fbpx

09.01.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — Block A: Installation of roof slab formwork continues in the first half. Dismantling of the roof slab formwork started in the second half. Block B: Excavation works are in progress. Block E: On the floors, masonry walls and partitions are being laid.