fbpx

05.06.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — Block A – on the 2nd floor the walls are being laid with ceramic block. Block C – installation of retaining wall formwork is in progress. Infrastructure building – reinforcement of staircases.