fbpx

20.09.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — In Block A, fireplaces are being laid, formwork is being installed on the terrace and the monolith of the staircases is being poured. In Block B – dismantling of formwork on the parapet, pouring of monolith on the parapet, laying of ceramic block (first floor).