fbpx

13.09.2023 – Elite Family Residence – Reinforcement of vertical structures continues on the 7th construction (6th residential) floor. Ceramic block wall masonry is underway on the 2nd (1) floor. Building materials are being loaded on 3(2) and 4 (3).