fbpx

18.03.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — Excavation works for the foundation of the infrastructure building are in progress. Ceramic block walling is underway in Block A. Reinforcement of the basement walls is underway in Block B. Excavation works are underway in Block C.