fbpx

03.05.2024 — Wyndham Grand Residences Batumi Gonio. Aqua — On the 19th construction floor (18 hotel floors) the ceramic block is being lifted and the walls are being laid. Technological openings are being made on the floors. Capital fencing continues to be installed on the territory.