fbpx

03.11.2023 — Wyndham Grand Residences Batumi Gonio. Riviera — Reinforcement of the 2nd floor floor slab continues in Block A. Work on waterproofing of the underground part of the foundation continues. In Block E, dismantling of the formwork for the vertical structures of the 3rd floor is underway, and the roof slab formwork is being installed.