fbpx

11.01.2024 — Wyndham Grand Residences Batumi Gonio. Aqua — Work continues on the installation of the formwork for the floor slab of the 20th construction (19th hotel) floor. Loading of equipment has been carried out. Ceramic block masonry walls are being laid on the 13th (12th) floor.