fbpx

11.02.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — In Block A, dismantling of the floor slab formwork is in progress. In the first part of Block B, the reinforcement of the foundation slab continues. In Block E, walls and internal partition walls are being laid with ceramic block on the floors.