fbpx

17.05.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — In Block A, wall masonry with ceramic block continues. Concreting of the floor slab has been carried out in Block B. Excavation works are underway in Block C. Concreting of columns is completed in the infrastructure building.