fbpx

17.10.2023 — Wyndham Grand Residences Batumi Gonio. Aqua — On the 16th construction (15 hotel) floor, dismantling of the floor slab formwork has been completed and reinforcement of the columns continues. On the 6th (5) floor masonry walls are being laid, on the 7th (6) floor building materials are being loaded.