fbpx

11.03.2024 — Wyndham Grand Residences Batumi Gonio. Aqua — Monolithic frame works on the site have been completed with concreting of lift shaft covers. On the 16th construction floor (15th hotel floor) the masonry of walls with ceramic block continues.