13.09.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — In Block A, monolithic boards for stained glass windows are being installed, drilling of technological holes in floor slabs, and installation of staircases. In Block B – laying of ceramic block (first floor) and fireplaces, as well as concreting of the parapet. In Block C – installation of floor slab formwork (third floor) and fencing (ground floor).