fbpx

12.09.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — In Block A, monolithic boards for stained glass windows and drilling of technological holes in the floor slabs are being installed. In Block B – laying of ceramic block (first floor) and fireplaces, as well as concreting of the parapet. In Block C – installation of slab formwork (third floor) and fencing (ground floor).