fbpx

15.01.2024 — Wyndham Grand Residences Batumi Gonio.Family Club — Block A: Concreting of the first stage of columns was carried out on the 3rd floor. Dismantling of the floor slab formwork continues on the 2nd floor. Block B: Preparation for concreting of the foundation slab is underway.