fbpx

13.09.2023 – Wyndham Grand Residences Batumi Gonio. Aqua – Reinforcement of columns on the 14th construction floor (13th hotel floor) and installation of fence posts is in progress. On 3 (2) and 4 (3) the laying of ceramic block walls is in progress.