fbpx

02.04.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — In Block A the walls are being laid with ceramic block. Concreting of the second stage of vertical structures took place in Block B. As well as concreting of the foundation of the infrastructure building. Land works are in progress.