{"id":44987,"date":"2026-01-22T21:00:11","date_gmt":"2026-01-22T17:00:11","guid":{"rendered":"https:\/\/wyndhamgrandbatumigonio.com\/?post_type=news&#038;p=44987"},"modified":"2026-01-23T01:14:06","modified_gmt":"2026-01-22T21:14:06","slug":"monthly-construction-report-december-2025-wyndham-grand-batumi-gonio-villas-in-december-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-s","status":"publish","type":"news","link":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-december-2025-wyndham-grand-batumi-gonio-villas-in-december-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-s\/","title":{"rendered":"<b>Monthly Construction Report<br \/> December 2025. Wyndham Grand Batumi Gonio. Villas<\/b> <p>In&nbsp;December 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project.<br \/> Wyndham Grand Batumi Gonio. Villas<\/p> <p>&mdash;&nbsp;Monolithic work<br \/> Concreting of&nbsp;the internal staircases in&nbsp;the villas has been completed.<br \/> &mdash;&nbsp;Masonry work<br \/> The masonry of&nbsp;the external walls of&nbsp;the 3rd floor from ceramic blocks is&nbsp;being completed on&nbsp;all villas.<br \/> &mdash;&nbsp;Installation of&nbsp;fireplaces<br \/> Work has been completed on&nbsp;the installation of&nbsp;monolithic columns and chimney belts.<br \/> &mdash;&nbsp;Stained glass glazing<br \/> New batches of&nbsp;stained glass frames and <nobr>double-glazed<\/nobr> windows have been ordered and delivered. Installation is&nbsp;being carried out on&nbsp;the villas.<br \/> &mdash;&nbsp;Facade work<br \/> Facade work is&nbsp;underway to&nbsp;install mineral wool and insulate the facades of&nbsp;villas 8, 9, and 10. Work continues on&nbsp;reinforcing the mineral wool and priming. Work is&nbsp;also underway to&nbsp;install granite window sills.<br \/> &mdash;&nbsp;Plastering work<br \/> Plastering work is&nbsp;being carried out on&nbsp;the interior walls of&nbsp;villas 11, 12, and 13.<br \/> &mdash;&nbsp;Installation of&nbsp;plasterboard frames for interior partitions.<br \/> Work has begun on&nbsp;the installation of&nbsp;plasterboard frames for interior partitions, and work has been completed on&nbsp;villa 3.<br \/> &mdash;&nbsp;Installation of&nbsp;engineering systems.<br \/> Work has begun on&nbsp;the installation of&nbsp;electrical lighting and power supply in&nbsp;the villas and the installation of&nbsp;outdoor lighting.<\/p>"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/wyndhamgrandbatumigonio.com\/wp-admin\/edit.php?post_type=news\"><\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"template":"","class_list":["post-44987","news","type-news","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Monthly Construction Report December 2025. Wyndham Grand Batumi Gonio. Villas In&nbsp;December 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Wyndham Grand Batumi Gonio. Villas &mdash;&nbsp;Monolithic work Concreting of&nbsp;the internal staircases in&nbsp;the villas has been completed. &mdash;&nbsp;Masonry work The masonry of&nbsp;the external walls of&nbsp;the 3rd floor from ceramic blocks is&nbsp;being completed on&nbsp;all villas. &mdash;&nbsp;Installation of&nbsp;fireplaces Work has been completed on&nbsp;the installation of&nbsp;monolithic columns and chimney belts. &mdash;&nbsp;Stained glass glazing New batches of&nbsp;stained glass frames and double-glazed windows have been ordered and delivered. Installation is&nbsp;being carried out on&nbsp;the villas. &mdash;&nbsp;Facade work Facade work is&nbsp;underway to&nbsp;install mineral wool and insulate the facades of&nbsp;villas 8, 9, and 10. Work continues on&nbsp;reinforcing the mineral wool and priming. Work is&nbsp;also underway to&nbsp;install granite window sills. &mdash;&nbsp;Plastering work Plastering work is&nbsp;being carried out on&nbsp;the interior walls of&nbsp;villas 11, 12, and 13. &mdash;&nbsp;Installation of&nbsp;plasterboard frames for interior partitions. Work has begun on&nbsp;the installation of&nbsp;plasterboard frames for interior partitions, and work has been completed on&nbsp;villa 3. &mdash;&nbsp;Installation of&nbsp;engineering systems. Work has begun on&nbsp;the installation of&nbsp;electrical lighting and power supply in&nbsp;the villas and the installation of&nbsp;outdoor lighting. &#8211; Wyndham Grand Batumi Gonio<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-december-2025-wyndham-grand-batumi-gonio-villas-in-december-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-s\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Monthly Construction Report December 2025. Wyndham Grand Batumi Gonio. Villas In&nbsp;December 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Wyndham Grand Batumi Gonio. Villas &mdash;&nbsp;Monolithic work Concreting of&nbsp;the internal staircases in&nbsp;the villas has been completed. &mdash;&nbsp;Masonry work The masonry of&nbsp;the external walls of&nbsp;the 3rd floor from ceramic blocks is&nbsp;being completed on&nbsp;all villas. &mdash;&nbsp;Installation of&nbsp;fireplaces Work has been completed on&nbsp;the installation of&nbsp;monolithic columns and chimney belts. &mdash;&nbsp;Stained glass glazing New batches of&nbsp;stained glass frames and double-glazed windows have been ordered and delivered. Installation is&nbsp;being carried out on&nbsp;the villas. &mdash;&nbsp;Facade work Facade work is&nbsp;underway to&nbsp;install mineral wool and insulate the facades of&nbsp;villas 8, 9, and 10. Work continues on&nbsp;reinforcing the mineral wool and priming. Work is&nbsp;also underway to&nbsp;install granite window sills. &mdash;&nbsp;Plastering work Plastering work is&nbsp;being carried out on&nbsp;the interior walls of&nbsp;villas 11, 12, and 13. &mdash;&nbsp;Installation of&nbsp;plasterboard frames for interior partitions. Work has begun on&nbsp;the installation of&nbsp;plasterboard frames for interior partitions, and work has been completed on&nbsp;villa 3. &mdash;&nbsp;Installation of&nbsp;engineering systems. Work has begun on&nbsp;the installation of&nbsp;electrical lighting and power supply in&nbsp;the villas and the installation of&nbsp;outdoor lighting. &#8211; Wyndham Grand Batumi Gonio\" \/>\n<meta property=\"og:url\" content=\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-december-2025-wyndham-grand-batumi-gonio-villas-in-december-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-s\/\" \/>\n<meta property=\"og:site_name\" content=\"Wyndham Grand Batumi Gonio\" \/>\n<meta property=\"article:modified_time\" content=\"2026-01-22T21:14:06+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-december-2025-wyndham-grand-batumi-gonio-villas-in-december-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-s\/\",\"url\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-december-2025-wyndham-grand-batumi-gonio-villas-in-december-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-s\/\",\"name\":\"Monthly Construction Report December 2025. Wyndham Grand Batumi Gonio. Villas In&nbsp;December 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Wyndham Grand Batumi Gonio. Villas &mdash;&nbsp;Monolithic work Concreting of&nbsp;the internal staircases in&nbsp;the villas has been completed. &mdash;&nbsp;Masonry work The masonry of&nbsp;the external walls of&nbsp;the 3rd floor from ceramic blocks is&nbsp;being completed on&nbsp;all villas. &mdash;&nbsp;Installation of&nbsp;fireplaces Work has been completed on&nbsp;the installation of&nbsp;monolithic columns and chimney belts. &mdash;&nbsp;Stained glass glazing New batches of&nbsp;stained glass frames and double-glazed windows have been ordered and delivered. Installation is&nbsp;being carried out on&nbsp;the villas. &mdash;&nbsp;Facade work Facade work is&nbsp;underway to&nbsp;install mineral wool and insulate the facades of&nbsp;villas 8, 9, and 10. Work continues on&nbsp;reinforcing the mineral wool and priming. Work is&nbsp;also underway to&nbsp;install granite window sills. &mdash;&nbsp;Plastering work Plastering work is&nbsp;being carried out on&nbsp;the interior walls of&nbsp;villas 11, 12, and 13. &mdash;&nbsp;Installation of&nbsp;plasterboard frames for interior partitions. Work has begun on&nbsp;the installation of&nbsp;plasterboard frames for interior partitions, and work has been completed on&nbsp;villa 3. &mdash;&nbsp;Installation of&nbsp;engineering systems. Work has begun on&nbsp;the installation of&nbsp;electrical lighting and power supply in&nbsp;the villas and the installation of&nbsp;outdoor lighting. &#8211; Wyndham Grand Batumi Gonio\",\"isPartOf\":{\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/#website\"},\"datePublished\":\"2026-01-22T17:00:11+00:00\",\"dateModified\":\"2026-01-22T21:14:06+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-december-2025-wyndham-grand-batumi-gonio-villas-in-december-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-s\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-december-2025-wyndham-grand-batumi-gonio-villas-in-december-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-s\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-december-2025-wyndham-grand-batumi-gonio-villas-in-december-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-s\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430\",\"item\":\"https:\/\/wyndhamgrandbatumigonio.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Monthly Construction Report December 2025. Wyndham Grand Batumi Gonio. Villas In&nbsp;December 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Wyndham Grand Batumi Gonio. Villas &mdash;&nbsp;Monolithic work Concreting of&nbsp;the internal staircases in&nbsp;the villas has been completed. &mdash;&nbsp;Masonry work The masonry of&nbsp;the external walls of&nbsp;the 3rd floor from ceramic blocks is&nbsp;being completed on&nbsp;all villas. &mdash;&nbsp;Installation of&nbsp;fireplaces Work has been completed on&nbsp;the installation of&nbsp;monolithic columns and chimney belts. &mdash;&nbsp;Stained glass glazing New batches of&nbsp;stained glass frames and double-glazed windows have been ordered and delivered. Installation is&nbsp;being carried out on&nbsp;the villas. &mdash;&nbsp;Facade work Facade work is&nbsp;underway to&nbsp;install mineral wool and insulate the facades of&nbsp;villas 8, 9, and 10. Work continues on&nbsp;reinforcing the mineral wool and priming. Work is&nbsp;also underway to&nbsp;install granite window sills. &mdash;&nbsp;Plastering work Plastering work is&nbsp;being carried out on&nbsp;the interior walls of&nbsp;villas 11, 12, and 13. &mdash;&nbsp;Installation of&nbsp;plasterboard frames for interior partitions. Work has begun on&nbsp;the installation of&nbsp;plasterboard frames for interior partitions, and work has been completed on&nbsp;villa 3. &mdash;&nbsp;Installation of&nbsp;engineering systems. Work has begun on&nbsp;the installation of&nbsp;electrical lighting and power supply in&nbsp;the villas and the installation of&nbsp;outdoor lighting.\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/wyndhamgrandbatumigonio.com\/#website\",\"url\":\"https:\/\/wyndhamgrandbatumigonio.com\/\",\"name\":\"Wyndham Grand Batumi Gonio\",\"description\":\"The benefits of investing in a brand from the world&#039;s leading hotel chain Wyndham Grand\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/wyndhamgrandbatumigonio.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Monthly Construction Report December 2025. Wyndham Grand Batumi Gonio. Villas In&nbsp;December 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Wyndham Grand Batumi Gonio. Villas &mdash;&nbsp;Monolithic work Concreting of&nbsp;the internal staircases in&nbsp;the villas has been completed. &mdash;&nbsp;Masonry work The masonry of&nbsp;the external walls of&nbsp;the 3rd floor from ceramic blocks is&nbsp;being completed on&nbsp;all villas. &mdash;&nbsp;Installation of&nbsp;fireplaces Work has been completed on&nbsp;the installation of&nbsp;monolithic columns and chimney belts. &mdash;&nbsp;Stained glass glazing New batches of&nbsp;stained glass frames and double-glazed windows have been ordered and delivered. Installation is&nbsp;being carried out on&nbsp;the villas. &mdash;&nbsp;Facade work Facade work is&nbsp;underway to&nbsp;install mineral wool and insulate the facades of&nbsp;villas 8, 9, and 10. Work continues on&nbsp;reinforcing the mineral wool and priming. Work is&nbsp;also underway to&nbsp;install granite window sills. &mdash;&nbsp;Plastering work Plastering work is&nbsp;being carried out on&nbsp;the interior walls of&nbsp;villas 11, 12, and 13. &mdash;&nbsp;Installation of&nbsp;plasterboard frames for interior partitions. Work has begun on&nbsp;the installation of&nbsp;plasterboard frames for interior partitions, and work has been completed on&nbsp;villa 3. &mdash;&nbsp;Installation of&nbsp;engineering systems. Work has begun on&nbsp;the installation of&nbsp;electrical lighting and power supply in&nbsp;the villas and the installation of&nbsp;outdoor lighting. &#8211; Wyndham Grand Batumi Gonio","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-december-2025-wyndham-grand-batumi-gonio-villas-in-december-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-s\/","og_locale":"en_US","og_type":"article","og_title":"Monthly Construction Report December 2025. Wyndham Grand Batumi Gonio. Villas In&nbsp;December 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Wyndham Grand Batumi Gonio. Villas &mdash;&nbsp;Monolithic work Concreting of&nbsp;the internal staircases in&nbsp;the villas has been completed. &mdash;&nbsp;Masonry work The masonry of&nbsp;the external walls of&nbsp;the 3rd floor from ceramic blocks is&nbsp;being completed on&nbsp;all villas. &mdash;&nbsp;Installation of&nbsp;fireplaces Work has been completed on&nbsp;the installation of&nbsp;monolithic columns and chimney belts. &mdash;&nbsp;Stained glass glazing New batches of&nbsp;stained glass frames and double-glazed windows have been ordered and delivered. Installation is&nbsp;being carried out on&nbsp;the villas. &mdash;&nbsp;Facade work Facade work is&nbsp;underway to&nbsp;install mineral wool and insulate the facades of&nbsp;villas 8, 9, and 10. Work continues on&nbsp;reinforcing the mineral wool and priming. Work is&nbsp;also underway to&nbsp;install granite window sills. &mdash;&nbsp;Plastering work Plastering work is&nbsp;being carried out on&nbsp;the interior walls of&nbsp;villas 11, 12, and 13. &mdash;&nbsp;Installation of&nbsp;plasterboard frames for interior partitions. Work has begun on&nbsp;the installation of&nbsp;plasterboard frames for interior partitions, and work has been completed on&nbsp;villa 3. &mdash;&nbsp;Installation of&nbsp;engineering systems. Work has begun on&nbsp;the installation of&nbsp;electrical lighting and power supply in&nbsp;the villas and the installation of&nbsp;outdoor lighting. &#8211; Wyndham Grand Batumi Gonio","og_url":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-december-2025-wyndham-grand-batumi-gonio-villas-in-december-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-s\/","og_site_name":"Wyndham Grand Batumi Gonio","article_modified_time":"2026-01-22T21:14:06+00:00","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-december-2025-wyndham-grand-batumi-gonio-villas-in-december-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-s\/","url":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-december-2025-wyndham-grand-batumi-gonio-villas-in-december-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-s\/","name":"Monthly Construction Report December 2025. Wyndham Grand Batumi Gonio. Villas In&nbsp;December 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Wyndham Grand Batumi Gonio. Villas &mdash;&nbsp;Monolithic work Concreting of&nbsp;the internal staircases in&nbsp;the villas has been completed. &mdash;&nbsp;Masonry work The masonry of&nbsp;the external walls of&nbsp;the 3rd floor from ceramic blocks is&nbsp;being completed on&nbsp;all villas. &mdash;&nbsp;Installation of&nbsp;fireplaces Work has been completed on&nbsp;the installation of&nbsp;monolithic columns and chimney belts. &mdash;&nbsp;Stained glass glazing New batches of&nbsp;stained glass frames and double-glazed windows have been ordered and delivered. Installation is&nbsp;being carried out on&nbsp;the villas. &mdash;&nbsp;Facade work Facade work is&nbsp;underway to&nbsp;install mineral wool and insulate the facades of&nbsp;villas 8, 9, and 10. Work continues on&nbsp;reinforcing the mineral wool and priming. Work is&nbsp;also underway to&nbsp;install granite window sills. &mdash;&nbsp;Plastering work Plastering work is&nbsp;being carried out on&nbsp;the interior walls of&nbsp;villas 11, 12, and 13. &mdash;&nbsp;Installation of&nbsp;plasterboard frames for interior partitions. Work has begun on&nbsp;the installation of&nbsp;plasterboard frames for interior partitions, and work has been completed on&nbsp;villa 3. &mdash;&nbsp;Installation of&nbsp;engineering systems. Work has begun on&nbsp;the installation of&nbsp;electrical lighting and power supply in&nbsp;the villas and the installation of&nbsp;outdoor lighting. &#8211; Wyndham Grand Batumi Gonio","isPartOf":{"@id":"https:\/\/wyndhamgrandbatumigonio.com\/#website"},"datePublished":"2026-01-22T17:00:11+00:00","dateModified":"2026-01-22T21:14:06+00:00","breadcrumb":{"@id":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-december-2025-wyndham-grand-batumi-gonio-villas-in-december-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-s\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-december-2025-wyndham-grand-batumi-gonio-villas-in-december-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-s\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/wyndhamgrandbatumigonio.com\/en\/news\/monthly-construction-report-december-2025-wyndham-grand-batumi-gonio-villas-in-december-2025-work-continued-on-the-main-areas-of-the-wyndham-grand-batumi-gonio-complex-construction-s\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430","item":"https:\/\/wyndhamgrandbatumigonio.com\/en\/"},{"@type":"ListItem","position":2,"name":"Monthly Construction Report December 2025. Wyndham Grand Batumi Gonio. Villas In&nbsp;December 2025, work continued on&nbsp;the main areas of&nbsp;the Wyndham Grand Batumi Gonio complex construction sites: monolithic construction, facades, engineering networks, and interior finishing. Work was carried out simultaneously on&nbsp;several sites, which allowed us&nbsp;to&nbsp;maintain a&nbsp;high pace and steady progress towards the key stages of&nbsp;the project. Wyndham Grand Batumi Gonio. Villas &mdash;&nbsp;Monolithic work Concreting of&nbsp;the internal staircases in&nbsp;the villas has been completed. &mdash;&nbsp;Masonry work The masonry of&nbsp;the external walls of&nbsp;the 3rd floor from ceramic blocks is&nbsp;being completed on&nbsp;all villas. &mdash;&nbsp;Installation of&nbsp;fireplaces Work has been completed on&nbsp;the installation of&nbsp;monolithic columns and chimney belts. &mdash;&nbsp;Stained glass glazing New batches of&nbsp;stained glass frames and double-glazed windows have been ordered and delivered. Installation is&nbsp;being carried out on&nbsp;the villas. &mdash;&nbsp;Facade work Facade work is&nbsp;underway to&nbsp;install mineral wool and insulate the facades of&nbsp;villas 8, 9, and 10. Work continues on&nbsp;reinforcing the mineral wool and priming. Work is&nbsp;also underway to&nbsp;install granite window sills. &mdash;&nbsp;Plastering work Plastering work is&nbsp;being carried out on&nbsp;the interior walls of&nbsp;villas 11, 12, and 13. &mdash;&nbsp;Installation of&nbsp;plasterboard frames for interior partitions. Work has begun on&nbsp;the installation of&nbsp;plasterboard frames for interior partitions, and work has been completed on&nbsp;villa 3. &mdash;&nbsp;Installation of&nbsp;engineering systems. Work has begun on&nbsp;the installation of&nbsp;electrical lighting and power supply in&nbsp;the villas and the installation of&nbsp;outdoor lighting."}]},{"@type":"WebSite","@id":"https:\/\/wyndhamgrandbatumigonio.com\/#website","url":"https:\/\/wyndhamgrandbatumigonio.com\/","name":"Wyndham Grand Batumi Gonio","description":"The benefits of investing in a brand from the world&#039;s leading hotel chain Wyndham Grand","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/wyndhamgrandbatumigonio.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/news\/44987","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/types\/news"}],"wp:attachment":[{"href":"https:\/\/wyndhamgrandbatumigonio.com\/en\/wp-json\/wp\/v2\/media?parent=44987"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}