fbpx

21.02.2024 — Wyndham Grand Residences Batumi Gonio. Aqua — On the 16th construction (15th hotel) floor the masonry of walls with ceramic block continues, and on the roof the reinforcement of parapets and elevator shaft exits is in progress.