20.12.2023 — Wyndham Grand Residences Batumi Gonio. Riviera — Installation of the formwork for the 3rd floor columns is taking place in the 1st half of Block A. Earthworks are taking place in Block B. In Block E, masonry of walls and partitions on the floors is in progress.