10.05.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — In Block A on the second floor, ceramic block walling continues. In Block B, reinforcement and formwork installation of the floor slab is in progress. Reinforcement of the floor slab is underway in the infrastructure building.