nbsp;the installation of&nbsp;electrical lighting and power supply in&nbsp;the townhouses. Block E &mdash;&nbsp;Work has been completed on&nbsp;the installation of&nbsp;upper waterproofing on&nbsp;the balconies of&nbsp;the townhouses. &mdash;&nbsp;Decorative facade elements have been ordered, delivered, and installation has begun. &mdash;&nbsp;Work has been completed on&nbsp;the installation of&nbsp;mats and pipes for underfloor heating. Infrastructure building &mdash;&nbsp;Membrane waterproofing has been installed on&nbsp;the roof. &mdash;&nbsp;Facade work has been completed on&nbsp;the installation of&nbsp;mineral wool and reinforcement of&nbsp;mineral wool. Work is&nbsp;underway on&nbsp;priming before applying decorative plaster. Landscaping The excavation for the pool has been completed. Monolithic work on&nbsp;the construction of&nbsp;the pool foundation has begun and is&nbsp;continuing. &#8211; Wyndham Grand Batumi Gonio","og_url":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-riviera-november-2025-in-november-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-sites-monolithi\/","og_site_name":"Wyndham Grand Batumi Gonio","article_modified_time":"2025-12-10T00:46:00+00:00","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-riviera-november-2025-in-november-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-sites-monolithi\/","url":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-riviera-november-2025-in-november-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-sites-monolithi\/","name":"Monthly Construction Report Wyndham Grand Batumi Gonio. Riviera November 2025 In&nbsp;November 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Block A &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;upper waterproofing on&nbsp;the balconies of&nbsp;the townhouses. &mdash;&nbsp;Work is&nbsp;being completed on&nbsp;covering the chimney and drainage boxes with concrete panels. &mdash;&nbsp;Decorative facade elements have been ordered, delivered, and installed. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;a&nbsp;monolithic staircase railing. &mdash;&nbsp;Work continues on&nbsp;the installation of&nbsp;mats and pipes for underfloor heating. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;electrical lighting and power supply in&nbsp;the townhouses, as&nbsp;well as&nbsp;the installation of&nbsp;facade lighting. Blocks B&nbsp;and C &mdash;&nbsp;Work is&nbsp;underway on&nbsp;installing upper waterproofing on&nbsp;the balconies in&nbsp;the townhouses. &mdash;&nbsp;Chimneys have been installed on&nbsp;Block C. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;installing plasterboard frames for interior partitions and covering the partition frames. &#8203;&#8203;- Work has begun on&nbsp;the installation of&nbsp;mats and pipes for underfloor heating. &#8203;&#8203;- Work is&nbsp;underway on&nbsp;the installation of&nbsp;electrical lighting and power supply in&nbsp;the townhouses. Block E &mdash;&nbsp;Work has been completed on&nbsp;the installation of&nbsp;upper waterproofing on&nbsp;the balconies of&nbsp;the townhouses. &mdash;&nbsp;Decorative facade elements have been ordered, delivered, and installation has begun. &mdash;&nbsp;Work has been completed on&nbsp;the installation of&nbsp;mats and pipes for underfloor heating. Infrastructure building &mdash;&nbsp;Membrane waterproofing has been installed on&nbsp;the roof. &mdash;&nbsp;Facade work has been completed on&nbsp;the installation of&nbsp;mineral wool and reinforcement of&nbsp;mineral wool. Work is&nbsp;underway on&nbsp;priming before applying decorative plaster. Landscaping The excavation for the pool has been completed. Monolithic work on&nbsp;the construction of&nbsp;the pool foundation has begun and is&nbsp;continuing. &#8211; Wyndham Grand Batumi Gonio","isPartOf":{"@id":"https:\/\/wyndhamgrandbatumigonio.com\/#website"},"datePublished":"2025-12-09T16:30:26+00:00","dateModified":"2025-12-10T00:46:00+00:00","breadcrumb":{"@id":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-riviera-november-2025-in-november-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-sites-monolithi\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-riviera-november-2025-in-november-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-sites-monolithi\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-wyndham-grand-batumi-gonio-riviera-november-2025-in-november-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-sites-monolithi\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430","item":"https:\/\/wyndhamgrandbatumigonio.com\/en\/"},{"@type":"ListItem","position":2,"name":"Monthly Construction Report Wyndham Grand Batumi Gonio. Riviera November 2025 In&nbsp;November 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Block A &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;upper waterproofing on&nbsp;the balconies of&nbsp;the townhouses. &mdash;&nbsp;Work is&nbsp;being completed on&nbsp;covering the chimney and drainage boxes with concrete panels. &mdash;&nbsp;Decorative facade elements have been ordered, delivered, and installed. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;a&nbsp;monolithic staircase railing. &mdash;&nbsp;Work continues on&nbsp;the installation of&nbsp;mats and pipes for underfloor heating. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;the installation of&nbsp;electrical lighting and power supply in&nbsp;the townhouses, as&nbsp;well as&nbsp;the installation of&nbsp;facade lighting. Blocks B&nbsp;and C &mdash;&nbsp;Work is&nbsp;underway on&nbsp;installing upper waterproofing on&nbsp;the balconies in&nbsp;the townhouses. &mdash;&nbsp;Chimneys have been installed on&nbsp;Block C. &mdash;&nbsp;Work is&nbsp;underway on&nbsp;installing plasterboard frames for interior partitions and covering the partition frames. &#8203;&#8203;- Work has begun on&nbsp;the installation of&nbsp;mats and pipes for underfloor heating. &#8203;&#8203;- Work is&nbsp;underway on&nbsp;the installation of&nbsp;electrical lighting and power supply in&nbsp;the townhouses. Block E &mdash;&nbsp;Work has been completed on&nbsp;the installation of&nbsp;upper waterproofing on&nbsp;the balconies of&nbsp;the townhouses. &mdash;&nbsp;Decorative facade elements have been ordered, delivered, and installation has begun. &mdash;&nbsp;Work has been completed on&nbsp;the installation of&nbsp;mats and pipes for underfloor heating. Infrastructure building &mdash;&nbsp;Membrane waterproofing has been installed on&nbsp;the roof. &mdash;&nbsp;Facade work has been completed on&nbsp;the installation of&nbsp;mineral wool and reinforcement of&nbsp;mineral wool. Work is&nbsp;underway on&nbsp;priming before applying decorative plaster. Landscaping The excavation for the pool has been completed. Monolithic work on&nbsp;the construction of&nbsp;the pool foundation has begun and is&nbsp;continuing."}]},{"@type":"WebSite","@id":"https:\/\/wyndhamgrandbatumigonio.com\/#website","url":"https:\/\/wyndhamgrandbatumigonio.com\/","name":"Wyndham Grand Batumi Gonio","description":"The benefits of investing in a brand from the world&#039;s leading hotel chain Wyndham Grand","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/wyndhamgrandbatumigonio.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/news\/44309","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/types\/news"}],"wp:attachment":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/media?parent=44309"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}