fbpx

01.12.2023 — Wyndham Grand Residences Batumi Gonio. Aqua — Reinforcement of the floor slab continues on the 18th construction (17th hotel) floor. Wall masonry with ceramic block is in progress on the 8th (7) and 9th (8) floors.