fbpx

12.09.2023 – Elite Family Residence – Reinforcement of vertical structures continues on the 7th construction (6th residential) floor. On the 2nd (1) floor, the walls are being laid with ceramic block. Building materials are being loaded on floors 3(2) and 4 (3).