11.03.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — In Block A, block masonry on the floors is in progress. In Block B, reinforcement of the 2nd stage of the foundation slab is in progress. Excavation works are being carried out in Block C. In block E the walls are being laid with ceramic block.