21.05.2024 — Wyndham Grand Residences Batumi Gonio. Family Club — Block A – concreting of the roof slab has been carried out. Monolithic frame works in the block are completed. Wall masonry with ceramic block on the 1st floor is in progress. Block B – reinforcement and installation of formwork for columns of the 3rd floor.