{"id":44963,"date":"2026-01-22T20:00:53","date_gmt":"2026-01-22T16:00:53","guid":{"rendered":"https:\/\/wyndhamgrandbatumigonio.com\/?post_type=news&#038;p=44963"},"modified":"2026-01-23T00:19:49","modified_gmt":"2026-01-22T20:19:49","slug":"monthly-construction-report-december-2025-wyndham-grand-batumi-gonio-aqua-in-december-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-sit","status":"publish","type":"news","link":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-december-2025-wyndham-grand-batumi-gonio-aqua-in-december-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-sit\/","title":{"rendered":"<b>Monthly Construction Report<br \/> December 2025. Wyndham Grand Batumi Gonio. Aqua<\/b> <p>In&nbsp;December 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project.<br \/> Wyndham Grand Batumi Gonio. Aqua<br \/> December saw dynamic progress on&nbsp;all fronts of&nbsp;the project: from the erection of&nbsp;monolithic structures to&nbsp;the detailed design of&nbsp;facades and engineering systems. Dozens of&nbsp;processes are being carried out simultaneously on&nbsp;the sites, which allows us&nbsp;to&nbsp;maintain a&nbsp;high pace.<br \/> &mdash;&nbsp;Monolithic work<br \/> Work has been completed on&nbsp;the entrance area, columns, and steps.<br \/> &mdash;&nbsp;Work on&nbsp;balconies<br \/> Work continues: installation of&nbsp;upper waterproofing coating, laying of&nbsp;porcelain stoneware on&nbsp;balconies, cladding of&nbsp;the ceiling with concrete panels (5 floors), reinforcement of&nbsp;the ceiling (6 floors), application of&nbsp;decorative plaster to&nbsp;the walls (6 floors), application of&nbsp;decorative plaster to&nbsp;the ceiling (6 floors), manufacture and installation of&nbsp;embedded parts for fences (2 floors).<br \/> &#8203;&#8203;- Facade work<br \/> Work continues on&nbsp;the installation of&nbsp;mineral wool, XPS, reinforcement of&nbsp;insulation, plastering of&nbsp;the facade, priming for the application of&nbsp;decorative plaster, and covering metal arches with concrete panels.<br \/> The installation of&nbsp;decorative elements on&nbsp;the facade continues. New materials have been delivered.<br \/> Work continues on&nbsp;the installation of&nbsp;facade lighting&nbsp;&mdash; laying facade lighting cables and installing brackets for light fixtures.<br \/> &#8203;&#8203;- Installation of&nbsp;engineering systems<br \/> The installation of&nbsp;smoke extraction ducts has been completed.<br \/> Metal ventilation boxes have been manufactured and installed.<br \/> &#8203;&#8203;- Glazing on&nbsp;the 10th floor.<br \/> Work has been completed on&nbsp;the installation of&nbsp;metal trusses and columns for the subsequent installation of&nbsp;stained glass structures.<br \/> &#8203;&#8203;- Elevator installation<br \/> Work has been completed on&nbsp;the installation of&nbsp;L3 elevator equipment (cabin assembly), and work is&nbsp;underway on&nbsp;the installation of&nbsp;L1 elevator equipment (door installation).<br \/> &#8203;&#8203;- Work on&nbsp;the infrastructure building<br \/> Work has been completed on&nbsp;the installation of&nbsp;a&nbsp;monolithic roof parapet belt (elevator shafts) and plastering of&nbsp;parapets and engineering shafts.<br \/> Work is&nbsp;underway on&nbsp;laying ceramic blocks on&nbsp;the exterior walls, installing monolithic sides for stained glass windows, and installing monolithic sides for balcony railings (3rd floor).<br \/> Rough plastering work on&nbsp;the facade is&nbsp;continuing.<br \/> .<\/p>"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/wyndhamgrandbatumigonio.com\/wp-admin\/edit.php?post_type=news\"><\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"template":"","class_list":["post-44963","news","type-news","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Monthly Construction Report December 2025. Wyndham Grand Batumi Gonio. Aqua In&nbsp;December 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Wyndham Grand Batumi Gonio. Aqua December saw dynamic progress on&nbsp;all fronts of&nbsp;the project: from the erection of&nbsp;monolithic structures to&nbsp;the detailed design of&nbsp;facades and engineering systems. Dozens of&nbsp;processes are being carried out simultaneously on&nbsp;the sites, which allows us&nbsp;to&nbsp;maintain a&nbsp;high pace. &mdash;&nbsp;Monolithic work Work has been completed on&nbsp;the entrance area, columns, and steps. &mdash;&nbsp;Work on&nbsp;balconies Work continues: installation of&nbsp;upper waterproofing coating, laying of&nbsp;porcelain stoneware on&nbsp;balconies, cladding of&nbsp;the ceiling with concrete panels (5 floors), reinforcement of&nbsp;the ceiling (6 floors), application of&nbsp;decorative plaster to&nbsp;the walls (6 floors), application of&nbsp;decorative plaster to&nbsp;the ceiling (6 floors), manufacture and installation of&nbsp;embedded parts for fences (2 floors). &#8203;&#8203;- Facade work Work continues on&nbsp;the installation of&nbsp;mineral wool, XPS, reinforcement of&nbsp;insulation, plastering of&nbsp;the facade, priming for the application of&nbsp;decorative plaster, and covering metal arches with concrete panels. The installation of&nbsp;decorative elements on&nbsp;the facade continues. New materials have been delivered. Work continues on&nbsp;the installation of&nbsp;facade lighting&nbsp;&mdash; laying facade lighting cables and installing brackets for light fixtures. &#8203;&#8203;- Installation of&nbsp;engineering systems The installation of&nbsp;smoke extraction ducts has been completed. Metal ventilation boxes have been manufactured and installed. &#8203;&#8203;- Glazing on&nbsp;the 10th floor. Work has been completed on&nbsp;the installation of&nbsp;metal trusses and columns for the subsequent installation of&nbsp;stained glass structures. &#8203;&#8203;- Elevator installation Work has been completed on&nbsp;the installation of&nbsp;L3 elevator equipment (cabin assembly), and work is&nbsp;underway on&nbsp;the installation of&nbsp;L1 elevator equipment (door installation). &#8203;&#8203;- Work on&nbsp;the infrastructure building Work has been completed on&nbsp;the installation of&nbsp;a&nbsp;monolithic roof parapet belt (elevator shafts) and plastering of&nbsp;parapets and engineering shafts. Work is&nbsp;underway on&nbsp;laying ceramic blocks on&nbsp;the exterior walls, installing monolithic sides for stained glass windows, and installing monolithic sides for balcony railings (3rd floor). Rough plastering work on&nbsp;the facade is&nbsp;continuing. . &#8211; Wyndham Grand Batumi Gonio<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-december-2025-wyndham-grand-batumi-gonio-aqua-in-december-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-sit\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Monthly Construction Report December 2025. Wyndham Grand Batumi Gonio. Aqua In&nbsp;December 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Wyndham Grand Batumi Gonio. Aqua December saw dynamic progress on&nbsp;all fronts of&nbsp;the project: from the erection of&nbsp;monolithic structures to&nbsp;the detailed design of&nbsp;facades and engineering systems. Dozens of&nbsp;processes are being carried out simultaneously on&nbsp;the sites, which allows us&nbsp;to&nbsp;maintain a&nbsp;high pace. &mdash;&nbsp;Monolithic work Work has been completed on&nbsp;the entrance area, columns, and steps. &mdash;&nbsp;Work on&nbsp;balconies Work continues: installation of&nbsp;upper waterproofing coating, laying of&nbsp;porcelain stoneware on&nbsp;balconies, cladding of&nbsp;the ceiling with concrete panels (5 floors), reinforcement of&nbsp;the ceiling (6 floors), application of&nbsp;decorative plaster to&nbsp;the walls (6 floors), application of&nbsp;decorative plaster to&nbsp;the ceiling (6 floors), manufacture and installation of&nbsp;embedded parts for fences (2 floors). &#8203;&#8203;- Facade work Work continues on&nbsp;the installation of&nbsp;mineral wool, XPS, reinforcement of&nbsp;insulation, plastering of&nbsp;the facade, priming for the application of&nbsp;decorative plaster, and covering metal arches with concrete panels. The installation of&nbsp;decorative elements on&nbsp;the facade continues. New materials have been delivered. Work continues on&nbsp;the installation of&nbsp;facade lighting&nbsp;&mdash; laying facade lighting cables and installing brackets for light fixtures. &#8203;&#8203;- Installation of&nbsp;engineering systems The installation of&nbsp;smoke extraction ducts has been completed. Metal ventilation boxes have been manufactured and installed. &#8203;&#8203;- Glazing on&nbsp;the 10th floor. Work has been completed on&nbsp;the installation of&nbsp;metal trusses and columns for the subsequent installation of&nbsp;stained glass structures. &#8203;&#8203;- Elevator installation Work has been completed on&nbsp;the installation of&nbsp;L3 elevator equipment (cabin assembly), and work is&nbsp;underway on&nbsp;the installation of&nbsp;L1 elevator equipment (door installation). &#8203;&#8203;- Work on&nbsp;the infrastructure building Work has been completed on&nbsp;the installation of&nbsp;a&nbsp;monolithic roof parapet belt (elevator shafts) and plastering of&nbsp;parapets and engineering shafts. Work is&nbsp;underway on&nbsp;laying ceramic blocks on&nbsp;the exterior walls, installing monolithic sides for stained glass windows, and installing monolithic sides for balcony railings (3rd floor). Rough plastering work on&nbsp;the facade is&nbsp;continuing. . &#8211; Wyndham Grand Batumi Gonio\" \/>\n<meta property=\"og:url\" content=\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-december-2025-wyndham-grand-batumi-gonio-aqua-in-december-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-sit\/\" \/>\n<meta property=\"og:site_name\" content=\"Wyndham Grand Batumi Gonio\" \/>\n<meta property=\"article:modified_time\" content=\"2026-01-22T20:19:49+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-december-2025-wyndham-grand-batumi-gonio-aqua-in-december-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-sit\/\",\"url\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-december-2025-wyndham-grand-batumi-gonio-aqua-in-december-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-sit\/\",\"name\":\"Monthly Construction Report December 2025. Wyndham Grand Batumi Gonio. Aqua In&nbsp;December 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Wyndham Grand Batumi Gonio. Aqua December saw dynamic progress on&nbsp;all fronts of&nbsp;the project: from the erection of&nbsp;monolithic structures to&nbsp;the detailed design of&nbsp;facades and engineering systems. Dozens of&nbsp;processes are being carried out simultaneously on&nbsp;the sites, which allows us&nbsp;to&nbsp;maintain a&nbsp;high pace. &mdash;&nbsp;Monolithic work Work has been completed on&nbsp;the entrance area, columns, and steps. &mdash;&nbsp;Work on&nbsp;balconies Work continues: installation of&nbsp;upper waterproofing coating, laying of&nbsp;porcelain stoneware on&nbsp;balconies, cladding of&nbsp;the ceiling with concrete panels (5 floors), reinforcement of&nbsp;the ceiling (6 floors), application of&nbsp;decorative plaster to&nbsp;the walls (6 floors), application of&nbsp;decorative plaster to&nbsp;the ceiling (6 floors), manufacture and installation of&nbsp;embedded parts for fences (2 floors). &#8203;&#8203;- Facade work Work continues on&nbsp;the installation of&nbsp;mineral wool, XPS, reinforcement of&nbsp;insulation, plastering of&nbsp;the facade, priming for the application of&nbsp;decorative plaster, and covering metal arches with concrete panels. The installation of&nbsp;decorative elements on&nbsp;the facade continues. New materials have been delivered. Work continues on&nbsp;the installation of&nbsp;facade lighting&nbsp;&mdash; laying facade lighting cables and installing brackets for light fixtures. &#8203;&#8203;- Installation of&nbsp;engineering systems The installation of&nbsp;smoke extraction ducts has been completed. Metal ventilation boxes have been manufactured and installed. &#8203;&#8203;- Glazing on&nbsp;the 10th floor. Work has been completed on&nbsp;the installation of&nbsp;metal trusses and columns for the subsequent installation of&nbsp;stained glass structures. &#8203;&#8203;- Elevator installation Work has been completed on&nbsp;the installation of&nbsp;L3 elevator equipment (cabin assembly), and work is&nbsp;underway on&nbsp;the installation of&nbsp;L1 elevator equipment (door installation). &#8203;&#8203;- Work on&nbsp;the infrastructure building Work has been completed on&nbsp;the installation of&nbsp;a&nbsp;monolithic roof parapet belt (elevator shafts) and plastering of&nbsp;parapets and engineering shafts. Work is&nbsp;underway on&nbsp;laying ceramic blocks on&nbsp;the exterior walls, installing monolithic sides for stained glass windows, and installing monolithic sides for balcony railings (3rd floor). Rough plastering work on&nbsp;the facade is&nbsp;continuing. . &#8211; Wyndham Grand Batumi Gonio\",\"isPartOf\":{\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/#website\"},\"datePublished\":\"2026-01-22T16:00:53+00:00\",\"dateModified\":\"2026-01-22T20:19:49+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-december-2025-wyndham-grand-batumi-gonio-aqua-in-december-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-sit\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-december-2025-wyndham-grand-batumi-gonio-aqua-in-december-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-sit\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-december-2025-wyndham-grand-batumi-gonio-aqua-in-december-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-sit\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430\",\"item\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Monthly Construction Report December 2025. Wyndham Grand Batumi Gonio. Aqua In&nbsp;December 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Wyndham Grand Batumi Gonio. Aqua December saw dynamic progress on&nbsp;all fronts of&nbsp;the project: from the erection of&nbsp;monolithic structures to&nbsp;the detailed design of&nbsp;facades and engineering systems. Dozens of&nbsp;processes are being carried out simultaneously on&nbsp;the sites, which allows us&nbsp;to&nbsp;maintain a&nbsp;high pace. &mdash;&nbsp;Monolithic work Work has been completed on&nbsp;the entrance area, columns, and steps. &mdash;&nbsp;Work on&nbsp;balconies Work continues: installation of&nbsp;upper waterproofing coating, laying of&nbsp;porcelain stoneware on&nbsp;balconies, cladding of&nbsp;the ceiling with concrete panels (5 floors), reinforcement of&nbsp;the ceiling (6 floors), application of&nbsp;decorative plaster to&nbsp;the walls (6 floors), application of&nbsp;decorative plaster to&nbsp;the ceiling (6 floors), manufacture and installation of&nbsp;embedded parts for fences (2 floors). &#8203;&#8203;- Facade work Work continues on&nbsp;the installation of&nbsp;mineral wool, XPS, reinforcement of&nbsp;insulation, plastering of&nbsp;the facade, priming for the application of&nbsp;decorative plaster, and covering metal arches with concrete panels. The installation of&nbsp;decorative elements on&nbsp;the facade continues. New materials have been delivered. Work continues on&nbsp;the installation of&nbsp;facade lighting&nbsp;&mdash; laying facade lighting cables and installing brackets for light fixtures. &#8203;&#8203;- Installation of&nbsp;engineering systems The installation of&nbsp;smoke extraction ducts has been completed. Metal ventilation boxes have been manufactured and installed. &#8203;&#8203;- Glazing on&nbsp;the 10th floor. Work has been completed on&nbsp;the installation of&nbsp;metal trusses and columns for the subsequent installation of&nbsp;stained glass structures. &#8203;&#8203;- Elevator installation Work has been completed on&nbsp;the installation of&nbsp;L3 elevator equipment (cabin assembly), and work is&nbsp;underway on&nbsp;the installation of&nbsp;L1 elevator equipment (door installation). &#8203;&#8203;- Work on&nbsp;the infrastructure building Work has been completed on&nbsp;the installation of&nbsp;a&nbsp;monolithic roof parapet belt (elevator shafts) and plastering of&nbsp;parapets and engineering shafts. Work is&nbsp;underway on&nbsp;laying ceramic blocks on&nbsp;the exterior walls, installing monolithic sides for stained glass windows, and installing monolithic sides for balcony railings (3rd floor). Rough plastering work on&nbsp;the facade is&nbsp;continuing. .\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/#website\",\"url\":\"https:\/\/wyndhamgrandbatumigonio.com\/\",\"name\":\"Wyndham Grand Batumi Gonio\",\"description\":\"The benefits of investing in a brand from the world&#039;s leading hotel chain Wyndham Grand\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/wyndhamgrandbatumigonio.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Monthly Construction Report December 2025. Wyndham Grand Batumi Gonio. Aqua In&nbsp;December 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Wyndham Grand Batumi Gonio. Aqua December saw dynamic progress on&nbsp;all fronts of&nbsp;the project: from the erection of&nbsp;monolithic structures to&nbsp;the detailed design of&nbsp;facades and engineering systems. Dozens of&nbsp;processes are being carried out simultaneously on&nbsp;the sites, which allows us&nbsp;to&nbsp;maintain a&nbsp;high pace. &mdash;&nbsp;Monolithic work Work has been completed on&nbsp;the entrance area, columns, and steps. &mdash;&nbsp;Work on&nbsp;balconies Work continues: installation of&nbsp;upper waterproofing coating, laying of&nbsp;porcelain stoneware on&nbsp;balconies, cladding of&nbsp;the ceiling with concrete panels (5 floors), reinforcement of&nbsp;the ceiling (6 floors), application of&nbsp;decorative plaster to&nbsp;the walls (6 floors), application of&nbsp;decorative plaster to&nbsp;the ceiling (6 floors), manufacture and installation of&nbsp;embedded parts for fences (2 floors). &#8203;&#8203;- Facade work Work continues on&nbsp;the installation of&nbsp;mineral wool, XPS, reinforcement of&nbsp;insulation, plastering of&nbsp;the facade, priming for the application of&nbsp;decorative plaster, and covering metal arches with concrete panels. The installation of&nbsp;decorative elements on&nbsp;the facade continues. New materials have been delivered. Work continues on&nbsp;the installation of&nbsp;facade lighting&nbsp;&mdash; laying facade lighting cables and installing brackets for light fixtures. &#8203;&#8203;- Installation of&nbsp;engineering systems The installation of&nbsp;smoke extraction ducts has been completed. Metal ventilation boxes have been manufactured and installed. &#8203;&#8203;- Glazing on&nbsp;the 10th floor. Work has been completed on&nbsp;the installation of&nbsp;metal trusses and columns for the subsequent installation of&nbsp;stained glass structures. &#8203;&#8203;- Elevator installation Work has been completed on&nbsp;the installation of&nbsp;L3 elevator equipment (cabin assembly), and work is&nbsp;underway on&nbsp;the installation of&nbsp;L1 elevator equipment (door installation). &#8203;&#8203;- Work on&nbsp;the infrastructure building Work has been completed on&nbsp;the installation of&nbsp;a&nbsp;monolithic roof parapet belt (elevator shafts) and plastering of&nbsp;parapets and engineering shafts. Work is&nbsp;underway on&nbsp;laying ceramic blocks on&nbsp;the exterior walls, installing monolithic sides for stained glass windows, and installing monolithic sides for balcony railings (3rd floor). Rough plastering work on&nbsp;the facade is&nbsp;continuing. . &#8211; Wyndham Grand Batumi Gonio","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-december-2025-wyndham-grand-batumi-gonio-aqua-in-december-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-sit\/","og_locale":"en_US","og_type":"article","og_title":"Monthly Construction Report December 2025. Wyndham Grand Batumi Gonio. Aqua In&nbsp;December 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Wyndham Grand Batumi Gonio. Aqua December saw dynamic progress on&nbsp;all fronts of&nbsp;the project: from the erection of&nbsp;monolithic structures to&nbsp;the detailed design of&nbsp;facades and engineering systems. Dozens of&nbsp;processes are being carried out simultaneously on&nbsp;the sites, which allows us&nbsp;to&nbsp;maintain a&nbsp;high pace. &mdash;&nbsp;Monolithic work Work has been completed on&nbsp;the entrance area, columns, and steps. &mdash;&nbsp;Work on&nbsp;balconies Work continues: installation of&nbsp;upper waterproofing coating, laying of&nbsp;porcelain stoneware on&nbsp;balconies, cladding of&nbsp;the ceiling with concrete panels (5 floors), reinforcement of&nbsp;the ceiling (6 floors), application of&nbsp;decorative plaster to&nbsp;the walls (6 floors), application of&nbsp;decorative plaster to&nbsp;the ceiling (6 floors), manufacture and installation of&nbsp;embedded parts for fences (2 floors). &#8203;&#8203;- Facade work Work continues on&nbsp;the installation of&nbsp;mineral wool, XPS, reinforcement of&nbsp;insulation, plastering of&nbsp;the facade, priming for the application of&nbsp;decorative plaster, and covering metal arches with concrete panels. The installation of&nbsp;decorative elements on&nbsp;the facade continues. New materials have been delivered. Work continues on&nbsp;the installation of&nbsp;facade lighting&nbsp;&mdash; laying facade lighting cables and installing brackets for light fixtures. &#8203;&#8203;- Installation of&nbsp;engineering systems The installation of&nbsp;smoke extraction ducts has been completed. Metal ventilation boxes have been manufactured and installed. &#8203;&#8203;- Glazing on&nbsp;the 10th floor. Work has been completed on&nbsp;the installation of&nbsp;metal trusses and columns for the subsequent installation of&nbsp;stained glass structures. &#8203;&#8203;- Elevator installation Work has been completed on&nbsp;the installation of&nbsp;L3 elevator equipment (cabin assembly), and work is&nbsp;underway on&nbsp;the installation of&nbsp;L1 elevator equipment (door installation). &#8203;&#8203;- Work on&nbsp;the infrastructure building Work has been completed on&nbsp;the installation of&nbsp;a&nbsp;monolithic roof parapet belt (elevator shafts) and plastering of&nbsp;parapets and engineering shafts. Work is&nbsp;underway on&nbsp;laying ceramic blocks on&nbsp;the exterior walls, installing monolithic sides for stained glass windows, and installing monolithic sides for balcony railings (3rd floor). Rough plastering work on&nbsp;the facade is&nbsp;continuing. . &#8211; Wyndham Grand Batumi Gonio","og_url":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-december-2025-wyndham-grand-batumi-gonio-aqua-in-december-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-sit\/","og_site_name":"Wyndham Grand Batumi Gonio","article_modified_time":"2026-01-22T20:19:49+00:00","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-december-2025-wyndham-grand-batumi-gonio-aqua-in-december-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-sit\/","url":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-december-2025-wyndham-grand-batumi-gonio-aqua-in-december-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-sit\/","name":"Monthly Construction Report December 2025. Wyndham Grand Batumi Gonio. Aqua In&nbsp;December 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Wyndham Grand Batumi Gonio. Aqua December saw dynamic progress on&nbsp;all fronts of&nbsp;the project: from the erection of&nbsp;monolithic structures to&nbsp;the detailed design of&nbsp;facades and engineering systems. Dozens of&nbsp;processes are being carried out simultaneously on&nbsp;the sites, which allows us&nbsp;to&nbsp;maintain a&nbsp;high pace. &mdash;&nbsp;Monolithic work Work has been completed on&nbsp;the entrance area, columns, and steps. &mdash;&nbsp;Work on&nbsp;balconies Work continues: installation of&nbsp;upper waterproofing coating, laying of&nbsp;porcelain stoneware on&nbsp;balconies, cladding of&nbsp;the ceiling with concrete panels (5 floors), reinforcement of&nbsp;the ceiling (6 floors), application of&nbsp;decorative plaster to&nbsp;the walls (6 floors), application of&nbsp;decorative plaster to&nbsp;the ceiling (6 floors), manufacture and installation of&nbsp;embedded parts for fences (2 floors). &#8203;&#8203;- Facade work Work continues on&nbsp;the installation of&nbsp;mineral wool, XPS, reinforcement of&nbsp;insulation, plastering of&nbsp;the facade, priming for the application of&nbsp;decorative plaster, and covering metal arches with concrete panels. The installation of&nbsp;decorative elements on&nbsp;the facade continues. New materials have been delivered. Work continues on&nbsp;the installation of&nbsp;facade lighting&nbsp;&mdash; laying facade lighting cables and installing brackets for light fixtures. &#8203;&#8203;- Installation of&nbsp;engineering systems The installation of&nbsp;smoke extraction ducts has been completed. Metal ventilation boxes have been manufactured and installed. &#8203;&#8203;- Glazing on&nbsp;the 10th floor. Work has been completed on&nbsp;the installation of&nbsp;metal trusses and columns for the subsequent installation of&nbsp;stained glass structures. &#8203;&#8203;- Elevator installation Work has been completed on&nbsp;the installation of&nbsp;L3 elevator equipment (cabin assembly), and work is&nbsp;underway on&nbsp;the installation of&nbsp;L1 elevator equipment (door installation). &#8203;&#8203;- Work on&nbsp;the infrastructure building Work has been completed on&nbsp;the installation of&nbsp;a&nbsp;monolithic roof parapet belt (elevator shafts) and plastering of&nbsp;parapets and engineering shafts. Work is&nbsp;underway on&nbsp;laying ceramic blocks on&nbsp;the exterior walls, installing monolithic sides for stained glass windows, and installing monolithic sides for balcony railings (3rd floor). Rough plastering work on&nbsp;the facade is&nbsp;continuing. . &#8211; Wyndham Grand Batumi Gonio","isPartOf":{"@id":"https:\/\/wyndhamgrandbatumigonio.com\/#website"},"datePublished":"2026-01-22T16:00:53+00:00","dateModified":"2026-01-22T20:19:49+00:00","breadcrumb":{"@id":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-december-2025-wyndham-grand-batumi-gonio-aqua-in-december-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-sit\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-december-2025-wyndham-grand-batumi-gonio-aqua-in-december-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-sit\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-december-2025-wyndham-grand-batumi-gonio-aqua-in-december-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-sit\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430","item":"https:\/\/wyndhamgrandbatumigonio.com\/en\/"},{"@type":"ListItem","position":2,"name":"Monthly Construction Report December 2025. Wyndham Grand Batumi Gonio. Aqua In&nbsp;December 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Wyndham Grand Batumi Gonio. Aqua December saw dynamic progress on&nbsp;all fronts of&nbsp;the project: from the erection of&nbsp;monolithic structures to&nbsp;the detailed design of&nbsp;facades and engineering systems. Dozens of&nbsp;processes are being carried out simultaneously on&nbsp;the sites, which allows us&nbsp;to&nbsp;maintain a&nbsp;high pace. &mdash;&nbsp;Monolithic work Work has been completed on&nbsp;the entrance area, columns, and steps. &mdash;&nbsp;Work on&nbsp;balconies Work continues: installation of&nbsp;upper waterproofing coating, laying of&nbsp;porcelain stoneware on&nbsp;balconies, cladding of&nbsp;the ceiling with concrete panels (5 floors), reinforcement of&nbsp;the ceiling (6 floors), application of&nbsp;decorative plaster to&nbsp;the walls (6 floors), application of&nbsp;decorative plaster to&nbsp;the ceiling (6 floors), manufacture and installation of&nbsp;embedded parts for fences (2 floors). &#8203;&#8203;- Facade work Work continues on&nbsp;the installation of&nbsp;mineral wool, XPS, reinforcement of&nbsp;insulation, plastering of&nbsp;the facade, priming for the application of&nbsp;decorative plaster, and covering metal arches with concrete panels. The installation of&nbsp;decorative elements on&nbsp;the facade continues. New materials have been delivered. Work continues on&nbsp;the installation of&nbsp;facade lighting&nbsp;&mdash; laying facade lighting cables and installing brackets for light fixtures. &#8203;&#8203;- Installation of&nbsp;engineering systems The installation of&nbsp;smoke extraction ducts has been completed. Metal ventilation boxes have been manufactured and installed. &#8203;&#8203;- Glazing on&nbsp;the 10th floor. Work has been completed on&nbsp;the installation of&nbsp;metal trusses and columns for the subsequent installation of&nbsp;stained glass structures. &#8203;&#8203;- Elevator installation Work has been completed on&nbsp;the installation of&nbsp;L3 elevator equipment (cabin assembly), and work is&nbsp;underway on&nbsp;the installation of&nbsp;L1 elevator equipment (door installation). &#8203;&#8203;- Work on&nbsp;the infrastructure building Work has been completed on&nbsp;the installation of&nbsp;a&nbsp;monolithic roof parapet belt (elevator shafts) and plastering of&nbsp;parapets and engineering shafts. Work is&nbsp;underway on&nbsp;laying ceramic blocks on&nbsp;the exterior walls, installing monolithic sides for stained glass windows, and installing monolithic sides for balcony railings (3rd floor). Rough plastering work on&nbsp;the facade is&nbsp;continuing. ."}]},{"@type":"WebSite","@id":"https:\/\/wyndhamgrandbatumigonio.com\/#website","url":"https:\/\/wyndhamgrandbatumigonio.com\/","name":"Wyndham Grand Batumi Gonio","description":"The benefits of investing in a brand from the world&#039;s leading hotel chain Wyndham Grand","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/wyndhamgrandbatumigonio.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/news\/44963","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/types\/news"}],"wp:attachment":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/media?parent=44963"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}