fbpx

10.09.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — Plastering of arches is in progress. In Block A – monolithic boards for stained glass windows and drilling of technological holes. In Block B – laying of ceramic block (first floor) and fireplaces. In block C – the device of fences (ground floor) and installation of formwork for the floor (third floor). In Block E – concreting of parapets.

Natalya
Sales manager
Customer Service Department Venyoo