fbpx

17.03.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — Excavation works for the foundation excavation of the infrastructure building continue. In Block A, the walls are being laid with ceramic block and geodetic marking is in progress. In Block B – reinforcement of the basement walls.