fbpx

10.09.2024 — Elite Family Residence — Finishing of the southern and western facade, installation of metal railings, waterproofing of the fire tank, and installation of the external sewerage system are in progress. On the ground floor the walls are being finished. On the first floor – installation of plasterboard rails for ceilings and electrical work (wiring, continuity testing).