13.09.2024 — Elite Family Residence — Finishing of the eastern and western facade, installation of metal railings, waterproofing of fire tanks, water outlets, installation of reducers is in progress. On the ground floor, finishing of walls is in progress. On the first floor – installation of plasterboard rails for ceilings. On the third and fourth floors – electrical installation works (wiring, continuity testing).