fbpx

16.12.2023 — Wyndham Grand Residences Batumi Gonio. Riviera — In Block A on the 3rd floor, work continues on the installation of vertical structures. Lighting is being installed. Ground works are being carried out in Block B. In Block E, masonry of the parapet with ceramic block on the roof continues.