01.06.2024 — Wyndham Grand Residences Batumi Gonio. Aqua — Installation of technological openings has been started on the 8th construction (7 hotel) floor, the monolithic sides of balcony framing are being installed on the 5th (4th) floor.

Natalya
Sales manager
Customer Service Department Venyoo