fbpx

01.02.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — Dismantling of the floor slab formwork continues in Block A. Installation of staircase formwork has started. Excavation works are underway in Block B. In Block E the walls are being laid with ceramic block and the staircase formwork is being installed.