fbpx

12.07.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — On the 3rd floor of Block A, wall masonry with ceramic block continues. The floor slab formwork is being assembled in block C. Staircase formwork is being assembled in block E. Reinforcement of the floor slab continues in the infrastructure building.