fbpx

21.10.2023 — Wyndham Grand Residences Batumi Gonio. Aqua — On the 16th construction (15th hotel) floor the installation of column formwork is in progress. On 6(5) the ceramic block wall masonry continues, on 7(6) the ceramic block wall masonry has started.