14.10.2023 — Wyndham Grand Residences Batumi Gonio. Aqua — On the 16th construction floor (15th hotel floor), geodetic works on column axes have been carried out. Reinforcement of the columns has started and welding of the safety columns has begun. On the 6(5) floor, the masonry of the walls with ceramic block continues.