fbpx

12.09.2024 — Elite Family Residence — Finishing of the northern and western facade, installation of metal railings and balusters, waterproofing of fire tanks, water outlets, and installation of reducers are in progress. On the ground floor, finishing of walls is in progress. On the first floor – installation of guides for plasterboard on the ceilings. On the third and fourth floor – electrical installation works (wiring, checking the integrity of the third floor).