fbpx

05.02.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — Dismantling of the floor slab formwork continues in Block A. In Block B, excavation works are in progress. In Block E, walls and partition walls are being laid with ceramic block and staircase formwork is being installed.