fbpx

18.10.2023 — Wyndham Grand Residences Batumi Gonio. Aqua — Installation of column formwork is underway on the 16th construction (15 hotel) floor. On 6 (5) the masonry walls continue to be built. Loading of building materials is underway on the 7(6) and 14 (13) floors.