fbpx

08.03.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — In Block A, the walls are being laid with ceramic block. Reinforcement of the 2nd stage of the foundation slab continues in Block B. Earthworks are underway in Block C. Ceramic block walls and partitions are being laid in Block E.